Deck 12: Supply Chain Integration

Full screen (f)
exit full mode
Question
A common disruption of the supply chain resulting from internal causes is demand volume changes.
Use Space or
up arrow
down arrow
to flip the card.
Question
The bullwhip effect says that in any supply chain,the ordering patterns experience increasing variance as you move closer to the end customer.
Question
A supply chain can be thought of as a river that flows from raw material suppliers to consumers.
Question
Supply chain integration is the effective coordination of supply chain processes through the seamless flow of information to suppliers,but does not include customers,such as distributors and retailers.
Question
SKUs with lower volumes and higher weekly variability may be best served with an assemble-to-order or make-to-order supply chain design.
Question
Value analysis is a systematic effort to reduce the cost or improve the performance of a service or product.
Question
Once certified,a supplier can be used by the purchasing department without the purchaser having to make background checks.
Question
Concurrent engineering is the term used to describe a firm's development of a new product after it has been discovered that a competitor is engineering a similar product for launch.
Question
A strain is placed on the supply chain during the ramp-up stage of the development process due to changing volumes,quality issues and last minute design changes.
Question
A common disruption of the external supply chain is product and service mix changes.
Question
A common disruption of the external supply chain is engineering changes.
Question
In presourcing,suppliers are selected early in the concept-development stage.
Question
The SCOR model focuses on the supply chain processes of planning,making,sourcing,delivering,and returning.
Question
SKUs with higher volumes and lower weekly variability may be best served with a make- to-stock supply chain design.
Question
The finished goods of one firm may actually be the raw materials for another firm.
Question
Supply chain integration is the effective coordination of supply chain processes through the seamless flow of information to suppliers,up and down the supply chain
Question
The SCOR model provides guidelines for how materials are to be delivered along a supply chain.
Question
A common disruption of the supply chain resulting from internal causes is order batching.
Question
Concurrent engineering helps firms avoid the costly mismatch between the design of a new offering and the capability of the processes required to produce it.
Question
The ramp-up stage of the development process precedes the full launch stage.
Question
The most used form of e-purchasing today is electronic data interchange.
Question
The cost of equipment,labor,facilities and maintenance must all be considered when a firm decides to use a contract carrier for its distribution.
Question
Electronic Data Interchange enables the transmission of routine,standardized business documents from computer to computer over telephone or direct leased lines.
Question
Reducing the number of suppliers for an item carries an increased risk of interruption in supply.
Question
The bullwhip effect is characterized by:

A)ordering patterns that experience increasing variance as you proceed downstream in the chain.
B)ordering patterns that experience increasing variance as you proceed upstream in the chain.
C)purchasing patterns that experience increasing variance downstream in the chain.
D)purchasing patterns that experience decreasing variance as you proceed upstream in the chain.
Question
Which of the following changes would decrease the likelihood of the bullwhip effect?

A)changing the mix of items in an order
B)sending partial shipments of an order
C)instituting a policy of no discounts or promotions
D)sending late deliveries of an order
Question
Early supplier involvement is a program that allows suppliers to fill orders prior to the customer placing them.
Question
The competitive orientation to supplier relations is that the buyer and supplier are partners.
Question
Drop shipping occurs when a retailer passes customer orders directly to a wholesaler or manufacturer,which then ships the order directly to the customer with the retailer's label on it.
Question
Using rail to move large quantities of goods is relatively cheap,but transit times are long and often variable.
Question
A catalog hub is a central distribution point where buyers may purchase items directly from manufacturers before the items are shipped to retailers.
Question
In a competitive orientation to negotiations between buyer and supplier,the buyer does not always possess the power in the relationship-the supplier sometimes holds the power and can exercise this power during negotiations with the buyer.
Question
A cross-docking warehouse holds inventory from manufacturers until retailers are prepared to sell the items.
Question
Green purchasing involves identifying,assessing,and managing the flow of environmental waste and finding ways to reduce it and minimize its impact on the environment.
Question
A buyer has more purchasing power when fewer substitutes are available.
Question
Which of the following is NOT a component of the supply chain?

