Deck 2: Initializing and Conceptualizing the IT Project

Full screen (f)
exit full mode
Question
A methodology provides a strategic-level plan for managing and controlling IT projects.
Use Space or
up arrow
down arrow
to flip the card.
Question
Feasibility focuses on what can go wrong and what must go right.
Question
The primary focus of "the conceptualize and initialize phase" is to determine the overall goal of the project.
Question
An Information Technology Project Methodology ITPM )

A)is an alternative metric for deciding between competing projects.
B)is a six-phase program described by PMBOK and offered as a generally accepted industry practice.
C)is specified by parameters of the business case.
D)is a set of deliverables derived from the various PLC phases.
E)is a strategic-level plan for managing and controlling IT projects.
Question
Scoring models are useful because they allow for the inclusion of qualitative factors.
Question
The MOV should be adjusted at each phase of a project to align with the realities of project execution.
Question
All cash flows over the useful life of a project alternative must be included in the payback method of analysis.
Question
The SDLC systems development life cycle)is a deliverable from the project charter.
Question
The MOV should explicitly state the technology that will support the IT project.
Question
A scoring model can combine both qualitative items based reflected in the weights and scores that are based on people's judgments.
Question
Feasibility focuses on whether a particular alternative is doable and worth doing.
Question
The total cost of ownership TCO)includes only the direct or up-front costs and ongoing expenditures.
Question
The project charter is a key deliverable for the second phase of the IT project methodology.
Question
The total benefits of ownership TBO)should address the benefits of an alternative over its useful life.
Question
A business case is a deliverable that documents the project's goal,as well as several alternatives or options.
Question
Project Management processes include Scope,Schedule,Budget,and Quality.
Question
For the sake of efficiency and unity of purpose and direction,it is usually advisable to have the project manager take sole responsibility for developing the business case.
Question
In general,riskier project alternatives will have a lower breakeven point than less risky project alternatives.
Question
The net present value method of project valuation takes into account all relevant cash flows as well as the company's required rate of return.
Question
A significant deficiency of the payback method of analyzing alternatives is the failure to account for the time value of money.
Question
Planning,executing,and controlling are examples of:

A)Project Management process groups.
B)Project Management tools.
C)PMBOK areas of knowledge
D)Project Management objectives
E)Project Management infrastructure.
Question
Which of the following statements is the best indicator that the new software project was successful.

A)The project's product,a software system,was enthusiastically accepted by 100% of the end users who were able to begin using it after completing only a one-day training session.
B)The project's product,a software system,was a week late and 2% over budget,but six months later was found to have met the company's goal of reducing service callbacks by 15%.
C)The project's product,a software system,was completed two weeks ahead of time freeing up the entire development team to begin work on other projects.
D)The project's product,a software system,was completed right on schedule and was delivered $10,000 under the $100,000 budget allocation.
E)The project's product,a software system,was completed on time and on budget and was tested and shown to be 100% bug-free.
Question
Which of the following statements about the business case is NOT :

A)A business case provides an analysis of feasibility
B)A business case provides senior management with sufficient information to fund a project.
C)A business case provides details of possible impacts,costs and benefits.
D)A business case provides a project budget.
E)A business case may be a large,formal document.
Question
Verification of all project deliverables occurs during ___.

A)Conceptualize and initialize the project Phase 1)
B)Develop the project charter and plan Phase 2)
C)Execute and control Phase 3)
D)Close project Phase 4)
E)Evaluate project success Phase 5)
Question
Which of the following is the best MOV statement?

A)Our project should make Dayton customers flock to the stores in droves to buy our products.
B)Our project should be completed in no more than 180 days and should cost no more than $150,000 and be completed 100% in-house.
C)Our project should increase sales in the Dayton market by 15% next year to complete our company's Ohio expansion strategy.
D)Our project should utilize the Spiral Development approach to eliminate 95% of the major risks to our Dayton sales program.
E)Our project should produce an advertising campaign in Dayton that wins the Ohio Advertising Guild's Award for most creative campaign.
Question
The project charter is a key deliverable from ________ and addresses,along with other questions,________:

A)phase 1,How long will this project take
B)phase 1,Who is the project sponsor?
C)phase 5,What scope controls will be used?
D)phase 2,How much will the project cost?
E)phase 3,A detailed risk plan.
Question
_____ focuses on carrying out the project plan to deliver the IT product and managing the project to achieve the goal.

A)Conceptualize and initialize the project Phase 1)
B)Develop the project charter and plan Phase 2)
C)Execute and control Phase 3)
D)Close project Phase 4)
E)Evaluate project success Phase 5)
Question
The _____ infrastructure supports the project in terms of the environment and team itself.

