Deck 8: Determining How Costs Behave

Full screen (f)
exit full mode
Question
A mixed cost is also called a semivariable cost because it has both fixed and variable elements.
Use Space or
up arrow
down arrow
to flip the card.
Question
In the cost function y = $10,000,the fixed cost of $10,000 is called a/an ________.

A)mixed
B)constant
C)variable
D)estimation
E)prediction
Question
The accounting manager at the Globe Factory reported telephone charges of $2,500 per month plus $1.50 per minute.Write a linear cost function equation to represent the cost.
Question
The vertical axis is called the ________.

A)a-axis
B)b-axis
C)x-axis
D)y-axis
E)z-axis
Question
A/an ________ is a function that measures the decline in cost per unit in various business functions of the value chain as the amount of activities increase.

A)learning curve
B)experience curve
C)variable-cost function
D)step cost function
E)nonlinear cost function
Question
The Viola Shoppe has 25 employees that work full time.Twenty of the employees are salaried employees paid $5,000 per month.How does the manager at the Viola Shoppe classify the total costs?

A)Fixed.
B)Mixed.
C)Variable.
D)Estimation.
E)Cost function.
Question
The cost function y = $10,000:

A)represents a mixed cost.
B)represents a fixed cost.
C)represents a variable cost.
D)is a constant that does not account for costs.
E)is a variance that has changes in activities.
Question
In a/an ________,the graph of total costs is not a straight line within the relevant range.

A)cost object
B)learning curve
C)experience curve
D)step cost function
E)nonlinear cost function
Question
In a step variable-cost function,the cost remains the same over various ranges of the level of activity in each relevant range.
Question
A/an ________ is a function that measures how labor-hours per unit decline as units of production increase because workers are learning and becoming better at their jobs.

A)learning curve
B)experience curve
C)variable-cost function
D)step cost function
E)nonlinear cost function
Question
The cost function y = $3,000 + $2X:

A)represents a fixed cost.
B)represents a mixed cost.
C)represents a variable cost.
D)has a constant of $3002X.
E)has a constant of intercept 2X.
Question
The Parker Cellular Company is charged a total cost that changes in proportion to the number of minutes used.The number of minutes used is the only factor that causes a change in total cost.How would the managerial accountant classify total costs of phone charges?

A)Fixed.
B)Mixed.
C)Variable.
D)Fixed cost in the relevant range.
E)Mixed cost in the relevant range.
Question
The horizontal axis is called the ________.

A)a-axis
B)b-axis
C)x-axis
D)y-axis
E)z-axis
Question
A mathematical description of how a cost changes with changes in the level of an activity relating to that cost is a ________.

A)cost function
B)mixed cost
C)semivariable cost
D)nonlinear cost function
E)step cost function
Question
Cost behavior is not approximated by a linear cost function within the relevant range.
Question
The accounting manager at the Peanut Factory reported direct manufacturing labor cost of $14 per hour.Write a linear cost function equation to represent the cost.Use y for estimated costs and X to represent the activity of the cost driver.
Question
Direct material costs are not always linear variable costs as a result of quantity discounts on direct material purchases.
Question
A/an ________ is the component of total cost that does not vary with changes in levels of activity.

A)constant
B)intercept
C)mixed cost
D)variable cost
E)cost estimation
Question
Variations in the level of a single activity explain variations in the related ________.

A)total costs
B)mixed costs
C)linear costs
D)nonlinear costs
E)regression analysis
Question
Step-cost functions are examples of nonlinear cost functions.
Question
Which of the following estimation methods estimates cost functions by analyzing the relationship between inputs and outputs in physical terms?

A)Industrial Engineering Method.
B)Conference Method.
C)Account Analysis Method.
D)Quantitative Analysis Method.
E)Mixed Approach Method.
Question
In which step of the decision process does a manager gather potential information about the cost driver?

A)Step 1: Identify the Problem and Uncertainties.
B)Step 2: Obtain Information.
C)Step 3: Make Predictions about the Future.
D)Step 4: Make Decisions by Choosing among the Alternatives.
E)Step 5: Implement the Decision,Evaluate Performance,and Learn.
Question
Only a cause-and-effect relationship,not merely correlation,establishes an economically plausible relationship between the level of an activity and its costs.
Question
What does a managerial accountant do when he or she can't classify costs into a fixed or variable cost?
Question
What is the impact of price breaks on direct material costs?
Question
Managers use cost estimation to measure a relationship based on data from past costs.
Question
Which of the following estimation methods is used by managers to estimate cost functions on the basis of opinions about costs and their drivers of a company gathered from various departments?