A)order fulfillment
B)materials
C)customer relationship
D)competitors
Question
Vendor-managed inventories are an example of the forward-placement tactic.
Question
An electronic market that brings together textbook sellers,office supply companies,apparel vendors,and students is an example of an exchange.
Question
Which of the following changes would increase the likelihood of a supply chain experiencing the bullwhip effect?

A)engineering changes to the design of a product
B)instituting a more accurate materials management information system
C)closely coordinating promotions with the internal marketing department and suppliers
D)using a more reliable delivery company
Question
The order-fulfillment process involves the activities to deliver a product or service to the customer.
Question
Which of the following is NOT a stage in the New Service / Product Development Process?

A)development
B)design
C)maintenance
D)analysis
Question
A new product development team that is composed of product and process engineers,marketers,quality specialists,and buyers that work together to make sure the new product can actually be built is engaging in:

A)concurrent engineering.
B)joint application development.
C)reverse logistics.
D)core process design.
Question
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.What are the annual inventory costs if the lower inventory cost supplier is selected?</strong> A)$5,220 B)$9,600 C)$6,600 D)$6,320 <div style=padding-top: 35px>
Refer to the instruction above.What are the annual inventory costs if the lower inventory cost supplier is selected?

A)$5,220
B)$9,600
C)$6,600
D)$6,320
Question
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.How many shipments per year are required if Irmo Auto is the supplier selected?</strong> A)1,000 B)750 C)25 D)100 <div style=padding-top: 35px>
Refer to the instruction above.How many shipments per year are required if Irmo Auto is the supplier selected?

A)1,000
B)750
C)25
D)100
Question
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.What are the total annual costs if Lexington Tire is the supplier selected?</strong> A)$791,600 B)$792,600 C)$772,320 D)$769,320 <div style=padding-top: 35px>
Refer to the instruction above.What are the total annual costs if Lexington Tire is the supplier selected?

A)$791,600
B)$792,600
C)$772,320
D)$769,320
Question
The SCOR model requires a(n):

A)three-tier supply chain.
B)point of reference.
C)make-to-order or assemble-to-order product.
D)process view.
Question
Which of the following is NOT an internal cause of supply chain disruptions?

A)engineering changes
B)batching of orders
C)service or product promotions
D)underfilled shipments
Question
The stage of new product or service development that links the creation of new services or products to the corporate strategy of the firm is called:

A)design.
B)analysis.
C)development.
D)full launch.
Question
The SCOR model focuses on the basic supply chain processes of:

A)source,control,operate,return.
B)plan source,make deliver,return.
C)purchase,operate,control,logistics.
D)operations,marketing,finance.
Question
One source of disruption caused by the internal supply chain is:

A)forecast error.
B)underfilled shipments.
C)volume changes.
D)late deliveries.
Question
One source of disruption caused by the external supply chain is:

A)product or sales promotions.
B)new product or service introduction.
C)late deliveries.
D)engineering changes.
Question
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.What are the total annual costs if Irmo Auto is the supplier selected?</strong> A)$791,600 B)$792,600 C)$773,220 D)$769,320 <div style=padding-top: 35px>
Refer to the instruction above.What are the total annual costs if Irmo Auto is the supplier selected?

A)$791,600
B)$792,600
C)$773,220
D)$769,320
Question
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.What are the annual material savings available when comparing the two suppliers?</strong> A)$25,000 B)$150,000 C)$725,000 D)$3,000 <div style=padding-top: 35px>
Refer to the instruction above.What are the annual material savings available when comparing the two suppliers?

A)$25,000
B)$150,000
C)$725,000
D)$3,000
Question
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.What are the annual material costs for Lexington Tire?</strong> A)$60,000 B)$750,000 C)$725,000 D)$3,000 <div style=padding-top: 35px>
Refer to the instruction above.What are the annual material costs for Lexington Tire?

