Deck 14: Resource Planning

Full screen (f)
exit full mode
Question
Independent demand is the demand for ______________.

A)finished products
B)subassemblies
C)parts
D)raw materials
E)components
Use Space or
up arrow
down arrow
to flip the card.
Question
Which of the following most closely describes dependent demand?

A)demand generated by suppliers
B)demand that is seasonal
C)demand estimates using regression analysis
D)demand derived from finished products
E)demand for repair parts
Question
Companies use ____________ to check that enough work is scheduled for operations and that the amount of work scheduled is feasible.

A)capacity management
B)closed-loop requirements planning
C)cut requirements planning
D)capacity resources planning
E)capacity requirements planning
Question
_______________ MRP is an MRP system that includes production planning,master production scheduling,and capacity requirements planning.

A)Fully-integrated
B)Closed-loop
C)Open-loop
D)Wide-range
E)Enterprise
Question
In the mid-1970s,MRPII was developed.One of its major components is:

A)leadership
B)inventory management
C)operations execution
D)strategic management
E)marketing
Question
Which ERP module includes work-flow analysis?

A)finance and accounting
B)information systems
C)sales and marketing
D)production and materials management
E)human resources
Question
The most critical factors for successful EPR implementation are ______ and _________ ______.

A)leadership,top management commitment
B)leadership,technological transfer management
C)management,technological transfer management
D)funding,top management commitment
E)leadership,detailed technical specifications
Question
Second-generation ERP systems are referred to as ___________ software.

A)scheduling
B)MRP
C)inventory management
D)MPS
E)SCM
Question
ERP is software designed for _____ and ______ business processes.

A)calculating,budgeting
B)deleting,changing
C)organizing,managing
D)organizing,budgeting
E)selecting,managing
Question
What is an information system designed to integrate internal and external members of the supply chain?

A)material requirements planning
B)master production schedule
C)capacity requirements planning
D)aggregate planning
E)enterprise resource planning
Question
Which ERP module includes investment management?

A)finance and accounting
B)information systems
C)sales and marketing
D)production and materials management
E)human resources
Question
What does ERP stand for?

A)educational resources planning
B)end routing procedure
C)enterprise reliability production
D)enterprise resource planning
E)easy resource planning
Question
What information system enables companies to have the right material in the right amounts available at the right time?

A)manufacturing resources planning
B)multifunctional requirements planning
C)material requirements planning
D)material relationships planning
E)manufacturing requirements planning
Question
Which ERP module handles billing?

A)finance and accounting
B)information systems
C)sales and marketing
D)production and materials management
E)human resources
Question
Which of the following is not one of the four basic categories of ERP modules?

A)finance and accounting
B)information systems
C)sales and marketing
D)production and materials management
E)human resources
Question
What proportion of U.S.companies with greater than $1 billion in annual revenues has implemented ERP?

A)10%
B)20%
C)40%
D)75%
E)95%
Question
Owens Corning reported savings of ______________ by using ERP.

A)$6 million
B)$16 million
C)$65 million
D)$600 million
E)$660 million
Question
ERP systems provide _____ and _____ benefits.

A)tangible,HR
B)intangible,marketing
C)marketing,operation
D)tangible,intangible
E)CEO,CFO
Question
Second generation ERP systems addressed the first generation deficiency of:

A)inadequate statistics
B)interdepartmental communications
C)integrated modules
D)continuous planning capabilities
E)forecasting capabilities
Question
The ERP system provides a single interface:

A)to operations only.
B)to operations and inventory control only.
C)to external members of the supply chain as well.
D)to the company management structure only.
E)to customers only.
Question
The quantity of the replenishment order is based on the __________________________.

A)capacity available
B)size of the item
C)number of workers available
D)inventory space available
E)lot sizing rule used
Question
What is a technique for improving inventory record accuracy?

A)cycle counting
B)drum,buffer,rope
C)Kanban
D)tracking signal
E)statistical process control
Question
The time interval necessary to either manufacture or purchase an item is its ______________.

A)time fence
B)lead time
C)safety time
D)time bucket
E)receipt time
Question
MRP develops a ____________ that shows future demand,supply and inventories by time period.

A)DSI report
B)snapshot forecast
C)requirements plan
D)material movements schedule
E)time-phased schedule
Question
Which of the following is an objective of MRP?

