Deck 4: Strategic Capacity Management

Full screen (f)
exit full mode
Question
A piece of equipment with twice the capacity of another piece typically costs twice as much to purchase and to operate.
Use Space or
up arrow
down arrow
to flip the card.
Question
Capacity planning is generally viewed in three time durations: Immediate,Intermediate and Indeterminate.
Question
Making adjustments to eliminate the variance between planned and actual output is tied into intermediate range capacity planning.
Question
The ultimate in plant flexibility is a one-hour-changeover time plant.
Question
Overtime and personnel transfers are solutions to capacity problems in the intermediate term.
Question
Capacity can be defined as the amount of available resource inputs relative to requirements for output over a particular period of time.
Question
The problem of keeping demand sufficiently high to keep a large factory busy is a sales issue and not a diseconomy of scale.
Question
The objective of strategic capacity planning is to determine the overall capacity level of capital intensive resources (including facilities,equipment,and overall labor force size)that best supports the company's long-range competitive strategy.
Question
The objective of strategic capacity planning is to determine the overall capacity level of capital intensive resources (including facilities,equipment,and overall labor force size)that best supports the company's short-range competitive strategy.
Question
Long-range capacity planning requires top management participation.
Question
Best operating level is usually a multiple of the level of capacity for which a process was designed.
Question
Capacity can be defined as the ability to hold,receive,store,or accommodate.
Question
When evaluating capacity,managers need to consider both resource inputs and product outputs.
Question
A production facility works best when it focuses on a fairly limited set of production objectives.
Question
The basic notion of economies of scale is that as a plant gets larger and volume increases,the average cost per unit of output drops.
Question
Best operating level is the volume of output at which average unit cost is minimized.
Question
The capacity utilization rate is found by dividing best operating level by capacity used.
Question
At some point,the size of a growing plant can become too large and diseconomies of scale become a capacity planning problem.
Question
The objective of strategic capacity planning is to provide an approach for determining the overall capacity level of labor-intensive resources.
Question
A production facility develops virtuosity and works best when it focused on a widely varied set of production objectives.
Question
The capacity cushion is the ratio of capacity used to the best capacity level.
Question
The larger the capacity cushion the better.
Question
In decision tree analysis the time value of money is ignored because you are only concerned with cash costs.
Question
Outsourcing is a common source of external capacity.
Question
The frequency of adding to productive capacity should balance the costs of upgrading too frequently and the costs of upgrading too infrequently.
Question
The ability to rapidly and inexpensively switch production from one product to another enables what are sometimes referred to as:

A) Economies of scale
B) Economies of size
C) Economies of shape
D) Economies of scope
E) Economies of shipping
Question
The smaller the capacity cushion the better.
Question
Capacity flexibility means having the ability to rapidly increase or decrease production levels,or to shift production capacity quickly from one product or service to another.
Question
In a decision tree,the only time probabilities are applied to a decision node is when the decision is being made by someone else such as you customer or your competitor.
Question
Sharing capacity is a common source of external capacity.
Question
A capacity cushion is the amount of capacity less than expected demand.
Question
A decision tree problem does not need probabilities or payoffs to generate a solution.
Question
The probability of each occurrence at a decision tree chance node is the reciprocal of the number of possibilities at the chance node.
Question
In practice,achieving a perfectly balanced plant is usually desirable but impossible.
Question
In practice achieving a perfectly balanced plant is usually both impossible and undesirable.
Question
When a firm's design capacity is less than the capacity required to meet its demand,it is said to have a negative capacity cushion.
Question
In solving a decision tree problem,calculations start at the ends of the "branches" of the tree and work backwards to the base of the tree.
Question
Low rates of capacity utilization in service organizations are never appropriate.
Question
Because services cannot be stored for later use,service managers consider time as one of their supplies or resources.
Question
Economies of scope exist when multiple products can be produced at a lower cost in combination than they can separately.
Question
If demand for product "A" were forecast at 1,000,000 units for the coming year and your factory has one machine capable of producing 4,500 units per week,how many similar machines might you plan to acquire? ___________________
Question
When deciding to add capacity to a factory which of the following need not be considered?

A) Maintaining system balance
B) The frequency of capacity additions
C) Use of external capacity
D) Immediate product demand
E) Availability of raw materials
Question
Which of the following is not a step used in determining production capacity requirements?