A)$60,000
B)$750,000
C)$725,000
D)$3,000
Question
Which one of the following statements is TRUE about purchasing?

A)Purchasing's primary role is to satisfy the firm's long-term supply needs.
B)Purchasing's primary role should be placing and tracking orders.
C)Purchasing's primary role is to negotiate lower prices.
D)Purchasing's primary role is to negotiate prices and delivery dates.
Question
Which of the following is NOT an external cause of supply chain disruptions?

A)late deliveries
B)new service or product introductions
C)customer service or product mix changes
D)underfilled shipments
Question
The stage of new service or product development at which personnel are trained and some pilot runs can be conducted to look for possible problems in production is called:

A)design.
B)analysis.
C)development.
D)full launch.
Question
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.What are the annual shipping savings available when comparing the two suppliers?</strong> A)$25,000 B)$18,000 C)$72,500 D)$7,000 <div style=padding-top: 35px>
Refer to the instruction above.What are the annual shipping savings available when comparing the two suppliers?

A)$25,000
B)$18,000
C)$72,500
D)$7,000
Question
Possible causes of disruption due to internal supply chain problems are:

A)late deliveries.
B)machine breakdowns or inexperienced workers.
C)product and service mix changes.
D)underfilled shipments.
Question
The product development team ensures compatibility of the proposed product with corporate strategy and regulatory standards in the:

A)design stage.
B)analysis stage.
C)development stage.
D)full launch stage.
Question
Use the following to answer the questions below.
The Burdell Wheel and Tire Company has completed a total cost analysis for two suppliers of tires to support their business.They also consider delivery speed,consistent quality and environmental sensitivity in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company has completed a total cost analysis for two suppliers of tires to support their business.They also consider delivery speed,consistent quality and environmental sensitivity in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.   Refer to the instruction above.Using the preference matrix approach for selecting suppliers,what is Lexington Tire's total weighted score?</strong> A)570 B)100 C)23 D)605 <div style=padding-top: 35px>
Refer to the instruction above.Using the preference matrix approach for selecting suppliers,what is Lexington Tire's total weighted score?

A)570
B)100
C)23
D)605
Question
The practice of selecting suppliers and giving them significant responsibility for the design of certain components or systems of the product is called:

A)value analysis.
B)locus of control.
C)presourcing.
D)vendor-managed inventories.
Question
Use the following to answer the questions below.
The Steele Bike Company has completed a total cost analysis for two suppliers of bicycle frames to support their business.They also consider on-time speed,top quality and customization in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.
<strong>Use the following to answer the questions below. The Steele Bike Company has completed a total cost analysis for two suppliers of bicycle frames to support their business.They also consider on-time speed,top quality and customization in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.   Refer to the instruction above.Using the preference matrix approach for selecting suppliers,what is State's total weighted score?</strong> A)570 B)100 C)23 D)590 <div style=padding-top: 35px>
Refer to the instruction above.Using the preference matrix approach for selecting suppliers,what is State's total weighted score?

A)570
B)100
C)23
D)590
Question
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.The high-cost supplier has indicated that if Steele will select them as the supplier of choice,they will not charge for shipping.How does this change the decision on bicycle frame suppliers?</strong> A)The high-cost supplier is now the low-cost supplier,and becomes the frame supplier for Steele. B)The suppliers are now equal cost,and Steele can select either supplier. C)It doesn't change the decision-they are still the high-cost supplier. D)More information is required to make this decision. <div style=padding-top: 35px>
Refer to the instruction above.The high-cost supplier has indicated that if Steele will select them as the supplier of choice,they will not charge for shipping.How does this change the decision on bicycle frame suppliers?

A)The high-cost supplier is now the low-cost supplier,and becomes the frame supplier for Steele.
B)The suppliers are now equal cost,and Steele can select either supplier.
C)It doesn't change the decision-they are still the high-cost supplier.
D)More information is required to make this decision.
Question
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.What are the annual material costs for Acme?</strong> A)$550,000 B)$750,000 C)$3,900,000 D)$35,000 <div style=padding-top: 35px>
Refer to the instruction above.What are the annual material costs for Acme?