A)Keep priorities updated and valid.
B)Keep track of material movements on the shop floor.
C)Provide information for expediting orders.
D)Allocate scarce parts to products.
E)Provide information for activity based costing.
Question
The ____________ file lists the materials needed to build a product.

A)master production schedule
B)bill of material
C)inventory records
D)material needs
E)build structure
Question
Information in the inventory records file that can change with inventory transactions includes the ________.

A)part number
B)lot size rule
C)projected inventory level
D)lead time
E)safety stock requirement
Question
The authorized MPS is a statement of ______________________________.

A)manufacturing orders that have been authorized for release to the shop floor
B)which workers are authorized to work on which machines
C)what the company expects to build and when it expects to build it
D)authorized payments to vendors
E)where different end products are authorized to be manufactured
Question
For every scheduled receipt in an MRP table,there is also in the organization a(n)__________________.

A)shop floor order
B)order that has been placed but not yet been received
C)planned order
D)period order
E)dispatch list
Question
When there is insufficient inventory to satisfy the forecast for a particular period a(n)_____________ order must be placed.

A)BOM
B)restock
C)inventory request
D)MPS
E)MRP
Question
The ____________ is (are)checked for the materials on hand and those that need to be procured.

A)master production schedule
B)bill of material
C)inventory records
D)material inventories
E)promised deliveries
Question
An error in replenishment ordering can result from a(n)_____________________________.

A)inaccuracy in the inventory records file
B)breakdown of equipment
C)expediting of an order
D)circumstance of working excessive overtime
E)error in accounts receivables
Question
Scheduled receipts are _________________________________________.

A)planned orders
B)planned orders offset by lead time
C)gross requirements offset by lead time
D)gross requirements minus inventory
E)replenishment orders that have been placed but not yet received
Question
Which of the following is not true concerning replenishment orders?

A)They are generated when there is not enough inventory.
B)MRP specifies when to place the order.
C)The order may be for material from a supplier.
D)They are orders for the final product.
E)The order may be for material from the manufacturing floor.
Question
Information that may be contained in the inventory records file includes all except which of the following?

A)part numbers
B)run times for manufactured parts
C)part names
D)lead times
E)safety stock requirements
Question
CRP systems are used to check that the amount of work:

A)meets the MRP directive.
B)meets the ERP directive.
C)will make a profit.
D)is feasible.
E)meets OSHA requirements.
Question
In MRP,the starting points for each part and material needed to accomplish the master production schedule are the ___________________.

A)net requirements
B)gross requirements
C)planned releases
D)scheduled receipts
E)planned receipts
Question
Gross requirements for finished products are taken from ________________________.

A)the inventory records file
B)the order entry file
C)the authorized MPS
D)the bill of materials file
E)forecasted sales
Question
A computer-based information system designed to manage dependent demand inventory is _____________.

A)manufacturing resources planning
B)multifunctional requirements planning
C)material relationships planning
D)material requirements planning
E)manufacturing requirements planning
Question
The ____________ details the company's planned products,quantity,and the schedule used by marketing when promising deliveries.

A)master production schedule
B)bill of material
C)inventory records
D)material product sales
E)promised deliveries
Question
An order released to a supplier authorizes ______________________________________.

A)the shipment of the material so that it arrives as needed
B)movement of the material from the warehouse to the supplier
C)the sending of information concerning production to the supplier
D)accounting to set up an accounts receivable entry
E)the logistics manager to start investigating shipment options
Question
The gross requirements of a given component part are determined from ______________________.

A)scheduled receipts plus projected available
B)gross requirements of the parent
C)planned orders of the parent
D)projected available of the end item
E)planned orders of the end item
Question
The MRP file that contains data on specific materials used to make final products and their correct quantities is the ______________________.

A)authorized master production schedule
B)bill of materials file
C)inventory records file
D)part status file
E)routing file
Question
The current time period is referred to as __________________.

A)time zero
B)the point of departure
C)the start time
D)the action bucket
E)this year
Question
Which of the following is not true concerning indented bills of materials?

A)Subsequent levels are indented further to the right.
B)Children are indented toward the right.
C)The highest level parents are closest to the left margin.
D)Quantity required is shown for each part number.
E)Lead times determine how far children are indented.
Question
An action notice is generated ________________________________________.

A)for planned orders in any period
B)only for orders that are to be released to the shop floor
C)only for movements to and from the warehouse
D)only when marketing needs to be notified
E)when a planned order needs to be released
Question
The lead time can be less than the cumulative lead time when _________________________.