A) Forecasting to predict product sales
B) Forecasting raw material usage
C) Projecting availability of labor
D) Calculating equipment and labor needs
E) Projecting equipment availability
Question
Capacity planning involving acquisition or disposal of fixed assets such as buildings,equipment or facilities is considered as which one of the following planning horizons?

A) Intermediate-range
B) Long-range
C) Short-range
D) Current
E) Upcoming
Question
The capacity focus concept can be put into practice through a mechanism called which of the following?

A) Best operating level (BOL)
B) Plant within a plant (PWP)
C) Total quality management (TQM)
D) Capacity utilization rate (CUR)
E) Zero-changeover-time (ZXT)
Question
What is an important difference between capacity planning in services as contrasted to capacity planning in manufacturing operations?

A) Time
B) Location
C) Demand volatility
D) Utilization impacts service
E) All of the above
Question
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units,what is the capacity utilization rate? ____________________
Question
Capacity planning involving consideration of production scheduling and inventory position is characterized by which one of the following time durations?

A) Intermediate-range
B) Long-range
C) Short-range
D) Current
E) Upcoming
Question
A chance node on a decision tree has four possible outcomes each worth $100,000.The probabilities of the outcomes occurring are assessed as 10%,27%,43% and 20%.What is the expected value of this chance node? ____________________
Question
If the actual output of a piece of equipment during an hour is 500 units and it's best operating level is at a rate of 400 units per hour,which of the following is the capacity utilization rate?

A) 0.75
B) 1.00
C) 1.25
D) 1.33
E) 100
Question
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units,which of the following is the capacity utilization rate?

A) 0.75
B) 1.00
C) 1.33
D) 2.33
E) 300
Question
At a decision point in a decision tree,which machine would you select when trying to maximize payoff when the anticipated benefit of selecting machine A is $45,000 with a probability of 90%;the expected benefit of selecting machine B is $80,000 with a probability of 50% and the expected benefit of selecting machine C is $60,000 with a probability of 75%?

A) Machine A
B) Machine B
C) Machine C
D) You would be indifferent between machines A and C
Question
A chance node on a decision tree has four possible outcomes worth $10,000,$20,000,$30,000 and minus $100,000 respectively.The probabilities of these outcomes occurring are assessed as 10%,25%,50% and 15% correspondingly.What is the expected value of this chance node? _________________________
Question
Compared with a service operation,a manufacturing operation's capacity is which of the following?

A) More dependent on time and location
B) Subject to more volatile demand fluctuations
C) Utilization more directly impacts quality
D) Demand can be smoothed by inventory policies
E) More capable of reacting to demand fluctuations
Question
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units,which of the following is the capacity cushion?

A) 25 percent
B) 100 units per hour
C) 75 percent
D) 125 percent
E) 133 percent
Question
If demand for product "A" were forecast at 1,000,000 units for the coming year and your factory has trained labor and equipment sufficient to produce 150,000 units per month,is the capacity cushion positive or negative? ____________________
Question
Capacity planning that involves hiring,layoffs,some new tooling,minor equipment purchases,and subcontracting is considered as which one of the following planning horizons?

A) Intermediate range
B) Long range
C) Short range
D) Current
E) Upcoming
Question
If demand for product "A" were forecast at 1,000,000 units for the coming year and your factory has one machine capable of producing 75,000 units per month,how much of product "A" might you plan to acquire through outsourcing? _______________
Question
The way to build in greater flexibility in your workers is to do which of the following?

A) Pay higher wages to motivate a willingness to do a variety to tasks
B) Provide a broader range of training
C) Provide a wide variety of technology to augment workers skills
D) Institute a "pay for skills" program
E) Use part-time employees with specialized skills as needed
Question
Which of the following models uses a schematic model of the sequence of steps in a problem and the conditions and consequences of each step?

