Deck 13: Jitlean Production

Full screen (f)
exit full mode
Question
The underlying emphasis of Lean is the elimination of ________.
Use Space or
up arrow
down arrow
to flip the card.
Question
Describe any five of the wastes and their causes identified by the Lean philosophy.
Question
Scrap or rework are examples of the Lean waste recognized as:

A)defects.
B)inappropriate processing.
C)unnecessary motion.
D)waiting.
Question
The receiving department accepts a shipment, confirms it matches the purchase order, and moves it to an area they call "deep storage." As the time approaches for the shipment to be used, they move it from deep storage to the week's holding pen, and on the day of use, it is transferred to the line near where it will fall into the product stream. When the worker needs it, she goes to where it is stored and brings it to her work station. This illustrates the waste of:

A)unnecessary inventory.
B)overproduction.
C)unnecessary transportation.
D)underutilization of employees.
Question
JIT or Lean can be used in:

A)repetitive production.
B)job shop production.
C)many service industries.
D)All of these settings are appropriate for JIT/Lean.
Question
Lean thinking in the production environment has received considerable attention in the last decade, but tools such as kanbans cannot be used in all production environments.
Question
Companies employing the Lean philosophy use only kanban as a production control method.
Question
The just-in-time philosophy applies only to the production floor of a manufacturing company.
Question
The champagne magnums were filled with the amber, effervescent liquid but the corks were nowhere to be found. Unfortunately, the order for a crate of corks was somehow translated into an order for a single cork and corks have a one month lead time. The champagne master was concerned because without corks, there were be far fewer bubbles to tickle the noses of the end users once the product was sold. This illustrates the waste of:

A)waiting.
B)overproduction.
C)unnecessary transportation.
D)underutilization of employees.
Question
The MBA recruiter had worked in one of several different positions at the university; student advisor, adjunct professor, even MBA director at a previous employer. Her sole responsibility as recruiter was attending MBA and job fairs in the area to talk to prospective students about the possibility of continuing their education. This illustrates the waste of:

A)unnecessary inventory.
B)overproduction.
C)unnecessary transportation.
D)underutilization of employees.
Question
Since a Lean manufacturer has very little inventory, it is vital that all incoming parts receive a thorough inspection.
Question
The ability of a process to produce quality output is unknown and the time to ship the output to a customer is highly variable. The combination of these two factors will lead to the waste of waiting.
Question
Any activity that does not add value to the good or service in the eyes of the consumer is ________.
Question
One definition of waste is underutilizing employees.
Question
The delivery lead time was highly variable as was the quality of the product being shipped. These two factors combined to contribute to the waste of:

A)unnecessary transportation.
B)unnecessary inventory.
C)unnecessary motion.
D)waiting.
Question
Which of the following is NOT an element of Lean production?

A)to have only the required inventory when needed
B)to increase waiting time
C)to improve quality
D)to reduce setup times
Question
Inflexible or unreliable processes cause organizations to produce goods before they are required; this is called:

A)excess motion.
B)inappropriate processes.
C)overproduction.
D)defects.
Question
Unnecessary transportation is waste according to the Lean philosophy.
Question
The term just-in-time production is used synonymously with the term Lean production.
Question
Just-in-time production is also referred to as ________.
Question
A company has successfully implemented Lean practices in their three station process. The stations are, in order, Station A, Station B, and Station C and product moves from A to B to C smoothly. One day, the equipment at Station B experiences catastrophic failure. What happens and what is the appropriate response for a Lean-thinking company?

A)Continue producing at Station C and restore capacity at Station B.
B)Continue producing at Station A and restore capacity at Station B.
C)Continue producing at Station A and C and restore capacity at Station B.
D)Everything stops and attention is focused on restoring capacity at Station B.
Question
Lean's focus on inventory reduction prioritizes raw materials as most important to reduce, followed by work in process and finally finished goods.
Question
In the water and rocks analogy for Lean:

A)water represents problems.
B)water represents inventory.
C)rocks represent inventory.
D)water wears away rocks gradually just like continuous improvement programs improve quality.
Question
A typical application of Lean would call for a gradual reduction in system inventory until a problem surfaces. Once this problem is fixed, the cycle begins again, i.e., inventory is reduced until another problem is surfaced and fixed.
Question
What is the difference between Lean and kanban?
Question
________ could result in workers from one company working to eliminate waste for a company from which they purchase components.
Question
One recent development in Lean thinking is the combination of Lean and Six Sigma into Lean Six Sigma, which combines the rigor of statistical analysis and DMAIC approach with Lean's focus on waste reduction.
Question
In a lean system when a process is running smoothly:

A)workers are underutilized.
B)there is too little inventory in the system.
C)there is too much inventory in the system.
D)workers are overutilized.
Question
Provide a definition by description of the Lean philosophy. Where can Lean be deployed?
Question
A reduction in inventory levels forces a company to address poor manufacturing practices.
Question
In a two-card kanban system:

A)the production card signals when a move card should be moved to the next process step.
B)the move card signals when a container of parts should be produced.
C)the production card signals when a container that held parts should be returned to inventory.
D)the move card signals when a container of parts should move to the next process step.
Question
A kanban can be:

A)a container.
B)a card.
C)a visual cue.
D)All of these can be kanbans.
Question
Once a system has been "leaned out" with all excess inventory removed, if a piece of production equipment breaks, all activity on the production line ________.
Question
Lean Six Sigma combines the organizational elements and tools of Lean with the broad focus on waste reduction of Six Sigma.
Question
Lean supply chain management also seeks to optimize flows of information and money in addition to physical flows.
Question
The analogy of rocks in a river is often used when discussing Lean principles. In the analogy, the rocks represent ________ while the water represents ________.
Question
Lean supply chain management focuses on eliminating waste:

A)in a firm's sourcing and logistics activities.
B)within a firm's internal operations.
C)in flows of information and money among supply chain partners.
D)in all of the above areas.
Question
________ combines the focus on waste reduction with the discipline of define, measure, analyze, improve, and control.
Question
What is the Lean perspective on inventory?
Question
Recent developments in Lean thinking have combined these principles with Six Sigma and with supply chain management. Pick either one of these programs and describe its elements. Then provide an example from current business news of an operation or supply chain that has embraced these principles.
Question
When using MRP and kanban together:

A)the control capabilities of MRP are used instead of those from kanban.
B)the planning capabilities of kanban are used instead of those from MRP.
C)the demand rate should be variable in order to derive the greatest benefit from the MRP portion of the system.
D)this information is used to recalculate the number of production kanbans needed.
Question
Livernonions Industries uses a kanban system to manage production of the BR-549 subassembly. In an eight-hour day, they use 900 units and use containers that can hold 30 units each. It takes 120 minutes to fill and move a container of parts to the right place on the BR-549 line that is currently rated at a 15% safety factor. How many production hours of inventory are needed?

A)18.4
B)7.6
C)4.3
D)2.4
Question
A pull system is a production system in which actual downstream demand sets off a chain of events that pull material through various steps in the various process steps.
Question
Which of the following statements regarding supply chain synchronization using kanbans is BEST?

A)An interruption in the flow of goods within a supplier's assembly operations will have no effect on final assembly downstream in the supply chain.
B)For the system to work properly, demand rates must be relatively stable and interruptions must be minimized.
C)If final assembly demand doubles, there is no need to change kanbans at each of the suppliers.
D)Final assembly demand may rise or fall, but the sum of the kanbans among all suppliers in the supply chain will remain constant.
Question
In a single-card kanban system:

A)the single card is the production card.
B)the empty container serves as the production card.
C)the single card is the move signal.
D)None of the above is correct in a single-card system.
Question
The cards employed in a two-card kanban system are the production card and the move card.
Question
Olivia has had enough of the theoretical equations and rejects the higher math needed to calculate the number of kanbans for her system. One approach that some organizations take in lieu of the kanban equation is to:

A)start with one kanban and operate as fast as they can with the one, before adding more kanbans to bring them up to speed.
B)start with too many kanbans and gradually remove them until a problem arises.
C)fully load their system with inventory and produce until they cannot build product.
D)eliminate all inventory from the system and add material and parts until they can fill a customer order.
Question
Two announcers are used to read names at the semiannual commencement exercises held at a regional university in America's heartland. All students have their names read then walk briskly to the president who shakes their hand and offers them an empty diploma cover until such time that all financial obligations to the university have been met. The president greets about 900 students in an eight-hour day. The diploma covers come in boxes of 12 and it takes one hour to carry one from the receiving dock to the field house where the ceremony is held. The president likes to keep things moving, so he has requested a 50% safety factor. How many containers are needed?

A)14
B)13
C)12
D)1
Question
Liversuch Industries uses a kanban system to manage production of the J-15 subassembly. They have an hourly demand for 250 units and use containers that can hold 50 units each. It takes 90 minutes to fill and move a container of parts to the right place on the J-15 line that is currently rated at a 20% safety factor. How many production cards are needed?

