Deck 8: Project Management

Full screen (f)
exit full mode
Question
The critical path is the longest path through the project network.
Use Space or
up arrow
down arrow
to flip the card.
Question
Estimating project funds is an element of project planning.
Question
In PERT, the expected project completion time is assumed to be distributed according to a beta distribution.
Question
An element of project planning is to compare the project schedule objectives.
Question
In PERT, the project variance is the sum of the variance of all project activities.
Question
A work breakdown structure breaks down a project into subcomponents, components, activities, and tasks.
Question
Slack is the amount of time an activity can be delayed without delaying the project.
Question
In PERT, three time estimates (optimistic, most likely, and pessimistic) provide an estimate of the mean and variance for each activity, based on the normal distribution.
Question
One aspect of project control is team building.
Question
Project crashing is a method for shortening the project completion time by reducing the completion time of one or more critical activities at a cost.
Question
Project teams are made up of individuals from various areas and departments within a company.
Question
A statement of work is a written description of the goals, work, and time frame of a project.
Question
Making time estimates is an element of project planning.
Question
The critical path is the shortest path through the project network.
Question
The expected project completion time is assumed to be normally distributed.
Question
Determining project completion time is an element of project planning.
Question
Establishing precedence relationships is an element of project planning.
Question
The sequence of activities in a project is depicted by the precedence relationships.
Question
Setting deadlines is an element of project planning.
Question
The critical path activities have no slack.
Question
The PERT pessimistic time estimate is an estimate of the minimum time an activity will require.
Question
In PERT, the actual project completion time will never exceed the expected duration of the critical path.
Question
In PERT, the path with the fewest activities is referred to as the critical path.
Question
The earliest finish time for the final activity on a project network is also the total completion of the project.
Question
Two concurrent activities in a project can be represented in an AOA network by starting and ending on the same node.
Question
Project ________ is a method for shortening the project completion time by reducing the completion time of one or more critical activities at a cost.
Question
Three time estimates (optimistic, most likely, and pessimistic) provide an estimate of the mean and variance for each activity, based on the ________ distribution.
Question
The early start for a non-critical activity is always equal to the earliest finish of the preceding activity.
Question
The standard deviation of project duration is the average of the standard deviation of all activities on the critical path.
Question
The early start for an activity on the critical path is always equal to the earliest finish of the preceding activity.
Question
Shortening the project's duration by deleting unnecessary activities is called crashing.
Question
The early start of an activity that has only one predecessor is equal to the early finish of that predecessor
Question
An AON network will never require dummy activities.
Question
The early finish for an activity on the critical path is equal to the latest finish of the preceding activity.
Question
When earliest finish is subtracted from latest finish, we obtain the slack value for the activity.
Question
An AOA network will never require dummy activities.
Question
Crashing cost is always higher than the normal cost.
Question
The early start of an activity that has more than one predecessor is the minimum of the earliest finishes of all predecessors.
Question
A work breakdown structure is a useful tool because it addresses the timing of individual work elements.
Question
The expected project completion time is assumed to be ________ distributed based on the central limit theorem.
Question
If the early start for activity A is equal to 23 months and the duration of activity A is equal to 5 months, what is the earliest finish for activity A?
Question
The critical path activities have no ________.
Question
Consider the following network.
Consider the following network.   The early start for activity 2 is ________.<div style=padding-top: 35px>
The early start for activity 2 is ________.
Question
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   What is the critical path for this project network?<div style=padding-top: 35px>
What is the critical path for this project network?
Question
________ is the amount of time an activity can be delayed without delaying the project.
Question
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   Determine the latest start for activity E.<div style=padding-top: 35px>
Determine the latest start for activity E.
Question
Consider the following network.
Consider the following network.   The latest start for activity 3 is ________.<div style=padding-top: 35px>
The latest start for activity 3 is ________.
Question
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   What is the estimated expected mean time (in weeks) for the project completion?<div style=padding-top: 35px>
What is the estimated expected mean time (in weeks) for the project completion?
Question
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   What are the estimated slack times (in weeks) for activities A-H?<div style=padding-top: 35px>
What are the estimated slack times (in weeks) for activities A-H?
Question
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   What are the estimated expected completion (mean) times (in weeks) for activities A-H?<div style=padding-top: 35px>
What are the estimated expected completion (mean) times (in weeks) for activities A-H?
Question
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   What is the estimated standard deviation (in weeks) for the critical path completion time?<div style=padding-top: 35px>
What is the estimated standard deviation (in weeks) for the critical path completion time?
Question
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   What are the estimated standard deviations (in weeks) in the times for activities A-H?<div style=padding-top: 35px>
What are the estimated standard deviations (in weeks) in the times for activities A-H?
Question
When applying linear programming models to project crashing, the objective is to minimize ________.
Question
When applying linear programming models to project planning, the objective is to minimize ________.
Question
A(n) ________ chart is a graph or a bar chart for each activity that shows the project schedule and the passage of time.
Question
If the earliest finish for activity C is equal to 10 months and its duration 3 months, what is its earliest start?
Question
A ________ breaks down a project into modules: subcomponents, components, activities, and tasks.
Question
When the earliest start time (ES) of an activity is subtracted from the latest start time (LS) of an activity, the value obtained is called ________.
Question
In an AOA network, a ________ activity is used to show a precedence relationship, but it does not represent passage of time.
Question
A ________ shows who in the organization is responsible for doing the work in a project.
Question
Once a project is underway, the project manager is responsible for the