A)the company has inventory on hand
B)the order has already been shipped
C)the supply chain is well tuned
D)there is no safety time
E)the order is expedited
Question
Which of the following is not true for action notices that are produced by MRP systems?

A)An action notice is produced when a planned order needs to be released.
B)An action notice is produced when due dates of orders need to be adjusted.
C)An action notice is produced when the lead time is not sufficient for a planned order.
D)An action notice is produced when inventory is moved to the manufacturing floor.
E)They indicate actions that need to be taken by inventory planners.
Question
The beginning inventory for any time period is equal to _____________________________________.

A)safety stock plus gross requirements from the previous period
B)scheduled receipts plus projected available quantity
C)planned orders plus scheduled orders
D)projected available quantity from at the end of the previous period
E)gross requirements less scheduled orders
Question
An item that has no parents is a(n)______________.

A)subassembly
B)end item
C)child item
D)intermediate assemble
E)component
Question
If an order is not scheduled to arrive in time,the planner tries to ________________.

A)find a replacement order
B)cancel the order
C)split the order in two
D)expedite the order
E)talk marketing into changing the due date
Question
When there is insufficient inventory to cover the gross requirements for a period

A)an MRP is placed
B)an ERP is placed
C)a planned order is placed
D)a scheduled order is placed
E)a rush order occurs
Question
Which of the following is not true for planned orders?

A)They are necessary only for finished products.
B)They result when there is not enough inventory to cover the gross requirements.
C)The quantity is calculated using the lot-sizing rule.
D)The lead time is required to determine when the order should be placed.
E)The inventory records file is updated for the order.
Question
For any period the beginning inventory,plus any replenishment orders due,less the gross requirement equals is called the __________________________.

A)planned orders
B)projected available quantity
C)scheduled receipts
D)lead time
E)safety stock
Question
The MRP input listing the intermediate assemblies,subassemblies,component parts,raw materials,and the quantities of each needed to produce one final product is the ___________________________.

A)authorized master production schedule
B)bill of materials file
C)inventory records file
D)part status file
E)assembly time chart
Question
Which of the following is not a lot size rule?

A)lot for lot
B)fixed order quantity
C)overall factors
D)least total costs
E)parts period balancing
Question
A positive quantity in the current period's planned order row means that ___________________.

A)lead time is too long
B)the projected available is negative
C)gross requirements are too large
D)the planned order is due to be completed in the current period
E)an order must be released
Question
The cumulative lead time is _______________________________.

A)the sum of the lead times for all the components
B)the sum of the lead time and the safety time
C)the number of time buckets used in the MRP
D)the longest route in terms of time from the low level items to the end item in the product structure tree
E)lead time less the safety time
Question
A visual depiction of the subassemblies and components that are needed to produce a finished product is called a(n)______________________.

A)assembly time chart
B)product structure tree
C)peg
D)product chart
E)blueprint
Question
Production and inventory planners release orders to ________________________.

A)the expediter
B)either an external supplier or to the shop floor
C)the logistics manager
D)either the shop floor or to the warehouse
E)marketing
Question
With capacity requirements planning,the calculated workload for a work center is compared with ___________.

A)available capacity
B)calculated workloads for other work centers
C)the cost of expanding the work center
D)standard capacity
E)design capacity
Question
Material requirements planning is an information system designed to integrate internal and external members of the supply chain.
Question
Capacity requirements planning enables the company to evaluate ____________________.

A)employee morale
B)its suppliers
C)its manufacturing costs
D)quality
E)how well it is using its critical work centers
Question
Dell practices _____________________________.

A)focused customization
B)make to stock production
C)mass merchandising
D)mass customization
E)frozen assembly schedules
Question
Different lot size rules determine the quantity of the order and __________________.

A)the quality
B)change the frequency of replenishment orders
C)how projected available is calculated
D)the lead time
E)the backorder cost
Question
Capacity requirements planning uses data from _________________________.

A)MRP
B)rough-cut capacity planning
C)aggregate planning
D)MPS
E)the bill of labor file
Question
Selection of the lot size rule to be used should be based on minimizing ____________________.

A)the order size
B)late shipments
C)total processing time
D)quality problems
E)the sum of ordering and carrying costs
Question
If setup costs are essentially zero (negligible when compared to carrying costs),which approach should be used for lot sizing?