A)540
B)100
C)9
D)1.5
Question
Consider the adjacent work stations in this two card kanban system. There is a production card located in the box labeled Outgoing Parts B. Work Center 3 pulls the parts from Work Center 2. Where does the production card go? <strong>Consider the adjacent work stations in this two card kanban system. There is a production card located in the box labeled Outgoing Parts B. Work Center 3 pulls the parts from Work Center 2. Where does the production card go?  </strong> A)The production card remains in the same box. B)The production card is placed at Work Center 3. C)The production card is placed at Work Center 2. D)The production card is placed in the box labeled Incoming Parts A. <div style=padding-top: 35px>

A)The production card remains in the same box.
B)The production card is placed at Work Center 3.
C)The production card is placed at Work Center 2.
D)The production card is placed in the box labeled Incoming Parts A.
Question
Livermore Industries uses a kanban system to manage production of the KR-9 subassembly. In a ten-hour day, they use 1500 units and use containers that can hold 50 units each. It takes 45 minutes to fill and move a container of parts to the right place on the KR-9 line that is currently rated at a 15% safety factor. How many production cards are needed?

A)3
B)26
C)82
D)155
Question
In a two-card kanban system:

A)each box of finished goods has a move card so it can be sent to the next step.
B)each box of raw material has a production card so it can be made into finished goods.
C)a downstream station pulls finished material out of a production area.
D)demand for more raw materials pushes finished goods to the finished goods area.
Question
A two-card kanban system is a planning tool that links production and movement of units at only two work centers.
Question
Two announcers are used to read names at the semiannual commencement exercises held at a regional university in America's heartland. All students have their names read then walk briskly to the president who shakes their hand and offers them an empty diploma cover until such time that all financial obligations to the university have been met. The president greets about 640 students in an eight-hour day. The diploma covers come in boxes of 24 and it takes one hour to carry one from the receiving dock to the field house where the ceremony is held. The president likes to keep things moving, so he has requested a 50% safety factor. How many containers are needed?

A)two
B)three
C)four
D)five
Question
Consider the adjacent work stations in this two card kanban system. Work Center 3 has just pulled the Incoming Parts C box to their work station. Which of these statements is best? <strong>Consider the adjacent work stations in this two card kanban system. Work Center 3 has just pulled the Incoming Parts C box to their work station. Which of these statements is best?  </strong> A)The move card will move backward from Work Center 3 to Work Center 2. B)The production card will move backward from Work Center 3 to Work Center 2. C)The move card will move forward from Work Center 3 to Work Center 4. D)Despite its name, the move card doesn't actually move from one station to the next, it will simply reside at Work Center 3 until the next box is finished. <div style=padding-top: 35px>

A)The move card will move backward from Work Center 3 to Work Center 2.
B)The production card will move backward from Work Center 3 to Work Center 2.
C)The move card will move forward from Work Center 3 to Work Center 4.
D)Despite its name, the move card doesn't actually move from one station to the next, it will simply reside at Work Center 3 until the next box is finished.
Question
Consider the adjacent work stations in this two card kanban system. Work Center 3 has just pulled the Incoming Parts C box to their work station. Plant manager Taichi Ohno grabs the microphone for the company PA system and announces that effective immediately, the company will switch to a one card system. Which of these actions is appropriate? <strong>Consider the adjacent work stations in this two card kanban system. Work Center 3 has just pulled the Incoming Parts C box to their work station. Plant manager Taichi Ohno grabs the microphone for the company PA system and announces that effective immediately, the company will switch to a one card system. Which of these actions is appropriate?  </strong> A)The production card will be discarded and the empty container will function as a production signal. B)The production card will be discarded and the empty container will function as a move signal. C)Both the move and production cards will be discarded in favor of a combined move/production card. D)The production card will be discarded as production will be implied and the move cards will signal when items are needed downstream. <div style=padding-top: 35px>

A)The production card will be discarded and the empty container will function as a production signal.
B)The production card will be discarded and the empty container will function as a move signal.
C)Both the move and production cards will be discarded in favor of a combined move/production card.
D)The production card will be discarded as production will be implied and the move cards will signal when items are needed downstream.
Question
Consider the adjacent work stations in this two card kanban system. There is a production card located: <strong>Consider the adjacent work stations in this two card kanban system. There is a production card located:  </strong> A)in box A. B)in box B. C)at work center 1 and work center 2. D)in box C. <div style=padding-top: 35px>