A)Industrial Engineering Method.
B)Conference Method.
C)Account Analysis Method.
D)Quantitative Analysis Method.
E)Work-Measurement Method.
Question
Which of the following is not a representation of a cause-and-effect relationship?

A)A physical relationship between the level of activity and costs.
B)Units of production are used as the activity that affects direct material costs.
C)A contractual agreement.
D)Knowledge of operations.
E)A contract that fails to specify the number of parts used as the activity measure of ordering costs.
Question
Which of the following estimation method is used by managers to estimate cost functions when they classify various cost accounts as variable,fixed,or mixed in regard to the identified level of activity?

A)Industrial Engineering Method.
B)Conference Method.
C)Account Analysis Method.
D)Quantitative Analysis Method.
E)Work-Measurement Method.
Question
Variable and fixed cost behavior patterns are not valid for linear cost functions within a given relevant range.
Question
Better cost predictions do not help managers make informed planning and control decisions,such as preparing next year's customer-service budget.
Question
Why are learning curves important to managers?
Question
In which step of the decision process would managers use the regression analysis estimate of indirect manufacturing costs of alternative products,and choose to introduce the most profitable styles?

A)Step 1: Identify the Problem and Uncertainties.
B)Step 2: Obtain Information.
C)Step 3: Make Predictions about the Future.
D)Step 4: Make Decisions by Choosing among the Alternatives.
E)Step 5: Implement the Decision,Evaluate Performance,and Learn.
Question
In which step of the decision process do managers use past data to estimate the relationship of cost drivers compared to costs?

A)Step 1: Identify the Problem and Uncertainties.
B)Step 2: Obtain Information.
C)Step 3: Make Predictions about the Future.
D)Step 4: Make Decisions by Choosing among the Alternatives.
E)Step 5: Implement the Decision,Evaluate Performance,and Learn.
Question
In which step of the decision process are managers fairly confident about the direct material and direct manufacturing labor costs associated with a product or service?

A)Step 1: Identify the Problem and Uncertainties.
B)Step 2: Obtain Information.
C)Step 3: Make Predictions about the Future.
D)Step 4: Make Decisions by Choosing among the Alternatives.
E)Step 5: Implement the Decision,Evaluate Performance,and Learn.
Question
In which step of the decision process do managers compare predicted costs to determine the accuracy of predictions?

A)Step 1: Identify the Problem and Uncertainties.
B)Step 2: Obtain Information.
C)Step 3: Make Predictions about the Future.
D)Step 4: Make Decisions by Choosing among the Alternatives.
E)Step 5: Implement the Decision,Evaluate Performance,and Learn.
Question
The longer the time horizon,all other things being equal,the more likely that the cost will be variable.
Question
Managers must be careful not to interpret a high correlation,or connection,in the relationship between two variables to mean that either variable causes the other.
Question
Why do managers identify cost drivers on a long-time horizon?
Question
Costs in a step cost function increase by discrete amounts as the level of activity increases from one range to the next.
Question
Many organizations use the industrial engineering method to estimate direct manufacturing costs but find it too costly or impractical for analyzing their entire cost structure.
Question
The manager at the Center of Research encourages interdepartmental coordination among the staff,and the pooling of expert knowledge from different business functions.The manager is concerned because the costing method implemented at the company is based on opinions rather than systematic estimation.This creates issues because the accuracy of the cost estimates is based on the skill of the employees that provide inputs.What cost estimation is implemented at the Center of Research?

A)Industrial Engineering Method.
B)Conference Method.
C)Account Analysis Method.
D)Quantitative Analysis Method.
E)Work Measurement Method.
Question
In which step of estimating a cost function using quantitative analysis do managers realize the relationship between the driver and costs is approximately linear,or there was an error in recording the data?

A)Step 1: Choose the Dependent Variable.
B)Step 2: Identify the Independent Variable,or Cost Driver.
C)Step 3: Collect Data of the Dependent Variable and the Cost Driver.
D)Step 4: Plot the Data.
E)Step 5: Estimate the Cost Driver of the Estimated Cost Function.
Question
The manager at Mymic,LLC,a government contracting firm,uses a cost-estimation method to estimate direct manufacturing costs.The manager complained to the managerial accountant because the relationship between inputs and outputs are difficult to specify for the items related to indirect manufacturing costs and R&D costs.Which cost estimation method do they use at the company?

