Deck 17: Lean Operating Systems

Full screen (f)
exit full mode
Question
_____ is NOT a 5S principle that creates a well-organized work environment.

A) Stabilize
B) Standardize
C) Shine
D) Sustain
Use Space or
up arrow
down arrow
to flip the card.
Question
Which of the following Ss of the 5Ss means to keep the process going through training, communication, and organizational structures?

A) Shine
B) Sort
C) Sustain
D) Standardize
Question
Which of the following Ss in the 5S system ensures that each item in a workplace is in its proper place or identified as unnecessary and removed?

A) Sort
B) Set in order
C) Shine
D) Standardize
Question
Principles of lean operating systems include all of the following EXCEPT _____.

A) eliminating waste
B) improving information technology
C) increasing speed and response
D) reducing costs
Question
Which of the following statements is TRUE of total productive maintenance (TPM)?

A) It puts total responsibility on maintenance workers.
B) It puts total responsibility on equipment operators.
C) Planned down time is maximized.
D) Employees preserve and protect their equipment.
Question
According to the Toyota Motor Company, which of the following is NOT one of the seven major waste categories?

A) Overproduction
B) Transportation
C) Motion
D) Single-piece flow
Question
In the 5Ss, a clean work area refers to _____.

A) sort
B) synchronize
C) shine
D) standardize
Question
According to the seven major categories of waste classified by Toyota Motor Company, long lead times and higher work-in-process are the results of _____.

A) overproduction
B) inventory
C) waiting time
D) transportation
Question
Which of the following is NOT a basic principle of a lean operating system?

A) Elimination of waste
B) Batching
C) Increased speed and response
D) Improved quality
Question
Timken Company illustrates the application of lean principles when it _____.

A) reduces the total cycle time for new product development
B) increases safety stock in its inventory system
C) expands factories and distribution centers
D) maximizes the number of parts or items in its systems
Question
Which of the following is NOT one of the 5Ss?

A) Set in order
B) Sort
C) Standardize
D) Single-piece flow
Question
Total productive maintenance (TPM) seeks to do all of the following EXCEPT _____.

A) maximizing equipment effectiveness
B) creating worker ownership of equipment by involving them in maintenance activities
C) fostering continuous improvement efforts
D) enabling multiple products in small batches to be run on the same equipment
Question
The process of producing large quantities of items as a group before they are transferred to the next operation is known as _____.

A) batching
B) outsourcing
C) reshoring
D) offshoring
Question
Which one of the following statements is TRUE of Lean Six Sigma?

A) Lean principles focus on advanced statistical methods.
B) It is difficult to use lean methods in nonmanufacturing environments.
C) It uses basic root cause, process, and data analysis techniques.
D) Six Sigma and lean principles are separate bodies of knowledge.
Question
Which of the following principles is NOT part of the 5Ss?

A) Synchronize
B) Set in order
C) Shine
D) Sustain
Question
Toyota classified waste into seven major categories. These categories include all of the following EXCEPT _____.

A) motion
B) ordering
C) inventory
D) waiting time
Question
Which one of the following is an example of waste in organizations?

A) High capacity resource utilization
B) Retraining and relearning time and expense
C) Correct factory routing of customer orders and jobs
D) High data integrity
Question
Southwest Airlines illustrates the application of lean principles when it _____.

A) reduces airplane turnaround time at airport gates
B) assigns airplane seats
C) serves all passengers in-flight dinners
D) charges a change of ticket fee for missing a scheduled flight
Question
Quality at the source requires _____.

A) starting with a plan
B) having reliable suppliers
C) doing it right the first time
D) having a good design
Question
A quick setup or changeover of tooling and fixtures is associated with _____.

A) visual controls
B) single minute exchange of dies
C) single-piece flow
D) six sigma
Question
The maximum authorized inventory for this part is _____.

A) less than 25 parts
B) more than 25 but less than or equal to 50 parts
C) more than 50 but less than or equal to 100 parts
D) more than 100 but less than or equal to 150 parts
Question
Which of the following is NOT a best practice and prerequisite for implementing a just-in-time system?