A)lot for lot
B)fixed order quantity
C)period order quantity with POQ = 6 periods
D)period order quantity with POQ = 2 periods
E)period order quantity with POQ = 4 periods
Question
Which of the following is not an intangible benefit of ERP?

A)improved customer response
B)better integration between systems
C)global sharing of information
D)increased flexibility
E)improved on-time delivery performance
Question
Setup time is changed:

A)once each day regardless of product changes.
B)each time the operator begins the machine.
C)each time the machine is prepared to produce the desired item quantity.
D)for each shift that works on the desired item quantity manufacturing.
E)on rare occasions if it takes significant time.
Question
Which of the following is not a major supplier of ERP systems?

A)SAP AG
B)PeopleSoft
C)Oracle
D)Infor.com
E)IBM
Question
Which of the following does not share a common ERP database?

A)internal to the organization
B)suppliers
C)customers
D)the supply chain
E)CEO strategic plan
Question
According to the textbook,most manufacturing operations,production or inventory control planners are responsible for working with MRP.Planners are typically responsible for all except which of the following:

A)end item inventory items
B)subassemblies inventory items
C)component inventory items
D)raw material pricing
E)supplier delays
Question
ERP systems are more commonly found in small companies than in large ones.
Question
The primary objective of ERP is to integrate all departments and functions,internal and external,onto a single computer system to serve the enterprise's needs.
Question
ERP modules are fully integrated.
Question
For capacity requirements planning,loads for critical work centers are calculated based on ___________.

A)open external supplier orders and planned external supplier orders
B)gross requirements for the end product
C)open shop orders and planned shop orders
D)safety stock
E)the sum of ordering and carrying costs
Question
Which of the following is not a direct input to capacity requirements planning?

A)planned shop orders
B)open shop orders
C)setup time and run time per unit for shop orders
D)current inventory levels
E)quantity for shop orders
Question
Supply chain intelligence enables strategic decision-making along the supply chain.
Question
If the available capacity at a work center is not adequate,the company can __________________.

A)decrease run times per piece
B)authorize overtime
C)expedite
D)decrease order quantities
E)hold up payment
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/131
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 14: Resource Planning
1
Independent demand is the demand for ______________.

A)finished products
B)subassemblies
C)parts
D)raw materials
E)components
finished products
2
Which of the following most closely describes dependent demand?

A)demand generated by suppliers
B)demand that is seasonal
C)demand estimates using regression analysis
D)demand derived from finished products
E)demand for repair parts
demand derived from finished products
3
Companies use ____________ to check that enough work is scheduled for operations and that the amount of work scheduled is feasible.

A)capacity management
B)closed-loop requirements planning
C)cut requirements planning
D)capacity resources planning
E)capacity requirements planning
capacity requirements planning
4
_______________ MRP is an MRP system that includes production planning,master production scheduling,and capacity requirements planning.

A)Fully-integrated
B)Closed-loop
C)Open-loop
D)Wide-range
E)Enterprise
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
5
In the mid-1970s,MRPII was developed.One of its major components is:

A)leadership
B)inventory management
C)operations execution
D)strategic management
E)marketing
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
6
Which ERP module includes work-flow analysis?

A)finance and accounting
B)information systems
C)sales and marketing
D)production and materials management
E)human resources
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
7
The most critical factors for successful EPR implementation are ______ and _________ ______.

A)leadership,top management commitment
B)leadership,technological transfer management
C)management,technological transfer management
D)funding,top management commitment
E)leadership,detailed technical specifications
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
8
Second-generation ERP systems are referred to as ___________ software.

A)scheduling
B)MRP
C)inventory management
D)MPS
E)SCM
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
9
ERP is software designed for _____ and ______ business processes.

A)calculating,budgeting
B)deleting,changing
C)organizing,managing
D)organizing,budgeting
E)selecting,managing
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
10
What is an information system designed to integrate internal and external members of the supply chain?

A)material requirements planning
B)master production schedule
C)capacity requirements planning
D)aggregate planning
E)enterprise resource planning
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
11
Which ERP module includes investment management?

A)finance and accounting
B)information systems
C)sales and marketing
D)production and materials management
E)human resources
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
12
What does ERP stand for?

A)educational resources planning
B)end routing procedure
C)enterprise reliability production
D)enterprise resource planning
E)easy resource planning
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
13
What information system enables companies to have the right material in the right amounts available at the right time?