A)Industrial Engineering Method.
B)Conference Method.
C)Account Analysis Method.
D)Quantitative Analysis Method.
E)High-Low Method.
Question
Which of the following cost-estimation methods uses a formal mathematical method to fit cost functions to past data and observations?

A)Industrial Engineering Method.
B)Conference Method.
C)Account Analysis Method.
D)Quantitative Analysis Method.
E)Work-Measurement Method.
Question
In which step of estimating a cost function using quantitative analysis would a manager estimate a cost function with the high-low method,or regression analysis?

A)Step 1: Choose the Dependent Variable
B)Step 2: Identify the Independent Variable,or Cost Driver.
C)Step 3: Collect Data of the Dependent Variable of the Cost Driver.
D)Step 4: Plot the Data.
E)Step 5: Estimate the Cost Driver of the Estimated Cost Function.
Question
The Clean Manufacturing Company reported the following information in November:
<strong>The Clean Manufacturing Company reported the following information in November:   Indirect manufacturing labor hours = $3,750 + ($15 per machine hour × 925 machine hours). Required: Use the account analysis method and choose the linear cost equation to represent this data.</strong> A)x = a × bX B)y = b × aX C)x = b + aX D)y = a + bX E)z = a - bX <div style=padding-top: 35px>
Indirect manufacturing labor hours = $3,750 + ($15 per machine hour × 925 machine hours).
Required:
Use the account analysis method and choose the linear cost equation to represent this data.

A)x = a × bX
B)y = b × aX
C)x = b + aX
D)y = a + bX
E)z = a - bX
Question
The managerial accountant at the Candle Shoppe uses the high-low method to estimate its cost function.The managerial accountant reported the following information in 2012:
<strong>The managerial accountant at the Candle Shoppe uses the high-low method to estimate its cost function.The managerial accountant reported the following information in 2012:   Required: Compute the slope coefficient per machine-hour.</strong> A)$100 B)$200 C)$300 D)$400 E)$500 <div style=padding-top: 35px>
Required:
Compute the slope coefficient per machine-hour.

A)$100
B)$200
C)$300
D)$400
E)$500
Question
The Photography Shoppe uses the high-low method and reported the following information to estimate the cost function.The managerial accountant provided the following information in 2012:
<strong>The Photography Shoppe uses the high-low method and reported the following information to estimate the cost function.The managerial accountant provided the following information in 2012:   Required: Compute the slope coefficient per machine-hour.</strong> A)$10 B)$20 C)$30 D)$40 E)$50 <div style=padding-top: 35px>
Required:
Compute the slope coefficient per machine-hour.

A)$10
B)$20
C)$30
D)$40
E)$50
Question
Excel is a useful tool for performing quantitative analysis.
Question
The quantitative analysis method is the most rigorous approach to estimate costs.
Question
In which step of estimating a cost function using quantitative analysis would a manager determine the dependent variable to use in a cost relationship?

A)Step 1: Choose the Dependent Variable.
B)Step 2: Identify the Independent Variable,or Cost Driver.
C)Step 3: Collect Data on the Dependent Variable and the Cost Driver.
D)Step 4: Plot the Data.
E)Step 5: Estimate the Cost Driver of the Estimated Cost Function.
Question
The managerial accountant at Hampson Company reported the following information:
<strong>The managerial accountant at Hampson Company reported the following information:   Required: Use the high-low method to compute the difference of the Cost Driver: Machine Hours,the Difference of the Indirect Manufacturing Labor,and the slope coefficient b for each machine hour.</strong> A)55;$855;$13.68 B)65;$905;$13.92 C)75;$910;$14.85 D)85;$925;$15.65 E)95;$950;$16.22 <div style=padding-top: 35px>
Required:
Use the high-low method to compute the difference of the Cost Driver: Machine Hours,the Difference of the Indirect Manufacturing Labor,and the slope coefficient b for each machine hour.

A)55;$855;$13.68
B)65;$905;$13.92
C)75;$910;$14.85
D)85;$925;$15.65
E)95;$950;$16.22
Question
The ________ uses only the highest and lowest observed values of the cost driver within the relevant range and their respective costs to estimate the slope coefficient and the constant of the cost function.