A) Maximizing the number of parts or items
B) Good calibration of all gauges and testing equipment
C) Clean and uncluttered workplaces
D) Minimizing setup/changeover time
Question
A withdraw Kanban authorizes _____.

A) the production of parts
B) suppliers to produce
C) the transfer of an empty container
D) shipping to customers
Question
If the safety stock factor is changed to 0.1 and the number of parts per container is increased to 44, how many containers will be needed?

A) 1 container
B) 2 containers
C) 3 containers
D) 4 containers
Question
Which of the following is LEAST related to a push system?

A) Maximum responsiveness
B) Predefined schedule
C) Finished goods inventory
D) Forecast dependent
Question
The maximum authorized inventory for the problem given in #35 is _____.

A) less than or equal to 200 units
B) more than 200 but less than or equal to 300 units
C) more than 300 but less than or equal to 400 units
D) more than 400 units
Question
Which of the following ideas related to lean operating systems is FALSE?

A) The ideal order quantity for single piece flow is one.
B) Accidents are a form of waste in organizations.
C) A push system makes only what you can sell.
D) Overproduction is a form of waste in organizations.
Question
A(n) _____ produces finished-goods inventory in advance of customer demand using a forecast of sales.

A) single minute exchange of dies (SMED)
B) push system
C) Kanban
D) pull system
Question
Webster Manufacturing Inc. is implementing a Just-in-Time (JIT) system and wants to know how many Kanbans to use for the initial setup of its JIT system. The daily demand is 400 units and each Kanban (i.e., container) holds 15 units. The combined processing and waiting time per container is 0.7 days. If the initial alpha value for safety stock is 0.6, how many Kanban containers should be authorized?

A) More than 10 but less than or equal to 15 Kanbans
B) More than 15 but less than or equal to 20 Kanbans
C) More than 20 but less than or equal to 25 Kanbans
D) More than 25 Kanbans
Question
ABC Manufacturing Inc. uses a Kanban system for a component. The daily demand is 800 units. Each container has a combined waiting and processing time of 0.34 days. If the container size is 50 and efficiency (safety) factor is 9 percent, how many Kanban card sets should be authorized? SEQ a,_b,_c, \* alphabetic \r 1a. 5 sets
SEQ a,_b,_c, \* alphabetic \nb. 6 sets
SEQ a,_b,_c, \* alphabetic \nc. 7 sets
SEQ a,_b,_c, \* alphabetic \nd. 8 sets
Question
Webster Manufacturing Inc. is implementing a Just-in-Time (JIT) system and wants to know how many Kanbans to use for the initial setup of its JIT system. The daily demand is 400 units and each Kanban (i.e., container) holds 15 units. The combined processing and waiting time per container is 0.7 days. If the initial alpha value for safety stock is 0.6, what is the maximum authorized inventory?

A) More than 100 but less than or equal to 200 units
B) More than 200 but less than or equal to 300 units
C) More than 300 but less than or equal to 400 units
D) More than 400 units
Question
If the number of containers is reduced to one, how many parts must it hold?

A) Less than 25 parts
B) More than 25 but less than or equal to 50 parts
C) More than 50 but less than or equal to 100 parts
D) More than 100 but less than or equal to 150 parts
Question
In a Kanban system, in the formula (i.e., K = [d (p + w)(1 + α\alpha )]/C), the alpha ( α\alpha ) is analogous to _____.

A) demand during the lead time
B) a form of safety stock
C) capacity utilization
D) the reorder point
Question
Which one of the following is a best practice of just-in-time systems?

A) Use of disposable containers
B) Increased setup/changeover times to maximize productivity
C) Minimal distance traveled for materials and parts handling systems
D) Highly specialized jobs with little or no cross-training
Question
Shine Motor Inc. has decided to switch to a "just-in-time system" of manufacturing and distribution for its vehicles. Which one of the following is most likely to occur?