A) people.
B) cost.
C) time.
D) all of the above
Question
Consider the following network.
Consider the following network.   Identify all paths in the network.<div style=padding-top: 35px>
Identify all paths in the network.
Question
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.     Determine which activities should be crashed to shorten the project by 3 days. What is the cost?<div style=padding-top: 35px>
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.     Determine which activities should be crashed to shorten the project by 3 days. What is the cost?<div style=padding-top: 35px>
Determine which activities should be crashed to shorten the project by 3 days. What is the cost?
Question
Assume that the variance for each activity in the network is equal to 1. Compute the probability that path A-B-E-F will be completed in 15 days.
Question
Given the following information for a project, identify the critical path and determine the total completion time of the project.
Given the following information for a project, identify the critical path and determine the total completion time of the project.  <div style=padding-top: 35px>
Question
How long will it take to complete the project?
Question
Consider the following network.
Consider the following network.   Identify the critical path.<div style=padding-top: 35px>
Identify the critical path.
Question
Within what amount of time (in weeks) is there a 99% probability that the critical path for this project will be completed?
Question
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   What is the probability that the critical path for this project will be completed within 75 weeks?<div style=padding-top: 35px>
What is the probability that the critical path for this project will be completed within 75 weeks?
Question
Given the following information for a project, draw the AON (Activity-On-Node) project network.
Given the following information for a project, draw the AON (Activity-On-Node) project network.  <div style=padding-top: 35px>
Question
Elements of project planning include

A) defining project objectives.
B) identifying activities to crash.
C) calculating expected times and standard deviations.
D) conducting a "lessons learned" session.
Question
Elements of project planning include

A) identifying time-cost tradeoffs.
B) determining the project critical path.
C) comparing project schedule objectives.
D) all of the above
Question
A work breakdown structure breaks down a project into

A) weeks.
B) areas.
C) arcs.
D) modules.
Question
Given the following information for a project, draw the AOA (Activity-On-Arrow) project network.
Given the following information for a project, draw the AOA (Activity-On-Arrow) project network.  <div style=padding-top: 35px>
Question
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.     Determine which activities should be crashed to shorten the project by 1 day.<div style=padding-top: 35px>
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.     Determine which activities should be crashed to shorten the project by 1 day.<div style=padding-top: 35px>
Determine which activities should be crashed to shorten the project by 1 day.
Question
If an activity cannot be delayed without affecting the entire project, then it is a ________ activity.