A)cost function
B)relevant range
C)high-low method
D)dependent variable
E)independent variable
Question
The managerial accountant at Hampson Company reported the following information:
<strong>The managerial accountant at Hampson Company reported the following information:   Use the high-low method to and use the highest observation of the cost driver to compute the constant a,using a slope coefficient of $13.92 per machine hour. A = y - BX At the highest observation of the cost driver,the constant,a,is:</strong> A)$75.60 B)$76.80 C)$75.62 D)$79.60 E)$81.24 <div style=padding-top: 35px>
Use the high-low method to and use the highest observation of the cost driver to compute the constant a,using a slope coefficient of $13.92 per machine hour.
A = y - BX
At the highest observation of the cost driver,the constant,a,is:

A)$75.60
B)$76.80
C)$75.62
D)$79.60
E)$81.24
Question
Which of the following is the statistical method used by managers to measure the average amount of change in the dependent variable associated with a unit change in one or more independent variables?

A)Cost function.
B)Relevant range.
C)Account analysis.
D)High-low method.
E)Regression analysis.
Question
Which step of estimating a cost function using quantitative analysis is the most difficult step for a manager to implement in cost analysis?

A)Step 1: Choose the Dependent Variable.
B)Step 2: Identify the Independent Variable,or Cost Driver.
C)Step 3: Collect Data of the Dependent Variable and the Cost Driver.
D)Step 4: Plot the Data.
E)Step 5: Estimate the Cost Driver of the Estimated Cost Function.
Question
In which step of estimating a cost function using quantitative analysis would a manager realize all items of costs in the dependent variable have different cost drivers?

A)Step 1: Choose the Dependent Variable.
B)Step 2: Identify the Independent Variable,or Cost Driver.
C)Step 3: Collect Data of the Dependent Variable and the Cost Driver.
D)Step 4: Plot the Data.
E)Step 5: Estimate the Cost Drive of the Estimated Cost Function.
Question
The pooling of expert knowledge from different business functions of the value chain gives the conference method credibility.
Question
Supplementing the account analysis method with the conference method reduces credibility.
Question
When all items of costs in the dependent variable do not have the same cost driver,the management accountant should consider creating homogeneous cost pools.
Question
Which of the following analyses estimates the relationship between the dependent variable and two or more independent variables?

A)Function.
B)Relevant range.
C)High-low method.
D)Simple regression.
E)Multiple regression.
Question
What is goodness-of-fit?
Question
The cost function y = 40 + 7X has a slope coefficient of 7.
Question
In the fuel service retail industry,two economically plausible cost drivers are gasoline and convenience store sales.
Question
What is r2,the coefficient of determination?
Question
The methods that use subjective assessments to choose a cost driver and to estimate the fixed and variable components of the cost function are:

A)conference and quantitative.
B)conference and regressions.
C)conference and simple regression.
D)conference and account analysis.
E)conference and industrial engineering.
Question
What forms of quantitative analysis do managers implement to estimate the cost function?
Question
Which of the following is the analysis that estimates the relationship between the dependent variable and one independent variable?

A)Cost function.
B)Relevant range.
C)High-low method.
D)Simple regression.
E)Multiple regression.
Question
The independent variable is the factor used to predict the dependent variable.
Question
There is a better fit between actual cost observations and estimated costs when the ________ is small.

A)residual term
B)fixed costs
C)machine hours
D)regression analysis
E)activity-based costing
Question
Why do managers plot data on graphs?
Question
A flat,or slightly sloped,regression line indicates:

A)a strong relationship between the cost driver and costs.
B)a weak relationship between the cost driver and costs.
C)an economically plausible relationship exists.
D)management should increase costs.
E)there is no relationship between the cost driver and costs.
Question
What is the ideal time-series database?
Question
The regression analysis approach illustrates how to evaluate different ________.

A)cost drivers
B)decision trees
C)high-low methods
D)detection systems
E)homogeneous relationships
Question
Why are a stable economy and technology important to managers?
Question
The vertical difference that is a measurement of the distance between actual cost and estimate cost for each observation of a cost driver is called the ________.

A)cost function
B)residual term
C)relevant range
D)high-low method
E)simple regression
Question
The method that relies on analyzing physical relationships between cost drivers and costs is ________.