A)in box A.
B)in box B.
C)at work center 1 and work center 2.
D)in box C.
Question
The forecast for next month is 200 units so the manufacturer gathers materials for this anticipated level of production activity. This is an example of a pull system.
Question
Consider the adjacent work stations in this two card kanban system. Work Center 3 has just pulled the Incoming Parts C box to their work station. What happens to the cards in the Incoming Parts C box and at the work station? <strong>Consider the adjacent work stations in this two card kanban system. Work Center 3 has just pulled the Incoming Parts C box to their work station. What happens to the cards in the Incoming Parts C box and at the work station?  </strong> A)The move card at their station goes in the Incoming Parts C box and the production card is pulled from the Incoming Parts C box to signal the worker at Work Center 2 that there is a need to produce material. B)The production card at the station is passed back to Work Center 2 as a signal to produce more material and the move card is left at Work Center 3 to signal that they are ready to accept materials when they are complete at Work Center 2. C)The move card at their station goes in the box they will send downstream to Work Center 4 and the production card is placed at the Work Center 3 station while they are working on this batch of material. D)The production card at their station goes in the Incoming Parts C box and the move card is pulled from the Incoming Parts C box to signal the worker at Work Center 2 that there is a need to move material. <div style=padding-top: 35px>

A)The move card at their station goes in the Incoming Parts C box and the production card is pulled from the Incoming Parts C box to signal the worker at Work Center 2 that there is a need to produce material.
B)The production card at the station is passed back to Work Center 2 as a signal to produce more material and the move card is left at Work Center 3 to signal that they are ready to accept materials when they are complete at Work Center 2.
C)The move card at their station goes in the box they will send downstream to Work Center 4 and the production card is placed at the Work Center 3 station while they are working on this batch of material.
D)The production card at their station goes in the Incoming Parts C box and the move card is pulled from the Incoming Parts C box to signal the worker at Work Center 2 that there is a need to move material.
Question
Consider the adjacent work stations in this two card kanban system. There is a move card located: <strong>Consider the adjacent work stations in this two card kanban system. There is a move card located:  </strong> A)in box A. B)in box B. C)both in box A and box C. D)in box C. <div style=padding-top: 35px>

A)in box A.
B)in box B.
C)both in box A and box C.
D)in box C.
Question
Describe the movements of parts and kanbans in a two-card kanban system.
Question
Two modules are used to feed the final assembly station on an assembly line. The final assembly station must produce 250 units in an eight-hour day. Each finished unit needs two module A's and 3 module B's. The factory uses a standard sized container that can hold 25 module A's or 35 module B's. It takes 2 hours to fill and move a container of module A's, but only 90 minutes to fill and move a container of module B's. If both module assembly processes have safety factors of 15%, how many containers should be used for each? How many hours of demand will this satisfy?
Question
A manufacturer waits to produce until they have an order from a customer. This type of production system is called ________.
Question
A(n)________ is a production control approach that uses containers, cards, or visual cues to control production and movement of goods throughout the supply chain.
Question
The greater the demand, the more kanbans are needed.
Question
Some companies have found it beneficial to combine the planning capabilities of kanban with the control capabilities of MRP.
Question
What are the consequences of unstable demand and interrupted flows on a supply chain managed with a Lean philosophy?
Question
The number of kanbans in a production system is inversely related to the ________.
Question
For a kanban system to work properly, demand rates must be relatively stable, and interruptions must be minimized or quickly resolved.
Question
Companies that use MRP and kanban together use the ________ of MRP and the ________ of kanban.
Question
In the kanban formula, the letter T represents the time it takes to empty a box of parts through building product.
Question
An increase in the safety factor results in an increase in the amount of inventory in a kanban system.
Question
Use this material requirements planning record to explain how kanbans and MRP can be used together. This plant operates on a 40-hour week, and uses a 10% safety factor on a container size of 20 units with a half-day turnaround time on a container. What features of each system should be used and for what purposes?
Use this material requirements planning record to explain how kanbans and MRP can be used together. This plant operates on a 40-hour week, and uses a 10% safety factor on a container size of 20 units with a half-day turnaround time on a container. What features of each system should be used and for what purposes?  <div style=padding-top: 35px>
Question
Two announcers are used to read names at the semiannual commencement exercises held at a regional university in America's heartland. All students have their names read then walk briskly to the president who shakes their hand and offers them an empty diploma cover until such time that all financial obligations to the university have been met. The president greets about 600 students in an eight-hour day. The diploma covers come in boxes of 24 and it takes 45 minutes to carry one from the receiving dock to the field house where the ceremony is held. The president likes to keep things moving, so he has requested a 50% safety factor. How many containers are needed?
Question
Under two-card kanban system rules, each box of raw material must have a(n)________, while each box of finished goods must have a(n)________.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/75
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 13: Jitlean Production
1
The underlying emphasis of Lean is the elimination of ________.
waste
2
Describe any five of the wastes and their causes identified by the Lean philosophy.
According to the Lean perspective, waste, or muda, is any activity that does not add value to the good or service in the eyes of the consumer. There are eight commonly recognized ones, so answers will vary depending on which five are selected.
overproduction - caused by inflexible or unreliable processes that cause organizations to produce goods before they are required.
waiting - caused by inefficient layouts or an inability to match demand with output levels.
unnecessary transportation - caused by processes being unnecessarily separated.
inappropriate process - caused by a love of complexity, i.e., using overly complex processes when simpler, more efficient ones would do.
unnecessary inventory - caused by uncertainty with regard to quality levels, delivery lead times, etc.
unnecessary/excess motion - caused by poorly designed processes.
defects - caused by poor training, supplies, equipment malfunctions, among many possible causes that create uncertainty in the process and robbing production capacity by creating products or services that require rework or must be scrapped.
underutilization of employees - caused by not utilizing the skills and decision-making capabilities of their employees.
3
Scrap or rework are examples of the Lean waste recognized as:

A)defects.
B)inappropriate processing.
C)unnecessary motion.
D)waiting.
defects.
4
The receiving department accepts a shipment, confirms it matches the purchase order, and moves it to an area they call "deep storage." As the time approaches for the shipment to be used, they move it from deep storage to the week's holding pen, and on the day of use, it is transferred to the line near where it will fall into the product stream. When the worker needs it, she goes to where it is stored and brings it to her work station. This illustrates the waste of:

A)unnecessary inventory.
B)overproduction.
C)unnecessary transportation.
D)underutilization of employees.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
5
JIT or Lean can be used in:

A)repetitive production.
B)job shop production.
C)many service industries.
D)All of these settings are appropriate for JIT/Lean.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
6
Lean thinking in the production environment has received considerable attention in the last decade, but tools such as kanbans cannot be used in all production environments.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
7
Companies employing the Lean philosophy use only kanban as a production control method.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
8
The just-in-time philosophy applies only to the production floor of a manufacturing company.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
9
The champagne magnums were filled with the amber, effervescent liquid but the corks were nowhere to be found. Unfortunately, the order for a crate of corks was somehow translated into an order for a single cork and corks have a one month lead time. The champagne master was concerned because without corks, there were be far fewer bubbles to tickle the noses of the end users once the product was sold. This illustrates the waste of:

A)waiting.
B)overproduction.
C)unnecessary transportation.
D)underutilization of employees.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
10
The MBA recruiter had worked in one of several different positions at the university; student advisor, adjunct professor, even MBA director at a previous employer. Her sole responsibility as recruiter was attending MBA and job fairs in the area to talk to prospective students about the possibility of continuing their education. This illustrates the waste of:

A)unnecessary inventory.
B)overproduction.
C)unnecessary transportation.
D)underutilization of employees.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
11
Since a Lean manufacturer has very little inventory, it is vital that all incoming parts receive a thorough inspection.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
12
The ability of a process to produce quality output is unknown and the time to ship the output to a customer is highly variable. The combination of these two factors will lead to the waste of waiting.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
13
Any activity that does not add value to the good or service in the eyes of the consumer is ________.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
14
One definition of waste is underutilizing employees.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
15
The delivery lead time was highly variable as was the quality of the product being shipped. These two factors combined to contribute to the waste of:

A)unnecessary transportation.
B)unnecessary inventory.
C)unnecessary motion.
D)waiting.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
16
Which of the following is NOT an element of Lean production?

A)to have only the required inventory when needed
B)to increase waiting time
C)to improve quality
D)to reduce setup times
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
17
Inflexible or unreliable processes cause organizations to produce goods before they are required; this is called:

A)excess motion.
B)inappropriate processes.
C)overproduction.
D)defects.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
18
Unnecessary transportation is waste according to the Lean philosophy.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
19
The term just-in-time production is used synonymously with the term Lean production.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
20
Just-in-time production is also referred to as ________.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
21
A company has successfully implemented Lean practices in their three station process. The stations are, in order, Station A, Station B, and Station C and product moves from A to B to C smoothly. One day, the equipment at Station B experiences catastrophic failure. What happens and what is the appropriate response for a Lean-thinking company?