A)manufacturing resources planning
B)multifunctional requirements planning
C)material requirements planning
D)material relationships planning
E)manufacturing requirements planning
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
14
Which ERP module handles billing?

A)finance and accounting
B)information systems
C)sales and marketing
D)production and materials management
E)human resources
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
15
Which of the following is not one of the four basic categories of ERP modules?

A)finance and accounting
B)information systems
C)sales and marketing
D)production and materials management
E)human resources
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
16
What proportion of U.S.companies with greater than $1 billion in annual revenues has implemented ERP?

A)10%
B)20%
C)40%
D)75%
E)95%
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
17
Owens Corning reported savings of ______________ by using ERP.

A)$6 million
B)$16 million
C)$65 million
D)$600 million
E)$660 million
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
18
ERP systems provide _____ and _____ benefits.

A)tangible,HR
B)intangible,marketing
C)marketing,operation
D)tangible,intangible
E)CEO,CFO
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
19
Second generation ERP systems addressed the first generation deficiency of:

A)inadequate statistics
B)interdepartmental communications
C)integrated modules
D)continuous planning capabilities
E)forecasting capabilities
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
20
The ERP system provides a single interface:

A)to operations only.
B)to operations and inventory control only.
C)to external members of the supply chain as well.
D)to the company management structure only.
E)to customers only.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
21
The quantity of the replenishment order is based on the __________________________.

A)capacity available
B)size of the item
C)number of workers available
D)inventory space available
E)lot sizing rule used
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
22
What is a technique for improving inventory record accuracy?

A)cycle counting
B)drum,buffer,rope
C)Kanban
D)tracking signal
E)statistical process control
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
23
The time interval necessary to either manufacture or purchase an item is its ______________.

A)time fence
B)lead time
C)safety time
D)time bucket
E)receipt time
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
24
MRP develops a ____________ that shows future demand,supply and inventories by time period.

A)DSI report
B)snapshot forecast
C)requirements plan
D)material movements schedule
E)time-phased schedule
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following is an objective of MRP?

A)Keep priorities updated and valid.
B)Keep track of material movements on the shop floor.
C)Provide information for expediting orders.
D)Allocate scarce parts to products.
E)Provide information for activity based costing.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
26
The ____________ file lists the materials needed to build a product.

A)master production schedule
B)bill of material
C)inventory records
D)material needs
E)build structure
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
27
Information in the inventory records file that can change with inventory transactions includes the ________.

A)part number
B)lot size rule
C)projected inventory level
D)lead time
E)safety stock requirement
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
28
The authorized MPS is a statement of ______________________________.

A)manufacturing orders that have been authorized for release to the shop floor
B)which workers are authorized to work on which machines
C)what the company expects to build and when it expects to build it
D)authorized payments to vendors
E)where different end products are authorized to be manufactured
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
29
For every scheduled receipt in an MRP table,there is also in the organization a(n)__________________.

A)shop floor order
B)order that has been placed but not yet been received
C)planned order
D)period order
E)dispatch list
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
30
When there is insufficient inventory to satisfy the forecast for a particular period a(n)_____________ order must be placed.

A)BOM
B)restock
C)inventory request
D)MPS
E)MRP
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
31
The ____________ is (are)checked for the materials on hand and those that need to be procured.

A)master production schedule
B)bill of material
C)inventory records
D)material inventories
E)promised deliveries
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
32
An error in replenishment ordering can result from a(n)_____________________________.

A)inaccuracy in the inventory records file
B)breakdown of equipment
C)expediting of an order
D)circumstance of working excessive overtime
E)error in accounts receivables
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
33
Scheduled receipts are _________________________________________.

A)planned orders
B)planned orders offset by lead time
C)gross requirements offset by lead time
D)gross requirements minus inventory
E)replenishment orders that have been placed but not yet received
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
34
Which of the following is not true concerning replenishment orders?

A)They are generated when there is not enough inventory.
B)MRP specifies when to place the order.
C)The order may be for material from a supplier.
D)They are orders for the final product.
E)The order may be for material from the manufacturing floor.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
35
Information that may be contained in the inventory records file includes all except which of the following?

A)part numbers
B)run times for manufactured parts
C)part names
D)lead times
E)safety stock requirements
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
36
CRP systems are used to check that the amount of work:

A)meets the MRP directive.
B)meets the ERP directive.
C)will make a profit.
D)is feasible.
E)meets OSHA requirements.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
37
In MRP,the starting points for each part and material needed to accomplish the master production schedule are the ___________________.