A) Inventory levels will increase.
B) Component parts and subassemblies are now replenished only when needed.
C) Finished goods inventory will decrease, but raw materials and work-in-process inventories will increase.
D) The workers at any given process will produce units before they are needed.
Question
The number of Kanban cards is dependent on all of the following EXCEPT _____.

A) average daily demand rate
B) setup time
C) waiting time
D) safety stock
Question
A(n) _____ is a flag or a piece of paper that contains all relevant information for an order such as part number, description, process area used, time of delivery, quantity available, quantity delivered, and production quantity.

A) matrix
B) metric
C) gauge
D) Kanban
Question
A hinge manufacturing company employs a Kanban system for a component part. The daily demand is 900 hinges. Each container has a wait time of 0.05/day, and a processing time of 0.37 days. The container size is 60 hinges, and the safety factor (α) is 10%. Given this data, the number of Kanbans necessary for this system is _____.

A) less than 4 Kanbans
B) more than 4 but less than or equal to 8 Kanbans
C) more than 8 but less than or equal to 12 Kanbans
D) more than 12 but less than or equal to 16 Kanbans
Question
A manufacturing company is using a two container Kanban system between a downstream (using) and an upstream (producing) work center. Each container holds 25 parts. The using work center can handle 100 parts per day. The average elapsed time for the entire cycle is currently 0.4 days. The company is concerned about the efficiency (and safety stock policy) of the operation. The safety stock factor for the current operation is _____.

A) less than 0.20
B) more than 0.20 but less than or equal to 0.3
C) more than 0.3 but less than or equal to 0.4
D) more than 0.4 but less than or equal to 0.5
Question
Webster Manufacturing Inc. is implementing a Just-in-Time (JIT) system and wants to know how many Kanbans to use for the initial setup of its JIT system. The daily demand is 400 units and each Kanban (i.e., container) holds 15 units. The combined processing and waiting time per container is 0.7 days. If the initial alpha value for safety stock is 0.6 and the processing and waiting time is reduced by 30 percent due to job and process improvements, by how many units is the maximum authorized inventory reduced from the original Webster problem #23 and #24?

A) Less than 100 units
B) More than 100 but less than or equal to 200 units
C) More than 200 but less than or equal to 300 units
D) More than 300 but less than or equal to 400 units
Question
Large batches often reduce teardowns and setups and provide economies of scale.
Question
The 5Ss focus on improving waste generated by inefficient transportation.
Question
Lean operating systems seek to apply the principles of continuous flow to the production of discrete parts by reducing batch size, ideally to a size of one.
Question
Six Sigma addresses visible problems in processes; lean production is more concerned with less visible problems.
Question
Lean principles are always transferrable to front-office services that involve high customer contact and service encounters.
Question
According to the Toyota Motor Company, waiting time is necessary in production and is not classified as waste.
Question
Synchronization of the value chain is a lean approach to increasing speed and response.
Question
In lean thinking, waste need not be classified as simply material waste such as scrap and defective parts.
Question
Lean Six Sigma is simply the union of lean approaches with quality improvement techniques, each of which has been used independently in other applications.
Question
A clean and organized work area is an important principle of lean thinking.
Question
In the context of the 5Ss, standardize means to formalize procedures and practices to create consistency and ensure that
all steps are performed correctly.
Question
Knowledge bottlenecks and equipment breakdowns are a form of waste in organizations.
Question
When producing broad goods or service mix with diverse requirements on common equipment, the ideal strategy is to
run large batches.
Question
Total productive maintenance (TPM) strives to relieve machine operators of routine maintenance activities so that they can focus entirely on being productive.
Question
A goal of total productive maintenance is to have zero accidents in the entire life cycle of an operating system.
Question
To accomplish single piece flow, a manufacturer needs the ability to change between products quickly and inexpensively.
Question
Single minute exchange of dies (SMED) frees up capacity for other productive uses.
Question
Lean production is focused on efficiency by reducing waste and improving process flow, while Six Sigma is focused on effectiveness by reducing errors and defects.
Question
Lean enterprise refers to approaches that focus primarily on the elimination of waste throughout the value chain.
Question
The goal of total productive maintenance (TPM) is to minimize the costs associated with routine maintenance activities.
Question
Explain the concept of Single Minute Exchange of Dies (SMED).
Question
Explain the 5Ss.
Question
Nashua Corporation, a service organization, used lean principles and methods to reduce order-cycle time.
Question
Define lean thinking and the four principles of lean operating systems.
Question
Production Kanbans trigger the movement of parts.
Question
Contrast batching with single-piece flow.
Question
Discuss the seven major categories of waste as defined by Toyota Motor Company.
Question
Lean principles are mostly beneficial to manufacturers and provide little value to service organizations.
Question
The number of Kanban cards is directly proportional to the amount of work-in-process inventory.
Question
In a push system, finished-goods inventory is produced in advance of customer demand using a forecast of sales.
Question
Starbucks successfully implemented lean principles.
Question
Explain the purpose of visual controls and give examples.
Question
Just-in-time (JIT) systems are based on the concept associated with pull systems rather than push systems.
Question
The Timken Company used a Lean Six Sigma approach that was highly successful.
Question
Which of the following statements is TRUE of the Community Medical Association (CMA) case study?