A)organizational
B)project
C)technical
D)process
E)control
Question
The _____ infrastructure supports and manages the project within the organization.

A)organizational
B)project
C)technical
D)process
E)control
Question
The IT project management foundation includes all of the following except:

A)PM processes
B)PM objectives
C)PM methodologies
D)PM tools
E)PMBOK knowledge areas
Question
The _________ gives authority to the project manager to begin carrying out the processes and tasks associated with the systems development life cycle .

A)business case
B)project sponsor
C)initiating process
D)implementation plan
E)project charter
Question
The _____ infrastructure provides the hardware and software tools to support the project team.

A)organizational
B)project
C)technical
D)process
E)control
Question
The first stage of the IT project methodology focuses on:

A)choosing the project team members.
B)defining the overall goal of the project.
C)conceptualizing alternative approaches to project development.
D)identifying the project's scope.
E)identifying project managers and sponsors.
Question
All of the following are steps in developing the project MOV except:

A)Identify the available organizational resources.
B)Identify the desired value of the IT project.
C)Develop an appropriate metric.
D)Set a time frame for achieving MOV.
E)Verify and get agreement from project stakeholders.
Question
The business case is the key deliverable for:

A)phase 1.
B)phase 2.
C)phase 3.
D)phase 4.
E)phase 5.
Question
_____ provides all the tactical details concerning who will carry out the work and when it will be accomplished.

A)Business case
B)Strategic plan
C)Initiating process
D)Project plan
E)project charter
Question
Scope and schedule are examples of:

A)Project Management processes.
B)Project Management tools.
C)PMBOK areas of knowledge
D)Project Management objectives
E)Project Management infrastructure.
Question
Which of the following was NOT given as a reason for recruiting a core team to develop the business case?

A)enhanced credibility
B)alignment with organizational goals
C)access to real costs
D)early identification of project team.
E)shared sense of ownership
Question
A project that increased market share would impact the _____area of an organization.

A)strategic
B)customer
C)financial
D)operational
E)social
Question
The overall goal and measure of project success is:

A)the project's MOV.
B)the project's NPV.
C)the project's technical competency.
D)the project's adherence to budget and schedule.
E)the project's end-user acceptance.
Question
Trying to decide between three alternatives,a company employed a scoring model.Three criteria were chosen.Criteria A was believed to be the most important and so was given a weight of 50%.The other two were deemed to be equal to each other in importance.A relative scoring range of 0 to 10 was used.The table below shows each alternative and their scores.Which alternative should the company choose?
 Criteria  Alternative A  Alternative B  Alternative C  A 567 B 877 C 885\begin{array}{ccll}\underline{\text { Criteria }} & \underline{\text { Alternative A }} & \underline{\text { Alternative B }} & \underline{\text { Alternative C }} \\\text { A } & 5 & 6 & 7 \\\text { B } & 8 & 7 & 7 \\\text { C } & 8 & 8 & 5\end{array}

A)Choose alternative A
B)Choose alternative B
C)Choose alternative C
D)Choose either alternative A or B
E)Choose either alternative A or C
Question
Describe the five phases of the IT project methodology.
Question
Calculate the ROI for a project with total expected costs of $40,000 and total expected benefits of 35,000.

A)-12.5%
B)12.5%
C)1)875%
D)187.5%
E)-18.75%
Question
A project that provided customers better products and services would impact the _____area of an organization.

A)strategic
B)customer
C)financial
D)operational
E)social
Question
Determining whether the proposed solution will work within the software architecture is a measure of _____.

A)organizational feasibility
B)technical feasibility
C)economic feasibility
D)legal feasibility
E)ethical feasibility
Question
Which of the following is a perspective from the Balanced Scorecard Approach?:

A)Financial Perspective
B)Internal Processes Perspective
C)Innovation & Learning Perspective
D)Customer Perspective
E)Organizational Value Perspective
Question
What are the advantages of having and following a project methodology?
Question
A company utilizes the payback method exclusively to select projects.Which of the following mutually exclusive they can only do one of them)projects will they choose? Assume cash flows occur in equal monthly installments)

A)Initial Investment: $10,000 Net Cash Flows: year 1:$0 year 2:$120,000 year 3:$60,000 each year thereafter:$60,000
B)Initial Investment:$100,000 Net Cash Flows: year 1:$50,000 year 2:$50,000 year 3:$100,000 each year thereafter:$1,000,000
C)Initial Investment:$10,000 Net Cash Flows: year 1:0 year 2:$100,000 year 3:$100,000 each year thereafter:$100,000
D)Initial Investment:$100,000 Net Cash Flows: year 1:$1,000,000 year 2:$2,000,000 year 3:$2,000,000 each year thereafter:0
E)Initial Investment:$10,000 Net Cash Flows: year 1:$8,000 year 2:$12,000 year 3:$120,000 each year thereafter:$120,000
Question
A project that increased profits would impact the _____area of an organization.