A)Continue producing at Station C and restore capacity at Station B.
B)Continue producing at Station A and restore capacity at Station B.
C)Continue producing at Station A and C and restore capacity at Station B.
D)Everything stops and attention is focused on restoring capacity at Station B.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
22
Lean's focus on inventory reduction prioritizes raw materials as most important to reduce, followed by work in process and finally finished goods.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
23
In the water and rocks analogy for Lean:

A)water represents problems.
B)water represents inventory.
C)rocks represent inventory.
D)water wears away rocks gradually just like continuous improvement programs improve quality.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
24
A typical application of Lean would call for a gradual reduction in system inventory until a problem surfaces. Once this problem is fixed, the cycle begins again, i.e., inventory is reduced until another problem is surfaced and fixed.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
25
What is the difference between Lean and kanban?
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
26
________ could result in workers from one company working to eliminate waste for a company from which they purchase components.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
27
One recent development in Lean thinking is the combination of Lean and Six Sigma into Lean Six Sigma, which combines the rigor of statistical analysis and DMAIC approach with Lean's focus on waste reduction.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
28
In a lean system when a process is running smoothly:

A)workers are underutilized.
B)there is too little inventory in the system.
C)there is too much inventory in the system.
D)workers are overutilized.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
29
Provide a definition by description of the Lean philosophy. Where can Lean be deployed?
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
30
A reduction in inventory levels forces a company to address poor manufacturing practices.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
31
In a two-card kanban system:

A)the production card signals when a move card should be moved to the next process step.
B)the move card signals when a container of parts should be produced.
C)the production card signals when a container that held parts should be returned to inventory.
D)the move card signals when a container of parts should move to the next process step.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
32
A kanban can be:

A)a container.
B)a card.
C)a visual cue.
D)All of these can be kanbans.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
33
Once a system has been "leaned out" with all excess inventory removed, if a piece of production equipment breaks, all activity on the production line ________.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
34
Lean Six Sigma combines the organizational elements and tools of Lean with the broad focus on waste reduction of Six Sigma.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
35
Lean supply chain management also seeks to optimize flows of information and money in addition to physical flows.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
36
The analogy of rocks in a river is often used when discussing Lean principles. In the analogy, the rocks represent ________ while the water represents ________.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
37
Lean supply chain management focuses on eliminating waste:

A)in a firm's sourcing and logistics activities.
B)within a firm's internal operations.
C)in flows of information and money among supply chain partners.
D)in all of the above areas.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
38
________ combines the focus on waste reduction with the discipline of define, measure, analyze, improve, and control.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
39
What is the Lean perspective on inventory?
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
40
Recent developments in Lean thinking have combined these principles with Six Sigma and with supply chain management. Pick either one of these programs and describe its elements. Then provide an example from current business news of an operation or supply chain that has embraced these principles.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
41
When using MRP and kanban together:

A)the control capabilities of MRP are used instead of those from kanban.
B)the planning capabilities of kanban are used instead of those from MRP.
C)the demand rate should be variable in order to derive the greatest benefit from the MRP portion of the system.
D)this information is used to recalculate the number of production kanbans needed.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
42
Livernonions Industries uses a kanban system to manage production of the BR-549 subassembly. In an eight-hour day, they use 900 units and use containers that can hold 30 units each. It takes 120 minutes to fill and move a container of parts to the right place on the BR-549 line that is currently rated at a 15% safety factor. How many production hours of inventory are needed?

A)18.4
B)7.6
C)4.3
D)2.4
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
43
A pull system is a production system in which actual downstream demand sets off a chain of events that pull material through various steps in the various process steps.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
44
Which of the following statements regarding supply chain synchronization using kanbans is BEST?

A)An interruption in the flow of goods within a supplier's assembly operations will have no effect on final assembly downstream in the supply chain.
B)For the system to work properly, demand rates must be relatively stable and interruptions must be minimized.
C)If final assembly demand doubles, there is no need to change kanbans at each of the suppliers.
D)Final assembly demand may rise or fall, but the sum of the kanbans among all suppliers in the supply chain will remain constant.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
45
In a single-card kanban system:

A)the single card is the production card.
B)the empty container serves as the production card.
C)the single card is the move signal.
D)None of the above is correct in a single-card system.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
46
The cards employed in a two-card kanban system are the production card and the move card.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
47
Olivia has had enough of the theoretical equations and rejects the higher math needed to calculate the number of kanbans for her system. One approach that some organizations take in lieu of the kanban equation is to:

A)start with one kanban and operate as fast as they can with the one, before adding more kanbans to bring them up to speed.
B)start with too many kanbans and gradually remove them until a problem arises.
C)fully load their system with inventory and produce until they cannot build product.
D)eliminate all inventory from the system and add material and parts until they can fill a customer order.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
48
Two announcers are used to read names at the semiannual commencement exercises held at a regional university in America's heartland. All students have their names read then walk briskly to the president who shakes their hand and offers them an empty diploma cover until such time that all financial obligations to the university have been met. The president greets about 900 students in an eight-hour day. The diploma covers come in boxes of 12 and it takes one hour to carry one from the receiving dock to the field house where the ceremony is held. The president likes to keep things moving, so he has requested a 50% safety factor. How many containers are needed?