A) The case describes how the 5Ss were used by CMA's 50 databases.
B) Total savings was over $40 million from implementing an integrated operating system with a common data base compared to the previous system.
C) Doctors' total changeover and setup (i.e., system relog) time per patient increased after the new integrated operating system was implemented.
D) The quality of medical diagnosis and decisions (i.e., clinical quality) improved with the new system.
Question
Kanban is the Japanese term for elimination of waste.
Question
Compare and contrast a push system and a pull system.
Question
In a just-in-time (JIT) system, the computer inventory data is the interface and control point between customers and supply cycles.
Question
How does total productive maintenance (TPM) affect lean operating systems?
Question
Discuss the differences between lean production and Six Sigma.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/84
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 17: Lean Operating Systems
1
_____ is NOT a 5S principle that creates a well-organized work environment.

A) Stabilize
B) Standardize
C) Shine
D) Sustain
A
2
Which of the following Ss of the 5Ss means to keep the process going through training, communication, and organizational structures?

A) Shine
B) Sort
C) Sustain
D) Standardize
C
3
Which of the following Ss in the 5S system ensures that each item in a workplace is in its proper place or identified as unnecessary and removed?

A) Sort
B) Set in order
C) Shine
D) Standardize
A
4
Principles of lean operating systems include all of the following EXCEPT _____.

A) eliminating waste
B) improving information technology
C) increasing speed and response
D) reducing costs
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
5
Which of the following statements is TRUE of total productive maintenance (TPM)?

A) It puts total responsibility on maintenance workers.
B) It puts total responsibility on equipment operators.
C) Planned down time is maximized.
D) Employees preserve and protect their equipment.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
6
According to the Toyota Motor Company, which of the following is NOT one of the seven major waste categories?

A) Overproduction
B) Transportation
C) Motion
D) Single-piece flow
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
7
In the 5Ss, a clean work area refers to _____.

A) sort
B) synchronize
C) shine
D) standardize
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
8
According to the seven major categories of waste classified by Toyota Motor Company, long lead times and higher work-in-process are the results of _____.

A) overproduction
B) inventory
C) waiting time
D) transportation
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
9
Which of the following is NOT a basic principle of a lean operating system?

A) Elimination of waste
B) Batching
C) Increased speed and response
D) Improved quality
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
10
Timken Company illustrates the application of lean principles when it _____.

A) reduces the total cycle time for new product development
B) increases safety stock in its inventory system
C) expands factories and distribution centers
D) maximizes the number of parts or items in its systems
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
11
Which of the following is NOT one of the 5Ss?

A) Set in order
B) Sort
C) Standardize
D) Single-piece flow
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
12
Total productive maintenance (TPM) seeks to do all of the following EXCEPT _____.