A)$550,000
B)$750,000
C)$3,900,000
D)$35,000
Question
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.The high-cost supplier desperately wants the Burdell Company business.They have indicated that if Burdell will select them as their supplier,they will not charge for shipping.How does this change the decision on tire suppliers?</strong> A)The high-cost supplier is now lower,and becomes the tire supplier for Burdell. B)The suppliers are now equal cost,and Burdell can select either supplier. C)It doesn't change the decision-they are still the high-cost supplier. D)More information is required to make this decision. <div style=padding-top: 35px>
Refer to the instruction above.The high-cost supplier desperately wants the Burdell Company business.They have indicated that if Burdell will select them as their supplier,they will not charge for shipping.How does this change the decision on tire suppliers?

A)The high-cost supplier is now lower,and becomes the tire supplier for Burdell.
B)The suppliers are now equal cost,and Burdell can select either supplier.
C)It doesn't change the decision-they are still the high-cost supplier.
D)More information is required to make this decision.
Question
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.What are the total annual costs if State is the supplier selected?</strong> A)$4,026,450 B)$110,450 C)$4,001,050 D)$4,016,550 <div style=padding-top: 35px>
Refer to the instruction above.What are the total annual costs if State is the supplier selected?

A)$4,026,450
B)$110,450
C)$4,001,050
D)$4,016,550
Question
Use the following to answer the questions below.
The Burdell Wheel and Tire Company has completed a total cost analysis for two suppliers of tires to support their business.They also consider delivery speed,consistent quality and environmental sensitivity in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company has completed a total cost analysis for two suppliers of tires to support their business.They also consider delivery speed,consistent quality and environmental sensitivity in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.   Refer to the instruction above.Using the preference matrix approach for selecting suppliers,what is Irmo Auto's total weighted score?</strong> A)570 B)100 C)24 D)605 <div style=padding-top: 35px>
Refer to the instruction above.Using the preference matrix approach for selecting suppliers,what is Irmo Auto's total weighted score?

A)570
B)100
C)24
D)605
Question
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.How many shipments per year are required if State is the supplier selected?</strong> A)13.3 B)40 C)200 D)10 <div style=padding-top: 35px>
Refer to the instruction above.How many shipments per year are required if State is the supplier selected?

A)13.3
B)40
C)200
D)10
Question
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.What are the total annual savings if the lower cost supplier is selected?</strong> A)$1,000 B)$19,380 C)$3,000 D)$6,320 <div style=padding-top: 35px>
Refer to the instruction above.What are the total annual savings if the lower cost supplier is selected?

A)$1,000
B)$19,380
C)$3,000
D)$6,320
Question
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.Based on your Total Cost Analysis,which supplier should be selected if the lower cost supplier is chosen?</strong> A)Acme B)State C)Since the costs are the same,either supplier could be selected. D)More information is needed to answer this question. <div style=padding-top: 35px>
Refer to the instruction above.Based on your Total Cost Analysis,which supplier should be selected if the lower cost supplier is chosen?

A)Acme
B)State
C)Since the costs are the same,either supplier could be selected.
D)More information is needed to answer this question.
Question
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.What are the total annual savings if the lower cost supplier is selected?</strong> A)$1,000 B)$12,500 C)$9,400 D)$14,900 <div style=padding-top: 35px>
Refer to the instruction above.What are the total annual savings if the lower cost supplier is selected?

A)$1,000
B)$12,500
C)$9,400
D)$14,900
Question
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.What are the annual inventory costs if the lower inventory cost supplier is selected?</strong> A)$56,550 B)$96,500 C)$21,450 D)$7,800 <div style=padding-top: 35px>
Refer to the instruction above.What are the annual inventory costs if the lower inventory cost supplier is selected?