A) Probability indexing
B) Johnson's sequencing rule
C) Decision trees
D) Activity System Maps
E) Decision mapping
Question
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units,what is the capacity cushion? __________________
Question
Describe the relationship between capacity utilization and quality in a service operation.
Question
Why does volatility of demand have a higher effect on a service delivery system than on a manufacturing system?
Question
What is a capacity cushion and why would a firm have one?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/64
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 4: Strategic Capacity Management
1
A piece of equipment with twice the capacity of another piece typically costs twice as much to purchase and to operate.
False
Explanation: The basic notion of economies of scale is that as a plant gets larger and volume increases,the average cost per unit of output drops.This is partially due to lower operating and capital cost,because a piece of equipment with twice the capacity of another piece typically does not cost twice as much to purchase or operate.
2
Capacity planning is generally viewed in three time durations: Immediate,Intermediate and Indeterminate.
False
Explanation: The correct answer is long-range,intermediate-range and short-range.
3
Making adjustments to eliminate the variance between planned and actual output is tied into intermediate range capacity planning.
False
Explanation: Short range -less than one month.This is tied into the daily or weekly scheduling process and involves making adjustments to eliminate the variance between planned and actual output.This includes alternatives such as overtime,personnel transfers,and alternative production routings.
4
The ultimate in plant flexibility is a one-hour-changeover time plant.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
5
Overtime and personnel transfers are solutions to capacity problems in the intermediate term.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
6
Capacity can be defined as the amount of available resource inputs relative to requirements for output over a particular period of time.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
7
The problem of keeping demand sufficiently high to keep a large factory busy is a sales issue and not a diseconomy of scale.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
8
The objective of strategic capacity planning is to determine the overall capacity level of capital intensive resources (including facilities,equipment,and overall labor force size)that best supports the company's long-range competitive strategy.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
9
The objective of strategic capacity planning is to determine the overall capacity level of capital intensive resources (including facilities,equipment,and overall labor force size)that best supports the company's short-range competitive strategy.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
10
Long-range capacity planning requires top management participation.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
11
Best operating level is usually a multiple of the level of capacity for which a process was designed.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
12
Capacity can be defined as the ability to hold,receive,store,or accommodate.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
13
When evaluating capacity,managers need to consider both resource inputs and product outputs.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
14
A production facility works best when it focuses on a fairly limited set of production objectives.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
15
The basic notion of economies of scale is that as a plant gets larger and volume increases,the average cost per unit of output drops.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
16
Best operating level is the volume of output at which average unit cost is minimized.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
17
The capacity utilization rate is found by dividing best operating level by capacity used.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
18
At some point,the size of a growing plant can become too large and diseconomies of scale become a capacity planning problem.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
19
The objective of strategic capacity planning is to provide an approach for determining the overall capacity level of labor-intensive resources.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
20
A production facility develops virtuosity and works best when it focused on a widely varied set of production objectives.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
21
The capacity cushion is the ratio of capacity used to the best capacity level.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
22
The larger the capacity cushion the better.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
23
In decision tree analysis the time value of money is ignored because you are only concerned with cash costs.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
24
Outsourcing is a common source of external capacity.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
25
The frequency of adding to productive capacity should balance the costs of upgrading too frequently and the costs of upgrading too infrequently.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
26
The ability to rapidly and inexpensively switch production from one product to another enables what are sometimes referred to as:

A) Economies of scale
B) Economies of size
C) Economies of shape
D) Economies of scope
E) Economies of shipping
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
27
The smaller the capacity cushion the better.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
28
Capacity flexibility means having the ability to rapidly increase or decrease production levels,or to shift production capacity quickly from one product or service to another.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
29
In a decision tree,the only time probabilities are applied to a decision node is when the decision is being made by someone else such as you customer or your competitor.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
30
Sharing capacity is a common source of external capacity.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
31
A capacity cushion is the amount of capacity less than expected demand.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
32
A decision tree problem does not need probabilities or payoffs to generate a solution.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
33
The probability of each occurrence at a decision tree chance node is the reciprocal of the number of possibilities at the chance node.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
34
In practice,achieving a perfectly balanced plant is usually desirable but impossible.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
35
In practice achieving a perfectly balanced plant is usually both impossible and undesirable.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
36
When a firm's design capacity is less than the capacity required to meet its demand,it is said to have a negative capacity cushion.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
37
In solving a decision tree problem,calculations start at the ends of the "branches" of the tree and work backwards to the base of the tree.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
38
Low rates of capacity utilization in service organizations are never appropriate.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
39
Because services cannot be stored for later use,service managers consider time as one of their supplies or resources.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
40
Economies of scope exist when multiple products can be produced at a lower cost in combination than they can separately.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
41
If demand for product "A" were forecast at 1,000,000 units for the coming year and your factory has one machine capable of producing 4,500 units per week,how many similar machines might you plan to acquire? ___________________
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
42
When deciding to add capacity to a factory which of the following need not be considered?

A) Maintaining system balance
B) The frequency of capacity additions
C) Use of external capacity
D) Immediate product demand
E) Availability of raw materials
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
43
Which of the following is not a step used in determining production capacity requirements?