A)14
B)13
C)12
D)1
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
49
Liversuch Industries uses a kanban system to manage production of the J-15 subassembly. They have an hourly demand for 250 units and use containers that can hold 50 units each. It takes 90 minutes to fill and move a container of parts to the right place on the J-15 line that is currently rated at a 20% safety factor. How many production cards are needed?

A)540
B)100
C)9
D)1.5
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
50
Consider the adjacent work stations in this two card kanban system. There is a production card located in the box labeled Outgoing Parts B. Work Center 3 pulls the parts from Work Center 2. Where does the production card go? <strong>Consider the adjacent work stations in this two card kanban system. There is a production card located in the box labeled Outgoing Parts B. Work Center 3 pulls the parts from Work Center 2. Where does the production card go?  </strong> A)The production card remains in the same box. B)The production card is placed at Work Center 3. C)The production card is placed at Work Center 2. D)The production card is placed in the box labeled Incoming Parts A.

A)The production card remains in the same box.
B)The production card is placed at Work Center 3.
C)The production card is placed at Work Center 2.
D)The production card is placed in the box labeled Incoming Parts A.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
51
Livermore Industries uses a kanban system to manage production of the KR-9 subassembly. In a ten-hour day, they use 1500 units and use containers that can hold 50 units each. It takes 45 minutes to fill and move a container of parts to the right place on the KR-9 line that is currently rated at a 15% safety factor. How many production cards are needed?

A)3
B)26
C)82
D)155
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
52
In a two-card kanban system:

A)each box of finished goods has a move card so it can be sent to the next step.
B)each box of raw material has a production card so it can be made into finished goods.
C)a downstream station pulls finished material out of a production area.
D)demand for more raw materials pushes finished goods to the finished goods area.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
53
A two-card kanban system is a planning tool that links production and movement of units at only two work centers.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
54
Two announcers are used to read names at the semiannual commencement exercises held at a regional university in America's heartland. All students have their names read then walk briskly to the president who shakes their hand and offers them an empty diploma cover until such time that all financial obligations to the university have been met. The president greets about 640 students in an eight-hour day. The diploma covers come in boxes of 24 and it takes one hour to carry one from the receiving dock to the field house where the ceremony is held. The president likes to keep things moving, so he has requested a 50% safety factor. How many containers are needed?

A)two
B)three
C)four
D)five
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
55
Consider the adjacent work stations in this two card kanban system. Work Center 3 has just pulled the Incoming Parts C box to their work station. Which of these statements is best? <strong>Consider the adjacent work stations in this two card kanban system. Work Center 3 has just pulled the Incoming Parts C box to their work station. Which of these statements is best?  </strong> A)The move card will move backward from Work Center 3 to Work Center 2. B)The production card will move backward from Work Center 3 to Work Center 2. C)The move card will move forward from Work Center 3 to Work Center 4. D)Despite its name, the move card doesn't actually move from one station to the next, it will simply reside at Work Center 3 until the next box is finished.

A)The move card will move backward from Work Center 3 to Work Center 2.
B)The production card will move backward from Work Center 3 to Work Center 2.
C)The move card will move forward from Work Center 3 to Work Center 4.
D)Despite its name, the move card doesn't actually move from one station to the next, it will simply reside at Work Center 3 until the next box is finished.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
56
Consider the adjacent work stations in this two card kanban system. Work Center 3 has just pulled the Incoming Parts C box to their work station. Plant manager Taichi Ohno grabs the microphone for the company PA system and announces that effective immediately, the company will switch to a one card system. Which of these actions is appropriate? <strong>Consider the adjacent work stations in this two card kanban system. Work Center 3 has just pulled the Incoming Parts C box to their work station. Plant manager Taichi Ohno grabs the microphone for the company PA system and announces that effective immediately, the company will switch to a one card system. Which of these actions is appropriate?  </strong> A)The production card will be discarded and the empty container will function as a production signal. B)The production card will be discarded and the empty container will function as a move signal. C)Both the move and production cards will be discarded in favor of a combined move/production card. D)The production card will be discarded as production will be implied and the move cards will signal when items are needed downstream.

A)The production card will be discarded and the empty container will function as a production signal.
B)The production card will be discarded and the empty container will function as a move signal.
C)Both the move and production cards will be discarded in favor of a combined move/production card.
D)The production card will be discarded as production will be implied and the move cards will signal when items are needed downstream.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
57
Consider the adjacent work stations in this two card kanban system. There is a production card located: <strong>Consider the adjacent work stations in this two card kanban system. There is a production card located:  </strong> A)in box A. B)in box B. C)at work center 1 and work center 2. D)in box C.