A)$56,550
B)$96,500
C)$21,450
D)$7,800
Question
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.What are the annual material savings available when comparing the two suppliers?</strong> A)$7,800 B)$390,000 C)$750,000 D)The materials are the same cost from either supplier <div style=padding-top: 35px>
Refer to the instruction above.What are the annual material savings available when comparing the two suppliers?

A)$7,800
B)$390,000
C)$750,000
D)The materials are the same cost from either supplier
Question
Use the following to answer the questions below.
The Steele Bike Company has completed a total cost analysis for two suppliers of bicycle frames to support their business.They also consider on-time speed,top quality and customization in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.
<strong>Use the following to answer the questions below. The Steele Bike Company has completed a total cost analysis for two suppliers of bicycle frames to support their business.They also consider on-time speed,top quality and customization in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.   Refer to the instruction above.Using the preference matrix (total weighted score)approach for selecting suppliers,which supplier should Steele select?</strong> A)State B)Acme C)Either is acceptable-their preference matrix scores are the same. D)More information is needed to make this decision. <div style=padding-top: 35px>
Refer to the instruction above.Using the preference matrix (total weighted score)approach for selecting suppliers,which supplier should Steele select?

A)State
B)Acme
C)Either is acceptable-their preference matrix scores are the same.
D)More information is needed to make this decision.
Question
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.What are the annual shipping savings available when comparing the two suppliers?</strong> A)$25,000 B)$10,000 C)$7,500 D)Shipping costs are the same from either supplier <div style=padding-top: 35px>
Refer to the instruction above.What are the annual shipping savings available when comparing the two suppliers?

A)$25,000
B)$10,000
C)$7,500
D)Shipping costs are the same from either supplier
Question
Use the following to answer the questions below.
The Burdell Wheel and Tire Company has completed a total cost analysis for two suppliers of tires to support their business.They also consider delivery speed,consistent quality and environmental sensitivity in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company has completed a total cost analysis for two suppliers of tires to support their business.They also consider delivery speed,consistent quality and environmental sensitivity in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.   Refer to the instruction above.Using the preference matrix approach for selecting suppliers,which supplier should Burdell select? total weighted score?</strong> A)Lexington Tire B)Irmo Auto C)Neither is acceptable-their preference matrix scores are not high enough to be selected. D)More information is needed to make this decision. <div style=padding-top: 35px>
Refer to the instruction above.Using the preference matrix approach for selecting suppliers,which supplier should Burdell select? total weighted score?

A)Lexington Tire
B)Irmo Auto
C)Neither is acceptable-their preference matrix scores are not high enough to be selected.
D)More information is needed to make this decision.
Question
Use the following to answer the questions below.
The Steele Bike Company has completed a total cost analysis for two suppliers of bicycle frames to support their business.They also consider on-time speed,top quality and customization in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.
<strong>Use the following to answer the questions below. The Steele Bike Company has completed a total cost analysis for two suppliers of bicycle frames to support their business.They also consider on-time speed,top quality and customization in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.   Refer to the instruction above.Using the preference matrix approach for selecting suppliers,what is Acme's total weighted score?</strong> A)100 B)570 C)24 D)590 <div style=padding-top: 35px>
Refer to the instruction above.Using the preference matrix approach for selecting suppliers,what is Acme's total weighted score?

A)100
B)570
C)24
D)590
Question
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.What are the total annual costs if Acme is the supplier selected?</strong> A)$4,010,450 B)$113,550 C)$4,001,050 D)$4,011,550 <div style=padding-top: 35px>
Refer to the instruction above.What are the total annual costs if Acme is the supplier selected?

A)$4,010,450
B)$113,550
C)$4,001,050
D)$4,011,550
Question
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.Based on your Total Cost Analysis,which supplier should be selected if the lower cost supplier is chosen?</strong> A)Lexington Tire B)Irmo Auto C)Since the costs are the same,either supplier could be selected. D)More information is needed to answer this question. <div style=padding-top: 35px>
Refer to the instruction above.Based on your Total Cost Analysis,which supplier should be selected if the lower cost supplier is chosen?