A)conference
B)quantitative
C)account analysis
D)regression analysis
E)industrial engineering
Question
What is the difference between time-series data and cross-sectional data?
Question
The regression equation,y = $744.67 + $7.72X,could represent indirect manufacturing labor costs based on the number of direct manufacturing labor hours.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/97
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 8: Determining How Costs Behave
1
A mixed cost is also called a semivariable cost because it has both fixed and variable elements.
True
2
In the cost function y = $10,000,the fixed cost of $10,000 is called a/an ________.

A)mixed
B)constant
C)variable
D)estimation
E)prediction
B
3
The accounting manager at the Globe Factory reported telephone charges of $2,500 per month plus $1.50 per minute.Write a linear cost function equation to represent the cost.
y = $2,500 + $1.50X
4
The vertical axis is called the ________.

A)a-axis
B)b-axis
C)x-axis
D)y-axis
E)z-axis
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
5
A/an ________ is a function that measures the decline in cost per unit in various business functions of the value chain as the amount of activities increase.

A)learning curve
B)experience curve
C)variable-cost function
D)step cost function
E)nonlinear cost function
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
6
The Viola Shoppe has 25 employees that work full time.Twenty of the employees are salaried employees paid $5,000 per month.How does the manager at the Viola Shoppe classify the total costs?

A)Fixed.
B)Mixed.
C)Variable.
D)Estimation.
E)Cost function.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
7
The cost function y = $10,000:

A)represents a mixed cost.
B)represents a fixed cost.
C)represents a variable cost.
D)is a constant that does not account for costs.
E)is a variance that has changes in activities.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
8
In a/an ________,the graph of total costs is not a straight line within the relevant range.

A)cost object
B)learning curve
C)experience curve
D)step cost function
E)nonlinear cost function
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
9
In a step variable-cost function,the cost remains the same over various ranges of the level of activity in each relevant range.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
10
A/an ________ is a function that measures how labor-hours per unit decline as units of production increase because workers are learning and becoming better at their jobs.

A)learning curve
B)experience curve
C)variable-cost function
D)step cost function
E)nonlinear cost function
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
11
The cost function y = $3,000 + $2X:

A)represents a fixed cost.
B)represents a mixed cost.
C)represents a variable cost.
D)has a constant of $3002X.
E)has a constant of intercept 2X.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
12
The Parker Cellular Company is charged a total cost that changes in proportion to the number of minutes used.The number of minutes used is the only factor that causes a change in total cost.How would the managerial accountant classify total costs of phone charges?

A)Fixed.
B)Mixed.
C)Variable.
D)Fixed cost in the relevant range.
E)Mixed cost in the relevant range.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
13
The horizontal axis is called the ________.

A)a-axis
B)b-axis
C)x-axis
D)y-axis
E)z-axis
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
14
A mathematical description of how a cost changes with changes in the level of an activity relating to that cost is a ________.

A)cost function
B)mixed cost
C)semivariable cost
D)nonlinear cost function
E)step cost function
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
15
Cost behavior is not approximated by a linear cost function within the relevant range.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
16
The accounting manager at the Peanut Factory reported direct manufacturing labor cost of $14 per hour.Write a linear cost function equation to represent the cost.Use y for estimated costs and X to represent the activity of the cost driver.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
17
Direct material costs are not always linear variable costs as a result of quantity discounts on direct material purchases.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
18
A/an ________ is the component of total cost that does not vary with changes in levels of activity.

A)constant
B)intercept
C)mixed cost
D)variable cost
E)cost estimation
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
19
Variations in the level of a single activity explain variations in the related ________.

A)total costs
B)mixed costs
C)linear costs
D)nonlinear costs
E)regression analysis
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
20
Step-cost functions are examples of nonlinear cost functions.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
21
Which of the following estimation methods estimates cost functions by analyzing the relationship between inputs and outputs in physical terms?

A)Industrial Engineering Method.
B)Conference Method.
C)Account Analysis Method.
D)Quantitative Analysis Method.
E)Mixed Approach Method.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
22
In which step of the decision process does a manager gather potential information about the cost driver?

A)Step 1: Identify the Problem and Uncertainties.
B)Step 2: Obtain Information.
C)Step 3: Make Predictions about the Future.
D)Step 4: Make Decisions by Choosing among the Alternatives.
E)Step 5: Implement the Decision,Evaluate Performance,and Learn.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
23
Only a cause-and-effect relationship,not merely correlation,establishes an economically plausible relationship between the level of an activity and its costs.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
24
What does a managerial accountant do when he or she can't classify costs into a fixed or variable cost?
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
25
What is the impact of price breaks on direct material costs?
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
26
Managers use cost estimation to measure a relationship based on data from past costs.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
27
Which of the following estimation methods is used by managers to estimate cost functions on the basis of opinions about costs and their drivers of a company gathered from various departments?