A) completed
B) critical
C) crashed
D) normal
Question
Given the following information for a project, what are the estimated slack times (in weeks) for activities A-H?
Given the following information for a project, what are the estimated slack times (in weeks) for activities A-H?   CP = Critical Path<div style=padding-top: 35px>
CP = Critical Path
Question
Within what amount of time (in weeks) is there a 90% probability that the critical path for this project will be completed?
Question
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.     Determine which activities should be crashed to shorten the project by 2 days.<div style=padding-top: 35px>
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.     Determine which activities should be crashed to shorten the project by 2 days.<div style=padding-top: 35px>
Determine which activities should be crashed to shorten the project by 2 days.
Question
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   What is the probability that the critical path for this project will be completed within 80 weeks?<div style=padding-top: 35px>
What is the probability that the critical path for this project will be completed within 80 weeks?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/116
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 8: Project Management
1
The critical path is the longest path through the project network.
True
2
Estimating project funds is an element of project planning.
False
3
In PERT, the expected project completion time is assumed to be distributed according to a beta distribution.
False
4
An element of project planning is to compare the project schedule objectives.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
5
In PERT, the project variance is the sum of the variance of all project activities.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
6
A work breakdown structure breaks down a project into subcomponents, components, activities, and tasks.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
7
Slack is the amount of time an activity can be delayed without delaying the project.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
8
In PERT, three time estimates (optimistic, most likely, and pessimistic) provide an estimate of the mean and variance for each activity, based on the normal distribution.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
9
One aspect of project control is team building.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
10
Project crashing is a method for shortening the project completion time by reducing the completion time of one or more critical activities at a cost.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
11
Project teams are made up of individuals from various areas and departments within a company.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
12
A statement of work is a written description of the goals, work, and time frame of a project.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
13
Making time estimates is an element of project planning.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
14
The critical path is the shortest path through the project network.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
15
The expected project completion time is assumed to be normally distributed.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
16
Determining project completion time is an element of project planning.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
17
Establishing precedence relationships is an element of project planning.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
18
The sequence of activities in a project is depicted by the precedence relationships.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
19
Setting deadlines is an element of project planning.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
20
The critical path activities have no slack.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
21
The PERT pessimistic time estimate is an estimate of the minimum time an activity will require.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
22
In PERT, the actual project completion time will never exceed the expected duration of the critical path.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
23
In PERT, the path with the fewest activities is referred to as the critical path.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
24
The earliest finish time for the final activity on a project network is also the total completion of the project.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
25
Two concurrent activities in a project can be represented in an AOA network by starting and ending on the same node.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
26
Project ________ is a method for shortening the project completion time by reducing the completion time of one or more critical activities at a cost.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
27
Three time estimates (optimistic, most likely, and pessimistic) provide an estimate of the mean and variance for each activity, based on the ________ distribution.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
28
The early start for a non-critical activity is always equal to the earliest finish of the preceding activity.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
29
The standard deviation of project duration is the average of the standard deviation of all activities on the critical path.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
30
The early start for an activity on the critical path is always equal to the earliest finish of the preceding activity.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
31
Shortening the project's duration by deleting unnecessary activities is called crashing.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
32
The early start of an activity that has only one predecessor is equal to the early finish of that predecessor
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
33
An AON network will never require dummy activities.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
34
The early finish for an activity on the critical path is equal to the latest finish of the preceding activity.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
35
When earliest finish is subtracted from latest finish, we obtain the slack value for the activity.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
36
An AOA network will never require dummy activities.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
37
Crashing cost is always higher than the normal cost.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
38
The early start of an activity that has more than one predecessor is the minimum of the earliest finishes of all predecessors.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
39
A work breakdown structure is a useful tool because it addresses the timing of individual work elements.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
40
The expected project completion time is assumed to be ________ distributed based on the central limit theorem.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
41
If the early start for activity A is equal to 23 months and the duration of activity A is equal to 5 months, what is the earliest finish for activity A?
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
42
The critical path activities have no ________.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
43
Consider the following network.
Consider the following network.   The early start for activity 2 is ________.
The early start for activity 2 is ________.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
44
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   What is the critical path for this project network?
What is the critical path for this project network?
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
45
________ is the amount of time an activity can be delayed without delaying the project.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
46
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   Determine the latest start for activity E.
Determine the latest start for activity E.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
47
Consider the following network.
Consider the following network.   The latest start for activity 3 is ________.
The latest start for activity 3 is ________.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
48
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   What is the estimated expected mean time (in weeks) for the project completion?
What is the estimated expected mean time (in weeks) for the project completion?
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
49
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   What are the estimated slack times (in weeks) for activities A-H?
What are the estimated slack times (in weeks) for activities A-H?
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
50
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   What are the estimated expected completion (mean) times (in weeks) for activities A-H?
What are the estimated expected completion (mean) times (in weeks) for activities A-H?
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
51
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   What is the estimated standard deviation (in weeks) for the critical path completion time?
What is the estimated standard deviation (in weeks) for the critical path completion time?
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
52
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   What are the estimated standard deviations (in weeks) in the times for activities A-H?
What are the estimated standard deviations (in weeks) in the times for activities A-H?
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
53
When applying linear programming models to project crashing, the objective is to minimize ________.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
54
When applying linear programming models to project planning, the objective is to minimize ________.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
55
A(n) ________ chart is a graph or a bar chart for each activity that shows the project schedule and the passage of time.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
56
If the earliest finish for activity C is equal to 10 months and its duration 3 months, what is its earliest start?
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
57
A ________ breaks down a project into modules: subcomponents, components, activities, and tasks.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
58
When the earliest start time (ES) of an activity is subtracted from the latest start time (LS) of an activity, the value obtained is called ________.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
59
In an AOA network, a ________ activity is used to show a precedence relationship, but it does not represent passage of time.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
60
A ________ shows who in the organization is responsible for doing the work in a project.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
61
Once a project is underway, the project manager is responsible for the