A) maximizing equipment effectiveness
B) creating worker ownership of equipment by involving them in maintenance activities
C) fostering continuous improvement efforts
D) enabling multiple products in small batches to be run on the same equipment
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
13
The process of producing large quantities of items as a group before they are transferred to the next operation is known as _____.

A) batching
B) outsourcing
C) reshoring
D) offshoring
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
14
Which one of the following statements is TRUE of Lean Six Sigma?

A) Lean principles focus on advanced statistical methods.
B) It is difficult to use lean methods in nonmanufacturing environments.
C) It uses basic root cause, process, and data analysis techniques.
D) Six Sigma and lean principles are separate bodies of knowledge.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
15
Which of the following principles is NOT part of the 5Ss?

A) Synchronize
B) Set in order
C) Shine
D) Sustain
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
16
Toyota classified waste into seven major categories. These categories include all of the following EXCEPT _____.

A) motion
B) ordering
C) inventory
D) waiting time
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
17
Which one of the following is an example of waste in organizations?

A) High capacity resource utilization
B) Retraining and relearning time and expense
C) Correct factory routing of customer orders and jobs
D) High data integrity
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
18
Southwest Airlines illustrates the application of lean principles when it _____.

A) reduces airplane turnaround time at airport gates
B) assigns airplane seats
C) serves all passengers in-flight dinners
D) charges a change of ticket fee for missing a scheduled flight
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
19
Quality at the source requires _____.

A) starting with a plan
B) having reliable suppliers
C) doing it right the first time
D) having a good design
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
20
A quick setup or changeover of tooling and fixtures is associated with _____.

A) visual controls
B) single minute exchange of dies
C) single-piece flow
D) six sigma
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
21
The maximum authorized inventory for this part is _____.

A) less than 25 parts
B) more than 25 but less than or equal to 50 parts
C) more than 50 but less than or equal to 100 parts
D) more than 100 but less than or equal to 150 parts
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
22
Which of the following is NOT a best practice and prerequisite for implementing a just-in-time system?

A) Maximizing the number of parts or items
B) Good calibration of all gauges and testing equipment
C) Clean and uncluttered workplaces
D) Minimizing setup/changeover time
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
23
A withdraw Kanban authorizes _____.

A) the production of parts
B) suppliers to produce
C) the transfer of an empty container
D) shipping to customers
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
24
If the safety stock factor is changed to 0.1 and the number of parts per container is increased to 44, how many containers will be needed?

A) 1 container
B) 2 containers
C) 3 containers
D) 4 containers
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following is LEAST related to a push system?

A) Maximum responsiveness
B) Predefined schedule
C) Finished goods inventory
D) Forecast dependent
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
26
The maximum authorized inventory for the problem given in #35 is _____.

A) less than or equal to 200 units
B) more than 200 but less than or equal to 300 units
C) more than 300 but less than or equal to 400 units
D) more than 400 units
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
27
Which of the following ideas related to lean operating systems is FALSE?

A) The ideal order quantity for single piece flow is one.
B) Accidents are a form of waste in organizations.
C) A push system makes only what you can sell.
D) Overproduction is a form of waste in organizations.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
28
A(n) _____ produces finished-goods inventory in advance of customer demand using a forecast of sales.

A) single minute exchange of dies (SMED)
B) push system
C) Kanban
D) pull system
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
29
Webster Manufacturing Inc. is implementing a Just-in-Time (JIT) system and wants to know how many Kanbans to use for the initial setup of its JIT system. The daily demand is 400 units and each Kanban (i.e., container) holds 15 units. The combined processing and waiting time per container is 0.7 days. If the initial alpha value for safety stock is 0.6, how many Kanban containers should be authorized?