A)Industrial Engineering Method.
B)Conference Method.
C)Account Analysis Method.
D)Quantitative Analysis Method.
E)Work-Measurement Method.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
28
Which of the following is not a representation of a cause-and-effect relationship?

A)A physical relationship between the level of activity and costs.
B)Units of production are used as the activity that affects direct material costs.
C)A contractual agreement.
D)Knowledge of operations.
E)A contract that fails to specify the number of parts used as the activity measure of ordering costs.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
29
Which of the following estimation method is used by managers to estimate cost functions when they classify various cost accounts as variable,fixed,or mixed in regard to the identified level of activity?

A)Industrial Engineering Method.
B)Conference Method.
C)Account Analysis Method.
D)Quantitative Analysis Method.
E)Work-Measurement Method.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
30
Variable and fixed cost behavior patterns are not valid for linear cost functions within a given relevant range.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
31
Better cost predictions do not help managers make informed planning and control decisions,such as preparing next year's customer-service budget.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
32
Why are learning curves important to managers?
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
33
In which step of the decision process would managers use the regression analysis estimate of indirect manufacturing costs of alternative products,and choose to introduce the most profitable styles?

A)Step 1: Identify the Problem and Uncertainties.
B)Step 2: Obtain Information.
C)Step 3: Make Predictions about the Future.
D)Step 4: Make Decisions by Choosing among the Alternatives.
E)Step 5: Implement the Decision,Evaluate Performance,and Learn.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
34
In which step of the decision process do managers use past data to estimate the relationship of cost drivers compared to costs?

A)Step 1: Identify the Problem and Uncertainties.
B)Step 2: Obtain Information.
C)Step 3: Make Predictions about the Future.
D)Step 4: Make Decisions by Choosing among the Alternatives.
E)Step 5: Implement the Decision,Evaluate Performance,and Learn.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
35
In which step of the decision process are managers fairly confident about the direct material and direct manufacturing labor costs associated with a product or service?

A)Step 1: Identify the Problem and Uncertainties.
B)Step 2: Obtain Information.
C)Step 3: Make Predictions about the Future.
D)Step 4: Make Decisions by Choosing among the Alternatives.
E)Step 5: Implement the Decision,Evaluate Performance,and Learn.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
36
In which step of the decision process do managers compare predicted costs to determine the accuracy of predictions?

A)Step 1: Identify the Problem and Uncertainties.
B)Step 2: Obtain Information.
C)Step 3: Make Predictions about the Future.
D)Step 4: Make Decisions by Choosing among the Alternatives.
E)Step 5: Implement the Decision,Evaluate Performance,and Learn.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
37
The longer the time horizon,all other things being equal,the more likely that the cost will be variable.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
38
Managers must be careful not to interpret a high correlation,or connection,in the relationship between two variables to mean that either variable causes the other.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
39
Why do managers identify cost drivers on a long-time horizon?
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
40
Costs in a step cost function increase by discrete amounts as the level of activity increases from one range to the next.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
41
Many organizations use the industrial engineering method to estimate direct manufacturing costs but find it too costly or impractical for analyzing their entire cost structure.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
42
The manager at the Center of Research encourages interdepartmental coordination among the staff,and the pooling of expert knowledge from different business functions.The manager is concerned because the costing method implemented at the company is based on opinions rather than systematic estimation.This creates issues because the accuracy of the cost estimates is based on the skill of the employees that provide inputs.What cost estimation is implemented at the Center of Research?

A)Industrial Engineering Method.
B)Conference Method.
C)Account Analysis Method.
D)Quantitative Analysis Method.
E)Work Measurement Method.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
43
In which step of estimating a cost function using quantitative analysis do managers realize the relationship between the driver and costs is approximately linear,or there was an error in recording the data?

A)Step 1: Choose the Dependent Variable.
B)Step 2: Identify the Independent Variable,or Cost Driver.
C)Step 3: Collect Data of the Dependent Variable and the Cost Driver.
D)Step 4: Plot the Data.
E)Step 5: Estimate the Cost Driver of the Estimated Cost Function.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
44
The manager at Mymic,LLC,a government contracting firm,uses a cost-estimation method to estimate direct manufacturing costs.The manager complained to the managerial accountant because the relationship between inputs and outputs are difficult to specify for the items related to indirect manufacturing costs and R&D costs.Which cost estimation method do they use at the company?