A) Forecasting to predict product sales
B) Forecasting raw material usage
C) Projecting availability of labor
D) Calculating equipment and labor needs
E) Projecting equipment availability
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
44
Capacity planning involving acquisition or disposal of fixed assets such as buildings,equipment or facilities is considered as which one of the following planning horizons?

A) Intermediate-range
B) Long-range
C) Short-range
D) Current
E) Upcoming
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
45
The capacity focus concept can be put into practice through a mechanism called which of the following?

A) Best operating level (BOL)
B) Plant within a plant (PWP)
C) Total quality management (TQM)
D) Capacity utilization rate (CUR)
E) Zero-changeover-time (ZXT)
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
46
What is an important difference between capacity planning in services as contrasted to capacity planning in manufacturing operations?

A) Time
B) Location
C) Demand volatility
D) Utilization impacts service
E) All of the above
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
47
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units,what is the capacity utilization rate? ____________________
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
48
Capacity planning involving consideration of production scheduling and inventory position is characterized by which one of the following time durations?

A) Intermediate-range
B) Long-range
C) Short-range
D) Current
E) Upcoming
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
49
A chance node on a decision tree has four possible outcomes each worth $100,000.The probabilities of the outcomes occurring are assessed as 10%,27%,43% and 20%.What is the expected value of this chance node? ____________________
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
50
If the actual output of a piece of equipment during an hour is 500 units and it's best operating level is at a rate of 400 units per hour,which of the following is the capacity utilization rate?

A) 0.75
B) 1.00
C) 1.25
D) 1.33
E) 100
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
51
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units,which of the following is the capacity utilization rate?

A) 0.75
B) 1.00
C) 1.33
D) 2.33
E) 300
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
52
At a decision point in a decision tree,which machine would you select when trying to maximize payoff when the anticipated benefit of selecting machine A is $45,000 with a probability of 90%;the expected benefit of selecting machine B is $80,000 with a probability of 50% and the expected benefit of selecting machine C is $60,000 with a probability of 75%?

A) Machine A
B) Machine B
C) Machine C
D) You would be indifferent between machines A and C
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
53
A chance node on a decision tree has four possible outcomes worth $10,000,$20,000,$30,000 and minus $100,000 respectively.The probabilities of these outcomes occurring are assessed as 10%,25%,50% and 15% correspondingly.What is the expected value of this chance node? _________________________
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
54
Compared with a service operation,a manufacturing operation's capacity is which of the following?

A) More dependent on time and location
B) Subject to more volatile demand fluctuations
C) Utilization more directly impacts quality
D) Demand can be smoothed by inventory policies
E) More capable of reacting to demand fluctuations
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
55
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units,which of the following is the capacity cushion?

A) 25 percent
B) 100 units per hour
C) 75 percent
D) 125 percent
E) 133 percent
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
56
If demand for product "A" were forecast at 1,000,000 units for the coming year and your factory has trained labor and equipment sufficient to produce 150,000 units per month,is the capacity cushion positive or negative? ____________________
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
57
Capacity planning that involves hiring,layoffs,some new tooling,minor equipment purchases,and subcontracting is considered as which one of the following planning horizons?

A) Intermediate range
B) Long range
C) Short range
D) Current
E) Upcoming
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
58
If demand for product "A" were forecast at 1,000,000 units for the coming year and your factory has one machine capable of producing 75,000 units per month,how much of product "A" might you plan to acquire through outsourcing? _______________
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
59
The way to build in greater flexibility in your workers is to do which of the following?

A) Pay higher wages to motivate a willingness to do a variety to tasks
B) Provide a broader range of training
C) Provide a wide variety of technology to augment workers skills
D) Institute a "pay for skills" program
E) Use part-time employees with specialized skills as needed
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
60
Which of the following models uses a schematic model of the sequence of steps in a problem and the conditions and consequences of each step?

A) Probability indexing
B) Johnson's sequencing rule
C) Decision trees
D) Activity System Maps
E) Decision mapping
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
61
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units,what is the capacity cushion? __________________
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
62
Describe the relationship between capacity utilization and quality in a service operation.
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
63
Why does volatility of demand have a higher effect on a service delivery system than on a manufacturing system?
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
64
What is a capacity cushion and why would a firm have one?
Unlock Deck
Unlock for access to all 64 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 64 flashcards in this deck.