A) More than 10 but less than or equal to 15 Kanbans
B) More than 15 but less than or equal to 20 Kanbans
C) More than 20 but less than or equal to 25 Kanbans
D) More than 25 Kanbans
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
30
ABC Manufacturing Inc. uses a Kanban system for a component. The daily demand is 800 units. Each container has a combined waiting and processing time of 0.34 days. If the container size is 50 and efficiency (safety) factor is 9 percent, how many Kanban card sets should be authorized? SEQ a,_b,_c, \* alphabetic \r 1a. 5 sets
SEQ a,_b,_c, \* alphabetic \nb. 6 sets
SEQ a,_b,_c, \* alphabetic \nc. 7 sets
SEQ a,_b,_c, \* alphabetic \nd. 8 sets
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
31
Webster Manufacturing Inc. is implementing a Just-in-Time (JIT) system and wants to know how many Kanbans to use for the initial setup of its JIT system. The daily demand is 400 units and each Kanban (i.e., container) holds 15 units. The combined processing and waiting time per container is 0.7 days. If the initial alpha value for safety stock is 0.6, what is the maximum authorized inventory?

A) More than 100 but less than or equal to 200 units
B) More than 200 but less than or equal to 300 units
C) More than 300 but less than or equal to 400 units
D) More than 400 units
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
32
If the number of containers is reduced to one, how many parts must it hold?

A) Less than 25 parts
B) More than 25 but less than or equal to 50 parts
C) More than 50 but less than or equal to 100 parts
D) More than 100 but less than or equal to 150 parts
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
33
In a Kanban system, in the formula (i.e., K = [d (p + w)(1 + α\alpha )]/C), the alpha ( α\alpha ) is analogous to _____.

A) demand during the lead time
B) a form of safety stock
C) capacity utilization
D) the reorder point
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
34
Which one of the following is a best practice of just-in-time systems?

A) Use of disposable containers
B) Increased setup/changeover times to maximize productivity
C) Minimal distance traveled for materials and parts handling systems
D) Highly specialized jobs with little or no cross-training
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
35
Shine Motor Inc. has decided to switch to a "just-in-time system" of manufacturing and distribution for its vehicles. Which one of the following is most likely to occur?

A) Inventory levels will increase.
B) Component parts and subassemblies are now replenished only when needed.
C) Finished goods inventory will decrease, but raw materials and work-in-process inventories will increase.
D) The workers at any given process will produce units before they are needed.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
36
The number of Kanban cards is dependent on all of the following EXCEPT _____.

A) average daily demand rate
B) setup time
C) waiting time
D) safety stock
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
37
A(n) _____ is a flag or a piece of paper that contains all relevant information for an order such as part number, description, process area used, time of delivery, quantity available, quantity delivered, and production quantity.

A) matrix
B) metric
C) gauge
D) Kanban
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
38
A hinge manufacturing company employs a Kanban system for a component part. The daily demand is 900 hinges. Each container has a wait time of 0.05/day, and a processing time of 0.37 days. The container size is 60 hinges, and the safety factor (α) is 10%. Given this data, the number of Kanbans necessary for this system is _____.

A) less than 4 Kanbans
B) more than 4 but less than or equal to 8 Kanbans
C) more than 8 but less than or equal to 12 Kanbans
D) more than 12 but less than or equal to 16 Kanbans
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
39
A manufacturing company is using a two container Kanban system between a downstream (using) and an upstream (producing) work center. Each container holds 25 parts. The using work center can handle 100 parts per day. The average elapsed time for the entire cycle is currently 0.4 days. The company is concerned about the efficiency (and safety stock policy) of the operation. The safety stock factor for the current operation is _____.

A) less than 0.20
B) more than 0.20 but less than or equal to 0.3
C) more than 0.3 but less than or equal to 0.4
D) more than 0.4 but less than or equal to 0.5
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
40
Webster Manufacturing Inc. is implementing a Just-in-Time (JIT) system and wants to know how many Kanbans to use for the initial setup of its JIT system. The daily demand is 400 units and each Kanban (i.e., container) holds 15 units. The combined processing and waiting time per container is 0.7 days. If the initial alpha value for safety stock is 0.6 and the processing and waiting time is reduced by 30 percent due to job and process improvements, by how many units is the maximum authorized inventory reduced from the original Webster problem #23 and #24?