A)Industrial Engineering Method.
B)Conference Method.
C)Account Analysis Method.
D)Quantitative Analysis Method.
E)High-Low Method.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
45
Which of the following cost-estimation methods uses a formal mathematical method to fit cost functions to past data and observations?

A)Industrial Engineering Method.
B)Conference Method.
C)Account Analysis Method.
D)Quantitative Analysis Method.
E)Work-Measurement Method.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
46
In which step of estimating a cost function using quantitative analysis would a manager estimate a cost function with the high-low method,or regression analysis?

A)Step 1: Choose the Dependent Variable
B)Step 2: Identify the Independent Variable,or Cost Driver.
C)Step 3: Collect Data of the Dependent Variable of the Cost Driver.
D)Step 4: Plot the Data.
E)Step 5: Estimate the Cost Driver of the Estimated Cost Function.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
47
The Clean Manufacturing Company reported the following information in November:
<strong>The Clean Manufacturing Company reported the following information in November:   Indirect manufacturing labor hours = $3,750 + ($15 per machine hour × 925 machine hours). Required: Use the account analysis method and choose the linear cost equation to represent this data.</strong> A)x = a × bX B)y = b × aX C)x = b + aX D)y = a + bX E)z = a - bX
Indirect manufacturing labor hours = $3,750 + ($15 per machine hour × 925 machine hours).
Required:
Use the account analysis method and choose the linear cost equation to represent this data.

A)x = a × bX
B)y = b × aX
C)x = b + aX
D)y = a + bX
E)z = a - bX
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
48
The managerial accountant at the Candle Shoppe uses the high-low method to estimate its cost function.The managerial accountant reported the following information in 2012:
<strong>The managerial accountant at the Candle Shoppe uses the high-low method to estimate its cost function.The managerial accountant reported the following information in 2012:   Required: Compute the slope coefficient per machine-hour.</strong> A)$100 B)$200 C)$300 D)$400 E)$500
Required:
Compute the slope coefficient per machine-hour.

A)$100
B)$200
C)$300
D)$400
E)$500
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
49
The Photography Shoppe uses the high-low method and reported the following information to estimate the cost function.The managerial accountant provided the following information in 2012:
<strong>The Photography Shoppe uses the high-low method and reported the following information to estimate the cost function.The managerial accountant provided the following information in 2012:   Required: Compute the slope coefficient per machine-hour.</strong> A)$10 B)$20 C)$30 D)$40 E)$50
Required:
Compute the slope coefficient per machine-hour.

A)$10
B)$20
C)$30
D)$40
E)$50
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
50
Excel is a useful tool for performing quantitative analysis.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
51
The quantitative analysis method is the most rigorous approach to estimate costs.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
52
In which step of estimating a cost function using quantitative analysis would a manager determine the dependent variable to use in a cost relationship?

A)Step 1: Choose the Dependent Variable.
B)Step 2: Identify the Independent Variable,or Cost Driver.
C)Step 3: Collect Data on the Dependent Variable and the Cost Driver.
D)Step 4: Plot the Data.
E)Step 5: Estimate the Cost Driver of the Estimated Cost Function.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
53
The managerial accountant at Hampson Company reported the following information:
<strong>The managerial accountant at Hampson Company reported the following information:   Required: Use the high-low method to compute the difference of the Cost Driver: Machine Hours,the Difference of the Indirect Manufacturing Labor,and the slope coefficient b for each machine hour.</strong> A)55;$855;$13.68 B)65;$905;$13.92 C)75;$910;$14.85 D)85;$925;$15.65 E)95;$950;$16.22
Required:
Use the high-low method to compute the difference of the Cost Driver: Machine Hours,the Difference of the Indirect Manufacturing Labor,and the slope coefficient b for each machine hour.

A)55;$855;$13.68
B)65;$905;$13.92
C)75;$910;$14.85
D)85;$925;$15.65
E)95;$950;$16.22
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
54
The ________ uses only the highest and lowest observed values of the cost driver within the relevant range and their respective costs to estimate the slope coefficient and the constant of the cost function.