A) people.
B) cost.
C) time.
D) all of the above
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
62
Consider the following network.
Consider the following network.   Identify all paths in the network.
Identify all paths in the network.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
63
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.     Determine which activities should be crashed to shorten the project by 3 days. What is the cost?
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.     Determine which activities should be crashed to shorten the project by 3 days. What is the cost?
Determine which activities should be crashed to shorten the project by 3 days. What is the cost?
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
64
Assume that the variance for each activity in the network is equal to 1. Compute the probability that path A-B-E-F will be completed in 15 days.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
65
Given the following information for a project, identify the critical path and determine the total completion time of the project.
Given the following information for a project, identify the critical path and determine the total completion time of the project.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
66
How long will it take to complete the project?
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
67
Consider the following network.
Consider the following network.   Identify the critical path.
Identify the critical path.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
68
Within what amount of time (in weeks) is there a 99% probability that the critical path for this project will be completed?
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
69
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   What is the probability that the critical path for this project will be completed within 75 weeks?
What is the probability that the critical path for this project will be completed within 75 weeks?
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
70
Given the following information for a project, draw the AON (Activity-On-Node) project network.
Given the following information for a project, draw the AON (Activity-On-Node) project network.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
71
Elements of project planning include

A) defining project objectives.
B) identifying activities to crash.
C) calculating expected times and standard deviations.
D) conducting a "lessons learned" session.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
72
Elements of project planning include

A) identifying time-cost tradeoffs.
B) determining the project critical path.
C) comparing project schedule objectives.
D) all of the above
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
73
A work breakdown structure breaks down a project into

A) weeks.
B) areas.
C) arcs.
D) modules.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
74
Given the following information for a project, draw the AOA (Activity-On-Arrow) project network.
Given the following information for a project, draw the AOA (Activity-On-Arrow) project network.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
75
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.     Determine which activities should be crashed to shorten the project by 1 day.
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.     Determine which activities should be crashed to shorten the project by 1 day.
Determine which activities should be crashed to shorten the project by 1 day.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
76
If an activity cannot be delayed without affecting the entire project, then it is a ________ activity.

A) completed
B) critical
C) crashed
D) normal
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
77
Given the following information for a project, what are the estimated slack times (in weeks) for activities A-H?
Given the following information for a project, what are the estimated slack times (in weeks) for activities A-H?   CP = Critical Path
CP = Critical Path
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
78
Within what amount of time (in weeks) is there a 90% probability that the critical path for this project will be completed?
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
79
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.     Determine which activities should be crashed to shorten the project by 2 days.
The diagram below shows the activities on the nodes, and the table shows the normal time and crash time (in days) and cost for each activity.     Determine which activities should be crashed to shorten the project by 2 days.
Determine which activities should be crashed to shorten the project by 2 days.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
80
Refer to the table below to answer the question(s) that follow:
Refer to the table below to answer the question(s) that follow:   What is the probability that the critical path for this project will be completed within 80 weeks?
What is the probability that the critical path for this project will be completed within 80 weeks?
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 116 flashcards in this deck.