Deck 29: Controlling Manufacturing Costs: Standard Costs
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/89
Play
Full screen (f)
Deck 29: Controlling Manufacturing Costs: Standard Costs
1
Semi-variable costs are sometimes called mixed costs.
True
2
The controllable overhead variance compares the actual overhead costs incurred with what the costs should have been for the units produced.
True
3
The purchasing department can determine the standard quantity per unit of each type of raw material required to manufacture a product.
False
4
If a price variance for materials is unfavorable, the quantity variance for materials also must be unfavorable.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
5
Direct materials and direct labor are examples of costs that tend to vary directly with the volume of output.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
6
A price variance for an item is the difference between its actual price and its standard price multiplied by the standard quantity.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
7
As the volume of output decreases, the fixed cost per unit of output increases.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
8
The cost per unit of direct materials changes as output changes.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
9
Standard costs reflect what costs should be for the units of product manufactured during the period under the normal efficient operating conditions.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
10
A flexible budget shows budgeted costs at several different levels of activity.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
11
The high-low point method results can be misleading if the months used are the highest and lowest production levels of the year.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
12
In order to analyze the differences between actual costs and standard costs, it is necessary to identify the fixed and variable components of semi-variable costs.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
13
A budget performance report compares actual costs for a period with the budgeted costs for that period.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
14
A key purpose of a manufacturing cost budget is to provide a basis for measuring performance.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
15
If the standard cost for an item exceeds the actual cost, the variance is favorable.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
16
Usually, a well-run manufacturing company prepares only annual manufacturing cost budgets.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
17
The setting of standard wage rates is usually a function of the personnel department.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
18
A fixed budget includes only fixed manufacturing costs.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
19
If the predetermined overhead application rate is a percentage of labor cost, then a favorable labor time variance will be accompanied by a favorable manufacturing overhead variance.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
20
Semi-variable costs vary in direct proportion to the volume of activity.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
21
Costs that reflect what costs should be for the units of product manufactured during the period under normal efficient operating conditions are called ____________________ costs.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
22
Costs that do not vary in total during a period even though the volume of manufacturing activity changes are called ____________________ costs.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
23
The labor time (efficiency) variance and the labor ____________________ variance together make up the total labor variance.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
24
As the volume of output increases, the ____________________ cost per unit of output decreases.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
25
Costs that vary in some degree with the volume of activity, but not in direct proportion to it are called ____________________ costs.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
26
The difference between the actual cost of an item and its standard cost is called a(n) ___________________.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
27
Costs that tend to change in total directly with the volume of manufacturing activity are called ____________________ costs.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
28
A budget that shows expected costs at only one level of production activity is called a(n) ____________________ budget.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
29
Which of the following costs are generally semi-variable?
A) clerical salaries
B) depreciation
C) repairs and maintenance
D) property taxes
A) clerical salaries
B) depreciation
C) repairs and maintenance
D) property taxes
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
30
If the actual cost of an item is lower than the standard cost, a(n) ____________________ price variance will be recognized.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
31
Use the high-low point method to determine total fixed cost:
A) $20,000.
B) $28,000.
C) $16,000.
D) $24,000.
A) $20,000.
B) $28,000.
C) $16,000.
D) $24,000.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
32
The ____________________ cost per unit does not change as output changes.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
33
A simple method used to analyze the fixed and variable components in semivariable costs is called the ____________________ point method.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
34
A budget that shows expected costs at more than one level of activity is called a(n) ____________________ budget.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
35
The range of activity at which the factory is likely to operate is referred to as the ____________________ range of activity.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
36
Use the high-low point method to determine variable cost per unit:
A) $0.60 per unit.
B) $0.80 per unit.
C) $1.00 per unit.
D) $1.20 per unit.
A) $0.60 per unit.
B) $0.80 per unit.
C) $1.00 per unit.
D) $1.20 per unit.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
37
The quantity variance for an item is the difference between its actual quantity and its standard quantity, multiplied by the ____________________ cost of the item.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
38
Deducting the total variable cost from the total cost results in
A) overhead.
B) fixed cost.
C) manufacturing cost.
D) semivariable cost.
A) overhead.
B) fixed cost.
C) manufacturing cost.
D) semivariable cost.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
39
The price variance for an item is the difference between its actual price and its standard price, multiplied by the ____________________ quantity.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
40
To separate the semi-variable costs into their fixed and variable components, one can use which of the following methods?
A) labor variance method
B) material variance method
C) relevant range of activity method
D) high-low point method
A) labor variance method
B) material variance method
C) relevant range of activity method
D) high-low point method
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
41