A)cost function
B)relevant range
C)high-low method
D)dependent variable
E)independent variable
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
55
The managerial accountant at Hampson Company reported the following information:
<strong>The managerial accountant at Hampson Company reported the following information:   Use the high-low method to and use the highest observation of the cost driver to compute the constant a,using a slope coefficient of $13.92 per machine hour. A = y - BX At the highest observation of the cost driver,the constant,a,is:</strong> A)$75.60 B)$76.80 C)$75.62 D)$79.60 E)$81.24
Use the high-low method to and use the highest observation of the cost driver to compute the constant a,using a slope coefficient of $13.92 per machine hour.
A = y - BX
At the highest observation of the cost driver,the constant,a,is:

A)$75.60
B)$76.80
C)$75.62
D)$79.60
E)$81.24
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
56
Which of the following is the statistical method used by managers to measure the average amount of change in the dependent variable associated with a unit change in one or more independent variables?

A)Cost function.
B)Relevant range.
C)Account analysis.
D)High-low method.
E)Regression analysis.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
57
Which step of estimating a cost function using quantitative analysis is the most difficult step for a manager to implement in cost analysis?

A)Step 1: Choose the Dependent Variable.
B)Step 2: Identify the Independent Variable,or Cost Driver.
C)Step 3: Collect Data of the Dependent Variable and the Cost Driver.
D)Step 4: Plot the Data.
E)Step 5: Estimate the Cost Driver of the Estimated Cost Function.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
58
In which step of estimating a cost function using quantitative analysis would a manager realize all items of costs in the dependent variable have different cost drivers?

A)Step 1: Choose the Dependent Variable.
B)Step 2: Identify the Independent Variable,or Cost Driver.
C)Step 3: Collect Data of the Dependent Variable and the Cost Driver.
D)Step 4: Plot the Data.
E)Step 5: Estimate the Cost Drive of the Estimated Cost Function.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
59
The pooling of expert knowledge from different business functions of the value chain gives the conference method credibility.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
60
Supplementing the account analysis method with the conference method reduces credibility.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
61
When all items of costs in the dependent variable do not have the same cost driver,the management accountant should consider creating homogeneous cost pools.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
62
Which of the following analyses estimates the relationship between the dependent variable and two or more independent variables?

A)Function.
B)Relevant range.
C)High-low method.
D)Simple regression.
E)Multiple regression.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
63
What is goodness-of-fit?
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
64
The cost function y = 40 + 7X has a slope coefficient of 7.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
65
In the fuel service retail industry,two economically plausible cost drivers are gasoline and convenience store sales.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
66
What is r2,the coefficient of determination?
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
67
The methods that use subjective assessments to choose a cost driver and to estimate the fixed and variable components of the cost function are:

A)conference and quantitative.
B)conference and regressions.
C)conference and simple regression.
D)conference and account analysis.
E)conference and industrial engineering.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
68
What forms of quantitative analysis do managers implement to estimate the cost function?
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
69
Which of the following is the analysis that estimates the relationship between the dependent variable and one independent variable?

A)Cost function.
B)Relevant range.
C)High-low method.
D)Simple regression.
E)Multiple regression.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
70
The independent variable is the factor used to predict the dependent variable.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
71
There is a better fit between actual cost observations and estimated costs when the ________ is small.

A)residual term
B)fixed costs
C)machine hours
D)regression analysis
E)activity-based costing
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
72
Why do managers plot data on graphs?
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
73
A flat,or slightly sloped,regression line indicates:

A)a strong relationship between the cost driver and costs.
B)a weak relationship between the cost driver and costs.
C)an economically plausible relationship exists.
D)management should increase costs.
E)there is no relationship between the cost driver and costs.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
74
What is the ideal time-series database?
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
75
The regression analysis approach illustrates how to evaluate different ________.

A)cost drivers
B)decision trees
C)high-low methods
D)detection systems
E)homogeneous relationships
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
76
Why are a stable economy and technology important to managers?
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
77
The vertical difference that is a measurement of the distance between actual cost and estimate cost for each observation of a cost driver is called the ________.

A)cost function
B)residual term
C)relevant range
D)high-low method
E)simple regression
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
78
The method that relies on analyzing physical relationships between cost drivers and costs is ________.

A)conference
B)quantitative
C)account analysis
D)regression analysis
E)industrial engineering
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
79
What is the difference between time-series data and cross-sectional data?
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
80
The regression equation,y = $744.67 + $7.72X,could represent indirect manufacturing labor costs based on the number of direct manufacturing labor hours.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 97 flashcards in this deck.