A)strategic
B)customer
C)financial
D)operational
E)social
Question
Determining whether employees will be able to adapt to the planned change is _____.

A)organizational feasibility
B)technical feasibility
C)economic feasibility
D)legal feasibility
E)ethical feasibility
Question
Discuss how the project management knowledge areas support the IT project methodology.
Question
Evaluating the feasibility of an alternative in terms of the funds and resources available to support a project for the organization is a measure of _____.

A)organizational feasibility
B)technical feasibility
C)economic feasibility
D)legal feasibility
E)ethical feasibility
Question
Evaluating the feasibility of an alternative in terms of the funds and resources available to support a project for the organization is a measure of _____.

A)organizational feasibility
B)technical feasibility
C)economic feasibility
D)legal feasibility
E)ethical feasibility
Question
Describe the five project management processes.
Question
Calculate the Net Present Value for a project with the following cash flows: Year 0: $5,000)Year 1: $10,000 Year 2: $10,000 Year3: $2,000).The discount rate is 5%.

A)$19,209.75
B)$14,209.75
C)$18,840.25
D)$23,840.25
E)$12,350.00
Question
What is a project charter?
Question
What is a project infrastructure?
Question
A project that improved operational effectiveness would impact the _____area of an organization.

A)strategic
B)customer
C)financial
D)operational
E)social
Question
How many widgets would a company have to sell if their initial investment was $60,000 and widgets sold for $25? Materials to produce 100 widgets cost $1000.Direct labor costs $2.50 per widget.Total indirect costs & overhead is 10% of the selling price.

A)4,800
B)6,000
C)8,000
D)8,142
E)Not enough information to calculate.
Question
A project that provided cleaner air would impact the _____area of an organization.

A)strategic
B)customer
C)financial
D)operational
E)social
Question
What is a business case?
Question
Describe how a project's MOV can support an organization's goals and strategies.
Question
What is Total Cost of Ownership?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/63
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 2: Initializing and Conceptualizing the IT Project
1
A methodology provides a strategic-level plan for managing and controlling IT projects.
True
2
Feasibility focuses on what can go wrong and what must go right.
False
3
The primary focus of "the conceptualize and initialize phase" is to determine the overall goal of the project.
True
4
An Information Technology Project Methodology ITPM )

A)is an alternative metric for deciding between competing projects.
B)is a six-phase program described by PMBOK and offered as a generally accepted industry practice.
C)is specified by parameters of the business case.
D)is a set of deliverables derived from the various PLC phases.
E)is a strategic-level plan for managing and controlling IT projects.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
5
Scoring models are useful because they allow for the inclusion of qualitative factors.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
6
The MOV should be adjusted at each phase of a project to align with the realities of project execution.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
7
All cash flows over the useful life of a project alternative must be included in the payback method of analysis.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
8
The SDLC systems development life cycle)is a deliverable from the project charter.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
9
The MOV should explicitly state the technology that will support the IT project.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
10
A scoring model can combine both qualitative items based reflected in the weights and scores that are based on people's judgments.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
11
Feasibility focuses on whether a particular alternative is doable and worth doing.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
12
The total cost of ownership TCO)includes only the direct or up-front costs and ongoing expenditures.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
13
The project charter is a key deliverable for the second phase of the IT project methodology.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
14
The total benefits of ownership TBO)should address the benefits of an alternative over its useful life.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
15
A business case is a deliverable that documents the project's goal,as well as several alternatives or options.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
16
Project Management processes include Scope,Schedule,Budget,and Quality.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
17
For the sake of efficiency and unity of purpose and direction,it is usually advisable to have the project manager take sole responsibility for developing the business case.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
18
In general,riskier project alternatives will have a lower breakeven point than less risky project alternatives.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
19
The net present value method of project valuation takes into account all relevant cash flows as well as the company's required rate of return.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
20
A significant deficiency of the payback method of analyzing alternatives is the failure to account for the time value of money.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
21
Planning,executing,and controlling are examples of:

A)Project Management process groups.
B)Project Management tools.
C)PMBOK areas of knowledge
D)Project Management objectives
E)Project Management infrastructure.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
22
Which of the following statements is the best indicator that the new software project was successful.