A)net requirements
B)gross requirements
C)planned releases
D)scheduled receipts
E)planned receipts
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
38
Gross requirements for finished products are taken from ________________________.

A)the inventory records file
B)the order entry file
C)the authorized MPS
D)the bill of materials file
E)forecasted sales
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
39
A computer-based information system designed to manage dependent demand inventory is _____________.

A)manufacturing resources planning
B)multifunctional requirements planning
C)material relationships planning
D)material requirements planning
E)manufacturing requirements planning
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
40
The ____________ details the company's planned products,quantity,and the schedule used by marketing when promising deliveries.

A)master production schedule
B)bill of material
C)inventory records
D)material product sales
E)promised deliveries
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
41
An order released to a supplier authorizes ______________________________________.

A)the shipment of the material so that it arrives as needed
B)movement of the material from the warehouse to the supplier
C)the sending of information concerning production to the supplier
D)accounting to set up an accounts receivable entry
E)the logistics manager to start investigating shipment options
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
42
The gross requirements of a given component part are determined from ______________________.

A)scheduled receipts plus projected available
B)gross requirements of the parent
C)planned orders of the parent
D)projected available of the end item
E)planned orders of the end item
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
43
The MRP file that contains data on specific materials used to make final products and their correct quantities is the ______________________.

A)authorized master production schedule
B)bill of materials file
C)inventory records file
D)part status file
E)routing file
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
44
The current time period is referred to as __________________.

A)time zero
B)the point of departure
C)the start time
D)the action bucket
E)this year
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
45
Which of the following is not true concerning indented bills of materials?

A)Subsequent levels are indented further to the right.
B)Children are indented toward the right.
C)The highest level parents are closest to the left margin.
D)Quantity required is shown for each part number.
E)Lead times determine how far children are indented.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
46
An action notice is generated ________________________________________.

A)for planned orders in any period
B)only for orders that are to be released to the shop floor
C)only for movements to and from the warehouse
D)only when marketing needs to be notified
E)when a planned order needs to be released
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
47
The lead time can be less than the cumulative lead time when _________________________.

A)the company has inventory on hand
B)the order has already been shipped
C)the supply chain is well tuned
D)there is no safety time
E)the order is expedited
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
48
Which of the following is not true for action notices that are produced by MRP systems?

A)An action notice is produced when a planned order needs to be released.
B)An action notice is produced when due dates of orders need to be adjusted.
C)An action notice is produced when the lead time is not sufficient for a planned order.
D)An action notice is produced when inventory is moved to the manufacturing floor.
E)They indicate actions that need to be taken by inventory planners.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
49
The beginning inventory for any time period is equal to _____________________________________.

A)safety stock plus gross requirements from the previous period
B)scheduled receipts plus projected available quantity
C)planned orders plus scheduled orders
D)projected available quantity from at the end of the previous period
E)gross requirements less scheduled orders
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
50
An item that has no parents is a(n)______________.

A)subassembly
B)end item
C)child item
D)intermediate assemble
E)component
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
51
If an order is not scheduled to arrive in time,the planner tries to ________________.

A)find a replacement order
B)cancel the order
C)split the order in two
D)expedite the order
E)talk marketing into changing the due date
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
52
When there is insufficient inventory to cover the gross requirements for a period

A)an MRP is placed
B)an ERP is placed
C)a planned order is placed
D)a scheduled order is placed
E)a rush order occurs
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
53
Which of the following is not true for planned orders?

A)They are necessary only for finished products.
B)They result when there is not enough inventory to cover the gross requirements.
C)The quantity is calculated using the lot-sizing rule.
D)The lead time is required to determine when the order should be placed.
E)The inventory records file is updated for the order.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
54
For any period the beginning inventory,plus any replenishment orders due,less the gross requirement equals is called the __________________________.

A)planned orders
B)projected available quantity
C)scheduled receipts
D)lead time
E)safety stock
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
55
The MRP input listing the intermediate assemblies,subassemblies,component parts,raw materials,and the quantities of each needed to produce one final product is the ___________________________.

A)authorized master production schedule
B)bill of materials file
C)inventory records file
D)part status file
E)assembly time chart
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
56
Which of the following is not a lot size rule?