A)in box A.
B)in box B.
C)at work center 1 and work center 2.
D)in box C.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
58
The forecast for next month is 200 units so the manufacturer gathers materials for this anticipated level of production activity. This is an example of a pull system.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
59
Consider the adjacent work stations in this two card kanban system. Work Center 3 has just pulled the Incoming Parts C box to their work station. What happens to the cards in the Incoming Parts C box and at the work station? <strong>Consider the adjacent work stations in this two card kanban system. Work Center 3 has just pulled the Incoming Parts C box to their work station. What happens to the cards in the Incoming Parts C box and at the work station?  </strong> A)The move card at their station goes in the Incoming Parts C box and the production card is pulled from the Incoming Parts C box to signal the worker at Work Center 2 that there is a need to produce material. B)The production card at the station is passed back to Work Center 2 as a signal to produce more material and the move card is left at Work Center 3 to signal that they are ready to accept materials when they are complete at Work Center 2. C)The move card at their station goes in the box they will send downstream to Work Center 4 and the production card is placed at the Work Center 3 station while they are working on this batch of material. D)The production card at their station goes in the Incoming Parts C box and the move card is pulled from the Incoming Parts C box to signal the worker at Work Center 2 that there is a need to move material.

A)The move card at their station goes in the Incoming Parts C box and the production card is pulled from the Incoming Parts C box to signal the worker at Work Center 2 that there is a need to produce material.
B)The production card at the station is passed back to Work Center 2 as a signal to produce more material and the move card is left at Work Center 3 to signal that they are ready to accept materials when they are complete at Work Center 2.
C)The move card at their station goes in the box they will send downstream to Work Center 4 and the production card is placed at the Work Center 3 station while they are working on this batch of material.
D)The production card at their station goes in the Incoming Parts C box and the move card is pulled from the Incoming Parts C box to signal the worker at Work Center 2 that there is a need to move material.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
60
Consider the adjacent work stations in this two card kanban system. There is a move card located: <strong>Consider the adjacent work stations in this two card kanban system. There is a move card located:  </strong> A)in box A. B)in box B. C)both in box A and box C. D)in box C.

A)in box A.
B)in box B.
C)both in box A and box C.
D)in box C.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
61
Describe the movements of parts and kanbans in a two-card kanban system.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
62
Two modules are used to feed the final assembly station on an assembly line. The final assembly station must produce 250 units in an eight-hour day. Each finished unit needs two module A's and 3 module B's. The factory uses a standard sized container that can hold 25 module A's or 35 module B's. It takes 2 hours to fill and move a container of module A's, but only 90 minutes to fill and move a container of module B's. If both module assembly processes have safety factors of 15%, how many containers should be used for each? How many hours of demand will this satisfy?
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
63
A manufacturer waits to produce until they have an order from a customer. This type of production system is called ________.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
64
A(n)________ is a production control approach that uses containers, cards, or visual cues to control production and movement of goods throughout the supply chain.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
65
The greater the demand, the more kanbans are needed.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
66
Some companies have found it beneficial to combine the planning capabilities of kanban with the control capabilities of MRP.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
67
What are the consequences of unstable demand and interrupted flows on a supply chain managed with a Lean philosophy?
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
68
The number of kanbans in a production system is inversely related to the ________.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
69
For a kanban system to work properly, demand rates must be relatively stable, and interruptions must be minimized or quickly resolved.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
70
Companies that use MRP and kanban together use the ________ of MRP and the ________ of kanban.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
71
In the kanban formula, the letter T represents the time it takes to empty a box of parts through building product.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
72
An increase in the safety factor results in an increase in the amount of inventory in a kanban system.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
73
Use this material requirements planning record to explain how kanbans and MRP can be used together. This plant operates on a 40-hour week, and uses a 10% safety factor on a container size of 20 units with a half-day turnaround time on a container. What features of each system should be used and for what purposes?
Use this material requirements planning record to explain how kanbans and MRP can be used together. This plant operates on a 40-hour week, and uses a 10% safety factor on a container size of 20 units with a half-day turnaround time on a container. What features of each system should be used and for what purposes?
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
74
Two announcers are used to read names at the semiannual commencement exercises held at a regional university in America's heartland. All students have their names read then walk briskly to the president who shakes their hand and offers them an empty diploma cover until such time that all financial obligations to the university have been met. The president greets about 600 students in an eight-hour day. The diploma covers come in boxes of 24 and it takes 45 minutes to carry one from the receiving dock to the field house where the ceremony is held. The president likes to keep things moving, so he has requested a 50% safety factor. How many containers are needed?
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
75
Under two-card kanban system rules, each box of raw material must have a(n)________, while each box of finished goods must have a(n)________.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 75 flashcards in this deck.