A)Lexington Tire
B)Irmo Auto
C)Since the costs are the same,either supplier could be selected.
D)More information is needed to answer this question.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/130
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 12: Supply Chain Integration
1
A common disruption of the supply chain resulting from internal causes is demand volume changes.
False
2
The bullwhip effect says that in any supply chain,the ordering patterns experience increasing variance as you move closer to the end customer.
False
3
A supply chain can be thought of as a river that flows from raw material suppliers to consumers.
True
4
Supply chain integration is the effective coordination of supply chain processes through the seamless flow of information to suppliers,but does not include customers,such as distributors and retailers.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
5
SKUs with lower volumes and higher weekly variability may be best served with an assemble-to-order or make-to-order supply chain design.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
6
Value analysis is a systematic effort to reduce the cost or improve the performance of a service or product.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
7
Once certified,a supplier can be used by the purchasing department without the purchaser having to make background checks.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
8
Concurrent engineering is the term used to describe a firm's development of a new product after it has been discovered that a competitor is engineering a similar product for launch.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
9
A strain is placed on the supply chain during the ramp-up stage of the development process due to changing volumes,quality issues and last minute design changes.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
10
A common disruption of the external supply chain is product and service mix changes.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
11
A common disruption of the external supply chain is engineering changes.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
12
In presourcing,suppliers are selected early in the concept-development stage.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
13
The SCOR model focuses on the supply chain processes of planning,making,sourcing,delivering,and returning.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
14
SKUs with higher volumes and lower weekly variability may be best served with a make- to-stock supply chain design.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
15
The finished goods of one firm may actually be the raw materials for another firm.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
16
Supply chain integration is the effective coordination of supply chain processes through the seamless flow of information to suppliers,up and down the supply chain
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
17
The SCOR model provides guidelines for how materials are to be delivered along a supply chain.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
18
A common disruption of the supply chain resulting from internal causes is order batching.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
19
Concurrent engineering helps firms avoid the costly mismatch between the design of a new offering and the capability of the processes required to produce it.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
20
The ramp-up stage of the development process precedes the full launch stage.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
21
The most used form of e-purchasing today is electronic data interchange.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
22
The cost of equipment,labor,facilities and maintenance must all be considered when a firm decides to use a contract carrier for its distribution.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
23
Electronic Data Interchange enables the transmission of routine,standardized business documents from computer to computer over telephone or direct leased lines.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
24
Reducing the number of suppliers for an item carries an increased risk of interruption in supply.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
25
The bullwhip effect is characterized by:

A)ordering patterns that experience increasing variance as you proceed downstream in the chain.
B)ordering patterns that experience increasing variance as you proceed upstream in the chain.
C)purchasing patterns that experience increasing variance downstream in the chain.
D)purchasing patterns that experience decreasing variance as you proceed upstream in the chain.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
26
Which of the following changes would decrease the likelihood of the bullwhip effect?

A)changing the mix of items in an order
B)sending partial shipments of an order
C)instituting a policy of no discounts or promotions
D)sending late deliveries of an order
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
27
Early supplier involvement is a program that allows suppliers to fill orders prior to the customer placing them.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
28
The competitive orientation to supplier relations is that the buyer and supplier are partners.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
29
Drop shipping occurs when a retailer passes customer orders directly to a wholesaler or manufacturer,which then ships the order directly to the customer with the retailer's label on it.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
30
Using rail to move large quantities of goods is relatively cheap,but transit times are long and often variable.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
31
A catalog hub is a central distribution point where buyers may purchase items directly from manufacturers before the items are shipped to retailers.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
32
In a competitive orientation to negotiations between buyer and supplier,the buyer does not always possess the power in the relationship-the supplier sometimes holds the power and can exercise this power during negotiations with the buyer.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
33
A cross-docking warehouse holds inventory from manufacturers until retailers are prepared to sell the items.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
34
Green purchasing involves identifying,assessing,and managing the flow of environmental waste and finding ways to reduce it and minimize its impact on the environment.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
35
A buyer has more purchasing power when fewer substitutes are available.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
36
Which of the following is NOT a component of the supply chain?