A) Less than 100 units
B) More than 100 but less than or equal to 200 units
C) More than 200 but less than or equal to 300 units
D) More than 300 but less than or equal to 400 units
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
41
Large batches often reduce teardowns and setups and provide economies of scale.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
42
The 5Ss focus on improving waste generated by inefficient transportation.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
43
Lean operating systems seek to apply the principles of continuous flow to the production of discrete parts by reducing batch size, ideally to a size of one.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
44
Six Sigma addresses visible problems in processes; lean production is more concerned with less visible problems.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
45
Lean principles are always transferrable to front-office services that involve high customer contact and service encounters.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
46
According to the Toyota Motor Company, waiting time is necessary in production and is not classified as waste.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
47
Synchronization of the value chain is a lean approach to increasing speed and response.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
48
In lean thinking, waste need not be classified as simply material waste such as scrap and defective parts.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
49
Lean Six Sigma is simply the union of lean approaches with quality improvement techniques, each of which has been used independently in other applications.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
50
A clean and organized work area is an important principle of lean thinking.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
51
In the context of the 5Ss, standardize means to formalize procedures and practices to create consistency and ensure that
all steps are performed correctly.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
52
Knowledge bottlenecks and equipment breakdowns are a form of waste in organizations.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
53
When producing broad goods or service mix with diverse requirements on common equipment, the ideal strategy is to
run large batches.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
54
Total productive maintenance (TPM) strives to relieve machine operators of routine maintenance activities so that they can focus entirely on being productive.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
55
A goal of total productive maintenance is to have zero accidents in the entire life cycle of an operating system.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
56
To accomplish single piece flow, a manufacturer needs the ability to change between products quickly and inexpensively.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
57
Single minute exchange of dies (SMED) frees up capacity for other productive uses.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
58
Lean production is focused on efficiency by reducing waste and improving process flow, while Six Sigma is focused on effectiveness by reducing errors and defects.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
59
Lean enterprise refers to approaches that focus primarily on the elimination of waste throughout the value chain.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
60
The goal of total productive maintenance (TPM) is to minimize the costs associated with routine maintenance activities.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
61
Explain the concept of Single Minute Exchange of Dies (SMED).
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
62
Explain the 5Ss.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
63
Nashua Corporation, a service organization, used lean principles and methods to reduce order-cycle time.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
64
Define lean thinking and the four principles of lean operating systems.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
65
Production Kanbans trigger the movement of parts.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
66
Contrast batching with single-piece flow.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
67
Discuss the seven major categories of waste as defined by Toyota Motor Company.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
68
Lean principles are mostly beneficial to manufacturers and provide little value to service organizations.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
69
The number of Kanban cards is directly proportional to the amount of work-in-process inventory.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
70
In a push system, finished-goods inventory is produced in advance of customer demand using a forecast of sales.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
71
Starbucks successfully implemented lean principles.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
72
Explain the purpose of visual controls and give examples.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
73
Just-in-time (JIT) systems are based on the concept associated with pull systems rather than push systems.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
74
The Timken Company used a Lean Six Sigma approach that was highly successful.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
75
Which of the following statements is TRUE of the Community Medical Association (CMA) case study?

A) The case describes how the 5Ss were used by CMA's 50 databases.
B) Total savings was over $40 million from implementing an integrated operating system with a common data base compared to the previous system.
C) Doctors' total changeover and setup (i.e., system relog) time per patient increased after the new integrated operating system was implemented.
D) The quality of medical diagnosis and decisions (i.e., clinical quality) improved with the new system.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
76
Kanban is the Japanese term for elimination of waste.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
77
Compare and contrast a push system and a pull system.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
78
In a just-in-time (JIT) system, the computer inventory data is the interface and control point between customers and supply cycles.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
79
How does total productive maintenance (TPM) affect lean operating systems?
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
80
Discuss the differences between lean production and Six Sigma.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 84 flashcards in this deck.