The quantity variance for an item is the difference between its actual quantity and its standard quantity multiplied by
A) the standard cost of the item.
B) the actual cost of the item.
C) the price variance.
D) the budgeted amount for the item.
A) the standard cost of the item.
B) the actual cost of the item.
C) the price variance.
D) the budgeted amount for the item.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
42
The materials price variance for an item is the difference between its actual price and its standard cost
A) multiplied by the actual quantity used.
B) multiplied by the standard quantity allowed.
C) multiplied by the difference between the actual quantity and the standard quantity.
D) divided by the actual quantity.
A) multiplied by the actual quantity used.
B) multiplied by the standard quantity allowed.
C) multiplied by the difference between the actual quantity and the standard quantity.
D) divided by the actual quantity.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
43
As the level of activity increases, the variable cost per unit of activity
A) increases.
B) decreases.
C) does not change.
D) may increase or decrease.
A) increases.
B) decreases.
C) does not change.
D) may increase or decrease.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
44
In a factory, the total variable costs are $600 if 500 units are produced. If 400 units are produced, the total variable costs would be
A) $480.
B) $600.
C) $120.
D) $333. (600/500) x 400.
A) $480.
B) $600.
C) $120.
D) $333. (600/500) x 400.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
45
The salary of the factory supervisor is a good example of
A) a variable cost.
B) a fixed cost.
C) a semi-variable cost.
D) a standard cost.
A) a variable cost.
B) a fixed cost.
C) a semi-variable cost.
D) a standard cost.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
46
Use the high-low point method to determine total costs if 16,000 units are produced.
A) $20,000
B) $22,800
C) $30,000
D) $32,800
A) $20,000
B) $22,800
C) $30,000
D) $32,800
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
47
In a factory, the fixed costs are $6,000 when 600 units are produced. If 900 units are produced, the fixed costs per unit would be
A) $10.00.
B) $9.00.
C) $7.50.
D) $6.67. 6,000/900.
A) $10.00.
B) $9.00.
C) $7.50.
D) $6.67. 6,000/900.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
48
As the level of activity increases, the total fixed costs for the period
A) increase.
B) decrease.
C) may increase or decrease.
D) do not change.
A) increase.
B) decrease.
C) may increase or decrease.
D) do not change.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
49
In a factory, the fixed costs per unit are $45 when 400 units are produced. If 450 units are produced, the fixed costs per unit would be
A) $45.00.
B) $40.00.
C) $10.00.
D) $50.63. (45 x 400)/450.
A) $45.00.
B) $40.00.
C) $10.00.
D) $50.63. (45 x 400)/450.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
50
In a factory, the total variable costs are $600 if 500 units are produced. If 800 units are produced, the variable cost per unit would be
A) $1.20
B) $1.11
C) $1.00
D) $0.75 600/500.
A) $1.20
B) $1.11
C) $1.00
D) $0.75 600/500.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
51
As the level of activity increases, the total variable costs for the period
A) increase.
B) decrease.
C) do not change.
D) may increase or decrease.
A) increase.
B) decrease.
C) do not change.
D) may increase or decrease.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
52
A fixed budget is a meaningful way to evaluate manufacturing performance if the activity level used for the budget is
A) similar to actual.
B) less than actual.
C) more than actual.
D) a reasonable/logical activity measure.
A) similar to actual.
B) less than actual.
C) more than actual.
D) a reasonable/logical activity measure.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
53
The labor standard for a product was five hours at a wage rate of $8 per hour. The firm produced 900 units of the item. Labor costs totaled $35,250 and 4,700 hours of labor were used. An analysis of labor costs would indicate
A) a $750 favorable labor time variance.
B) a $1,600 unfavorable labor time variance.
C) a $750 unfavorable labor rate variance.
D) a $1,600 favorable labor rate variance.
A) a $750 favorable labor time variance.
B) a $1,600 unfavorable labor time variance.
C) a $750 unfavorable labor rate variance.
D) a $1,600 favorable labor rate variance.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
54
Costs that reflect what costs should be for the units of product manufactured during the period under normal efficient operating conditions are known as
A) variable costs.
B) fixed costs.
C) standard costs.
D) semi-variable costs.
A) variable costs.
B) fixed costs.
C) standard costs.
D) semi-variable costs.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
55
An unfavorable price variance for materials means that
A) the actual cost of the materials was more than the budgeted amount.
B) more materials were used in production than anticipated.
C) more labor hours were required to work with the materials than expected.
D) the actual cost of the materials was more than the standard cost.
A) the actual cost of the materials was more than the budgeted amount.
B) more materials were used in production than anticipated.
C) more labor hours were required to work with the materials than expected.
D) the actual cost of the materials was more than the standard cost.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
56
A budget prepared using several differing levels of activity is a
A) fixed budget.
B) flexible budget.
C) manufacturing cost budget.
D) budget performance report.
A) fixed budget.
B) flexible budget.
C) manufacturing cost budget.
D) budget performance report.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
57
As the level of activity increases, the fixed cost per unit of activity
A) increases.
B) decreases.
C) does not change.
D) may increase or decrease.
A) increases.
B) decreases.
C) does not change.
D) may increase or decrease.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
58
The cost of utilities consumed in the factory is a good example of
A) a variable cost.
B) a fixed cost.
C) a semi-variable cost.
D) a standard cost.
A) a variable cost.
B) a fixed cost.
C) a semi-variable cost.
D) a standard cost.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
59
The standard quantity of materials for a product was 40 pounds per unit at the standard price of $2.00 per pound. The actual price per pound of materials was $1.50, and the actual quantity used was 44 pounds. An analysis would indicate
A) a $20.00 favorable price variance.
B) a $22.00 favorable price variance.
C) a $6.00 unfavorable quantity variance.
D) a $18.00 favorable price variance. (1.50 - 2.00) x 44 = 22.00 favorable.
A) a $20.00 favorable price variance.
B) a $22.00 favorable price variance.
C) a $6.00 unfavorable quantity variance.
D) a $18.00 favorable price variance. (1.50 - 2.00) x 44 = 22.00 favorable.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
60
Direct factory labor is usually considered to be
A) a variable cost.
B) a fixed cost.
C) a semi-variable cost.
D) a mixed cost.
A) a variable cost.
B) a fixed cost.
C) a semi-variable cost.
D) a mixed cost.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
61
Determine the cost behavior for each of the following items as Fixed (F), Variable (V), or Semi-variable (S). 

Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
62
Prepare a budget for manufacturing costs for Anasta Manufacturing for the month of April 2013 from the following information. Direct materials are estimated to be $600,000 for the year and direct labor is estimated to be $108,000. The direct labor per hour average is $16 and the budgeted level of direct labor activity for the month is 1,100 hours. 

Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
63
Efficiency and cost control can be evaluated by comparing actual overhead costs with the budget for the actual level of operations with the
A) flexible budget.
B) fixed budget.
C) budget performance report.
D) manufacturing cost budget.
A) flexible budget.
B) fixed budget.
C) budget performance report.
D) manufacturing cost budget.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
64
The standard quantity of materials for a product was 40 pounds per unit at the standard price of $2.00 per pound. The actual price per pound of materials was $1.50, and the actual quantity used was 44 pounds. An analysis would indicate
A) a $20.00 favorable price variance.
B) a $8.00 favorable quantity variance.
C) a $6.00 unfavorable quantity variance.
D) a $8.00 unfavorable quantity variance. (44 - 40) x 2.00 = 8 unfavorable.
A) a $20.00 favorable price variance.
B) a $8.00 favorable quantity variance.
C) a $6.00 unfavorable quantity variance.
D) a $8.00 unfavorable quantity variance. (44 - 40) x 2.00 = 8 unfavorable.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
65
The company's accountant developed the data given below for Product X for the year 2013. Use this information to compute the answers to the questions that follow.
1. What is the standard cost per unit of product for materials?
2. What is the standard cost per unit of product for labor?
3. What is the standard cost per unit of product for overhead?
4. What is the total standard cost per unit of product?

2. What is the standard cost per unit of product for labor?
3. What is the standard cost per unit of product for overhead?
4. What is the total standard cost per unit of product?
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
66
Kenwood Company's manufacturing overhead costs for the assembly department are given below. 
Using the information provided, prepare a flexible budget for the department for the month of May 2013, assuming that the expected production is for 2,000 direct labor hours. The flexible budget should show costs for production levels of 90 percent and 110 percent of the expected production level of 2,000 hours.

Using the information provided, prepare a flexible budget for the department for the month of May 2013, assuming that the expected production is for 2,000 direct labor hours. The flexible budget should show costs for production levels of 90 percent and 110 percent of the expected production level of 2,000 hours.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
67
Standard quantity is usually determined by the
A) purchasing department.
B) engineers.
C) company accountant.
D) shop foreman.
A) purchasing department.
B) engineers.
C) company accountant.
D) shop foreman.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
68
One element that is NOT part of the standard cost is
A) shipping.
B) labor.
C) materials.
D) machine maintenance.
A) shipping.
B) labor.
C) materials.
D) machine maintenance.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
69
Vista Company's records show the following information for the first six months of 2013.
1. What are the variable costs per hour using the high-low point method?
2. What are the fixed costs per month using the high-low point method?