A)lot for lot
B)fixed order quantity
C)overall factors
D)least total costs
E)parts period balancing
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
57
A positive quantity in the current period's planned order row means that ___________________.

A)lead time is too long
B)the projected available is negative
C)gross requirements are too large
D)the planned order is due to be completed in the current period
E)an order must be released
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
58
The cumulative lead time is _______________________________.

A)the sum of the lead times for all the components
B)the sum of the lead time and the safety time
C)the number of time buckets used in the MRP
D)the longest route in terms of time from the low level items to the end item in the product structure tree
E)lead time less the safety time
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
59
A visual depiction of the subassemblies and components that are needed to produce a finished product is called a(n)______________________.

A)assembly time chart
B)product structure tree
C)peg
D)product chart
E)blueprint
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
60
Production and inventory planners release orders to ________________________.

A)the expediter
B)either an external supplier or to the shop floor
C)the logistics manager
D)either the shop floor or to the warehouse
E)marketing
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
61
With capacity requirements planning,the calculated workload for a work center is compared with ___________.

A)available capacity
B)calculated workloads for other work centers
C)the cost of expanding the work center
D)standard capacity
E)design capacity
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
62
Material requirements planning is an information system designed to integrate internal and external members of the supply chain.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
63
Capacity requirements planning enables the company to evaluate ____________________.

A)employee morale
B)its suppliers
C)its manufacturing costs
D)quality
E)how well it is using its critical work centers
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
64
Dell practices _____________________________.

A)focused customization
B)make to stock production
C)mass merchandising
D)mass customization
E)frozen assembly schedules
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
65
Different lot size rules determine the quantity of the order and __________________.

A)the quality
B)change the frequency of replenishment orders
C)how projected available is calculated
D)the lead time
E)the backorder cost
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
66
Capacity requirements planning uses data from _________________________.

A)MRP
B)rough-cut capacity planning
C)aggregate planning
D)MPS
E)the bill of labor file
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
67
Selection of the lot size rule to be used should be based on minimizing ____________________.

A)the order size
B)late shipments
C)total processing time
D)quality problems
E)the sum of ordering and carrying costs
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
68
If setup costs are essentially zero (negligible when compared to carrying costs),which approach should be used for lot sizing?

A)lot for lot
B)fixed order quantity
C)period order quantity with POQ = 6 periods
D)period order quantity with POQ = 2 periods
E)period order quantity with POQ = 4 periods
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
69
Which of the following is not an intangible benefit of ERP?

A)improved customer response
B)better integration between systems
C)global sharing of information
D)increased flexibility
E)improved on-time delivery performance
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
70
Setup time is changed:

A)once each day regardless of product changes.
B)each time the operator begins the machine.
C)each time the machine is prepared to produce the desired item quantity.
D)for each shift that works on the desired item quantity manufacturing.
E)on rare occasions if it takes significant time.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
71
Which of the following is not a major supplier of ERP systems?

A)SAP AG
B)PeopleSoft
C)Oracle
D)Infor.com
E)IBM
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
72
Which of the following does not share a common ERP database?

A)internal to the organization
B)suppliers
C)customers
D)the supply chain
E)CEO strategic plan
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
73
According to the textbook,most manufacturing operations,production or inventory control planners are responsible for working with MRP.Planners are typically responsible for all except which of the following:

A)end item inventory items
B)subassemblies inventory items
C)component inventory items
D)raw material pricing
E)supplier delays
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
74
ERP systems are more commonly found in small companies than in large ones.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
75
The primary objective of ERP is to integrate all departments and functions,internal and external,onto a single computer system to serve the enterprise's needs.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
76
ERP modules are fully integrated.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
77
For capacity requirements planning,loads for critical work centers are calculated based on ___________.

A)open external supplier orders and planned external supplier orders
B)gross requirements for the end product
C)open shop orders and planned shop orders
D)safety stock
E)the sum of ordering and carrying costs
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
78
Which of the following is not a direct input to capacity requirements planning?

A)planned shop orders
B)open shop orders
C)setup time and run time per unit for shop orders
D)current inventory levels
E)quantity for shop orders
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
79
Supply chain intelligence enables strategic decision-making along the supply chain.
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
80
If the available capacity at a work center is not adequate,the company can __________________.

A)decrease run times per piece
B)authorize overtime
C)expedite
D)decrease order quantities
E)hold up payment
Unlock Deck
Unlock for access to all 131 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 131 flashcards in this deck.