A)The project's product,a software system,was enthusiastically accepted by 100% of the end users who were able to begin using it after completing only a one-day training session.
B)The project's product,a software system,was a week late and 2% over budget,but six months later was found to have met the company's goal of reducing service callbacks by 15%.
C)The project's product,a software system,was completed two weeks ahead of time freeing up the entire development team to begin work on other projects.
D)The project's product,a software system,was completed right on schedule and was delivered $10,000 under the $100,000 budget allocation.
E)The project's product,a software system,was completed on time and on budget and was tested and shown to be 100% bug-free.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
23
Which of the following statements about the business case is NOT :

A)A business case provides an analysis of feasibility
B)A business case provides senior management with sufficient information to fund a project.
C)A business case provides details of possible impacts,costs and benefits.
D)A business case provides a project budget.
E)A business case may be a large,formal document.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
24
Verification of all project deliverables occurs during ___.

A)Conceptualize and initialize the project Phase 1)
B)Develop the project charter and plan Phase 2)
C)Execute and control Phase 3)
D)Close project Phase 4)
E)Evaluate project success Phase 5)
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following is the best MOV statement?

A)Our project should make Dayton customers flock to the stores in droves to buy our products.
B)Our project should be completed in no more than 180 days and should cost no more than $150,000 and be completed 100% in-house.
C)Our project should increase sales in the Dayton market by 15% next year to complete our company's Ohio expansion strategy.
D)Our project should utilize the Spiral Development approach to eliminate 95% of the major risks to our Dayton sales program.
E)Our project should produce an advertising campaign in Dayton that wins the Ohio Advertising Guild's Award for most creative campaign.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
26
The project charter is a key deliverable from ________ and addresses,along with other questions,________:

A)phase 1,How long will this project take
B)phase 1,Who is the project sponsor?
C)phase 5,What scope controls will be used?
D)phase 2,How much will the project cost?
E)phase 3,A detailed risk plan.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
27
_____ focuses on carrying out the project plan to deliver the IT product and managing the project to achieve the goal.

A)Conceptualize and initialize the project Phase 1)
B)Develop the project charter and plan Phase 2)
C)Execute and control Phase 3)
D)Close project Phase 4)
E)Evaluate project success Phase 5)
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
28
The _____ infrastructure supports the project in terms of the environment and team itself.

A)organizational
B)project
C)technical
D)process
E)control
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
29
The _____ infrastructure supports and manages the project within the organization.

A)organizational
B)project
C)technical
D)process
E)control
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
30
The IT project management foundation includes all of the following except:

A)PM processes
B)PM objectives
C)PM methodologies
D)PM tools
E)PMBOK knowledge areas
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
31
The _________ gives authority to the project manager to begin carrying out the processes and tasks associated with the systems development life cycle .

A)business case
B)project sponsor
C)initiating process
D)implementation plan
E)project charter
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
32
The _____ infrastructure provides the hardware and software tools to support the project team.

A)organizational
B)project
C)technical
D)process
E)control
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
33
The first stage of the IT project methodology focuses on:

A)choosing the project team members.
B)defining the overall goal of the project.
C)conceptualizing alternative approaches to project development.
D)identifying the project's scope.
E)identifying project managers and sponsors.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
34
All of the following are steps in developing the project MOV except:

A)Identify the available organizational resources.
B)Identify the desired value of the IT project.
C)Develop an appropriate metric.
D)Set a time frame for achieving MOV.
E)Verify and get agreement from project stakeholders.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
35
The business case is the key deliverable for:

A)phase 1.
B)phase 2.
C)phase 3.
D)phase 4.
E)phase 5.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
36
_____ provides all the tactical details concerning who will carry out the work and when it will be accomplished.

A)Business case
B)Strategic plan
C)Initiating process
D)Project plan
E)project charter
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
37
Scope and schedule are examples of:

A)Project Management processes.
B)Project Management tools.
C)PMBOK areas of knowledge
D)Project Management objectives
E)Project Management infrastructure.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
38
Which of the following was NOT given as a reason for recruiting a core team to develop the business case?

A)enhanced credibility
B)alignment with organizational goals
C)access to real costs
D)early identification of project team.
E)shared sense of ownership
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
39
A project that increased market share would impact the _____area of an organization.