2. What are the fixed costs per month using the high-low point method?
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
70
Kenwood Company's manufacturing overhead costs for the assembly department are given below. 
Using the information provided prepare a departmental monthly overhead performance report comparing actual costs with the budget allowance for the number of hours worked. Assume that during the month of May actual production was 1,900 hours. Actual costs for the month were as follows:

Using the information provided prepare a departmental monthly overhead performance report comparing actual costs with the budget allowance for the number of hours worked. Assume that during the month of May actual production was 1,900 hours. Actual costs for the month were as follows:

Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
71
Complete the flexible budget of manufacturing costs for Lansome Industries for September 2013. Overhead is based on direct labor hours. 

Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
72
The difference between the total standard cost and the total actual cost is the
A) standard cost card amount.
B) labor rate variance.
C) materials price variance.
D) cost variance.
A) standard cost card amount.
B) labor rate variance.
C) materials price variance.
D) cost variance.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
73
An analysis would indicate
A) a $5,000 unfavorable materials quantity variance
B) a $7,600 favorable materials quantity variance.
C) a $2,600 favorable materials quantity variance.
D) a $7,600 unfavorable materials quantity variance. (actual quantity - standard quantity) x standard price = (13,000 - (4,000 x 3)) x 5 = 5,000 unfavorable.
A) a $5,000 unfavorable materials quantity variance
B) a $7,600 favorable materials quantity variance.
C) a $2,600 favorable materials quantity variance.
D) a $7,600 unfavorable materials quantity variance. (actual quantity - standard quantity) x standard price = (13,000 - (4,000 x 3)) x 5 = 5,000 unfavorable.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
74
Prepare a budget for manufacturing costs for Nacelle Manufacturing for the month of July 2013 from the following information. Direct materials are estimated to be $480,000 for the year and direct labor is estimated to be $96,000. The direct labor per hour average is $13 and the budgeted level of activity for the month is 1,200 hours. 

Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
75
The three classifications for manufacturing costs are fixed, variable, and semivariable. Explain what each is and how they relate to production.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
76
An analysis would indicate
A) a $900 unfavorable labor efficiency variance.
B) a $900 favorable labor efficiency variance.
C) a $4,800 unfavorable labor efficiency variance.
D) a $4,800 favorable labor efficiency variance. (actual hours - standard hours) x standard rate
= (3,600 - 4,000) x 12 = 4,800 favorable.
A) a $900 unfavorable labor efficiency variance.
B) a $900 favorable labor efficiency variance.
C) a $4,800 unfavorable labor efficiency variance.
D) a $4,800 favorable labor efficiency variance. (actual hours - standard hours) x standard rate
= (3,600 - 4,000) x 12 = 4,800 favorable.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
77
An analysis would indicate
A) a $900 unfavorable labor rate variance.
B) a $900 favorable labor rate variance.
C) a $4,800 unfavorable labor rate variance.
D) a $4,80 favorable labor rate variance. (actual rate - standard rate) x actual hours= (11.75 - 12) x 3,600 = 900 favorable.
A) a $900 unfavorable labor rate variance.
B) a $900 favorable labor rate variance.
C) a $4,800 unfavorable labor rate variance.
D) a $4,80 favorable labor rate variance. (actual rate - standard rate) x actual hours= (11.75 - 12) x 3,600 = 900 favorable.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
78
The standard costs for a unit of product are shown below.
During June, Job N-5 for 100 units was completed. The actual costs of the job are shown below.
1. What is the total cost variance between actual cost and standard cost?
2. What is the total material variance?
3. What is the material quantity variance?
4. What is the material price variance?


2. What is the total material variance?
3. What is the material quantity variance?
4. What is the material price variance?
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
79
The standard costs for a unit of product are shown below.
During July, Job N-5 for 200 units was completed. The actual costs of the job are shown below.
1. What is the total cost variance between actual cost and standard cost?
2. What is the total material variance?
3. What is the material quantity variance?
4. What is the material price variance?


2. What is the total material variance?
3. What is the material quantity variance?
4. What is the material price variance?
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
80
The flexible budget usually shows
A) only fixed costs.
B) only variable costs.
C) fixed and variable costs together.
D) fixed and variable costs separately.
A) only fixed costs.
B) only variable costs.
C) fixed and variable costs together.
D) fixed and variable costs separately.