A)strategic
B)customer
C)financial
D)operational
E)social
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
40
The overall goal and measure of project success is:

A)the project's MOV.
B)the project's NPV.
C)the project's technical competency.
D)the project's adherence to budget and schedule.
E)the project's end-user acceptance.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
41
Trying to decide between three alternatives,a company employed a scoring model.Three criteria were chosen.Criteria A was believed to be the most important and so was given a weight of 50%.The other two were deemed to be equal to each other in importance.A relative scoring range of 0 to 10 was used.The table below shows each alternative and their scores.Which alternative should the company choose?
 Criteria  Alternative A  Alternative B  Alternative C  A 567 B 877 C 885\begin{array}{ccll}\underline{\text { Criteria }} & \underline{\text { Alternative A }} & \underline{\text { Alternative B }} & \underline{\text { Alternative C }} \\\text { A } & 5 & 6 & 7 \\\text { B } & 8 & 7 & 7 \\\text { C } & 8 & 8 & 5\end{array}

A)Choose alternative A
B)Choose alternative B
C)Choose alternative C
D)Choose either alternative A or B
E)Choose either alternative A or C
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
42
Describe the five phases of the IT project methodology.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
43
Calculate the ROI for a project with total expected costs of $40,000 and total expected benefits of 35,000.

A)-12.5%
B)12.5%
C)1)875%
D)187.5%
E)-18.75%
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
44
A project that provided customers better products and services would impact the _____area of an organization.

A)strategic
B)customer
C)financial
D)operational
E)social
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
45
Determining whether the proposed solution will work within the software architecture is a measure of _____.

A)organizational feasibility
B)technical feasibility
C)economic feasibility
D)legal feasibility
E)ethical feasibility
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
46
Which of the following is a perspective from the Balanced Scorecard Approach?:

A)Financial Perspective
B)Internal Processes Perspective
C)Innovation & Learning Perspective
D)Customer Perspective
E)Organizational Value Perspective
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
47
What are the advantages of having and following a project methodology?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
48
A company utilizes the payback method exclusively to select projects.Which of the following mutually exclusive they can only do one of them)projects will they choose? Assume cash flows occur in equal monthly installments)

A)Initial Investment: $10,000 Net Cash Flows: year 1:$0 year 2:$120,000 year 3:$60,000 each year thereafter:$60,000
B)Initial Investment:$100,000 Net Cash Flows: year 1:$50,000 year 2:$50,000 year 3:$100,000 each year thereafter:$1,000,000
C)Initial Investment:$10,000 Net Cash Flows: year 1:0 year 2:$100,000 year 3:$100,000 each year thereafter:$100,000
D)Initial Investment:$100,000 Net Cash Flows: year 1:$1,000,000 year 2:$2,000,000 year 3:$2,000,000 each year thereafter:0
E)Initial Investment:$10,000 Net Cash Flows: year 1:$8,000 year 2:$12,000 year 3:$120,000 each year thereafter:$120,000
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
49
A project that increased profits would impact the _____area of an organization.

A)strategic
B)customer
C)financial
D)operational
E)social
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
50
Determining whether employees will be able to adapt to the planned change is _____.

A)organizational feasibility
B)technical feasibility
C)economic feasibility
D)legal feasibility
E)ethical feasibility
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
51
Discuss how the project management knowledge areas support the IT project methodology.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
52
Evaluating the feasibility of an alternative in terms of the funds and resources available to support a project for the organization is a measure of _____.

A)organizational feasibility
B)technical feasibility
C)economic feasibility
D)legal feasibility
E)ethical feasibility
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
53
Evaluating the feasibility of an alternative in terms of the funds and resources available to support a project for the organization is a measure of _____.

A)organizational feasibility
B)technical feasibility
C)economic feasibility
D)legal feasibility
E)ethical feasibility
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
54
Describe the five project management processes.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
55
Calculate the Net Present Value for a project with the following cash flows: Year 0: $5,000)Year 1: $10,000 Year 2: $10,000 Year3: $2,000).The discount rate is 5%.

A)$19,209.75
B)$14,209.75
C)$18,840.25
D)$23,840.25
E)$12,350.00
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
56
What is a project charter?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
57
What is a project infrastructure?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
58
A project that improved operational effectiveness would impact the _____area of an organization.

A)strategic
B)customer
C)financial
D)operational
E)social
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
59
How many widgets would a company have to sell if their initial investment was $60,000 and widgets sold for $25? Materials to produce 100 widgets cost $1000.Direct labor costs $2.50 per widget.Total indirect costs & overhead is 10% of the selling price.

A)4,800
B)6,000
C)8,000
D)8,142
E)Not enough information to calculate.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
60
A project that provided cleaner air would impact the _____area of an organization.

A)strategic
B)customer
C)financial
D)operational
E)social
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
61
What is a business case?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
62
Describe how a project's MOV can support an organization's goals and strategies.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
63
What is Total Cost of Ownership?
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 63 flashcards in this deck.