A)order fulfillment
B)materials
C)customer relationship
D)competitors
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
37
Vendor-managed inventories are an example of the forward-placement tactic.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
38
An electronic market that brings together textbook sellers,office supply companies,apparel vendors,and students is an example of an exchange.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
39
Which of the following changes would increase the likelihood of a supply chain experiencing the bullwhip effect?

A)engineering changes to the design of a product
B)instituting a more accurate materials management information system
C)closely coordinating promotions with the internal marketing department and suppliers
D)using a more reliable delivery company
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
40
The order-fulfillment process involves the activities to deliver a product or service to the customer.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
41
Which of the following is NOT a stage in the New Service / Product Development Process?

A)development
B)design
C)maintenance
D)analysis
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
42
A new product development team that is composed of product and process engineers,marketers,quality specialists,and buyers that work together to make sure the new product can actually be built is engaging in:

A)concurrent engineering.
B)joint application development.
C)reverse logistics.
D)core process design.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
43
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.What are the annual inventory costs if the lower inventory cost supplier is selected?</strong> A)$5,220 B)$9,600 C)$6,600 D)$6,320
Refer to the instruction above.What are the annual inventory costs if the lower inventory cost supplier is selected?

A)$5,220
B)$9,600
C)$6,600
D)$6,320
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
44
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.How many shipments per year are required if Irmo Auto is the supplier selected?</strong> A)1,000 B)750 C)25 D)100
Refer to the instruction above.How many shipments per year are required if Irmo Auto is the supplier selected?

A)1,000
B)750
C)25
D)100
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
45
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.What are the total annual costs if Lexington Tire is the supplier selected?</strong> A)$791,600 B)$792,600 C)$772,320 D)$769,320
Refer to the instruction above.What are the total annual costs if Lexington Tire is the supplier selected?

A)$791,600
B)$792,600
C)$772,320
D)$769,320
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
46
The SCOR model requires a(n):

A)three-tier supply chain.
B)point of reference.
C)make-to-order or assemble-to-order product.
D)process view.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
47
Which of the following is NOT an internal cause of supply chain disruptions?

A)engineering changes
B)batching of orders
C)service or product promotions
D)underfilled shipments
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
48
The stage of new product or service development that links the creation of new services or products to the corporate strategy of the firm is called:

A)design.
B)analysis.
C)development.
D)full launch.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
49
The SCOR model focuses on the basic supply chain processes of:

A)source,control,operate,return.
B)plan source,make deliver,return.
C)purchase,operate,control,logistics.
D)operations,marketing,finance.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
50
One source of disruption caused by the internal supply chain is:

A)forecast error.
B)underfilled shipments.
C)volume changes.
D)late deliveries.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
51
One source of disruption caused by the external supply chain is:

A)product or sales promotions.
B)new product or service introduction.
C)late deliveries.
D)engineering changes.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
52
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.What are the total annual costs if Irmo Auto is the supplier selected?</strong> A)$791,600 B)$792,600 C)$773,220 D)$769,320
Refer to the instruction above.What are the total annual costs if Irmo Auto is the supplier selected?

A)$791,600
B)$792,600
C)$773,220
D)$769,320
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
53
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.What are the annual material savings available when comparing the two suppliers?</strong> A)$25,000 B)$150,000 C)$725,000 D)$3,000
Refer to the instruction above.What are the annual material savings available when comparing the two suppliers?

A)$25,000
B)$150,000
C)$725,000
D)$3,000
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
54
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.What are the annual material costs for Lexington Tire?</strong> A)$60,000 B)$750,000 C)$725,000 D)$3,000
Refer to the instruction above.What are the annual material costs for Lexington Tire?

A)$60,000
B)$750,000
C)$725,000
D)$3,000
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
55
Which one of the following statements is TRUE about purchasing?

A)Purchasing's primary role is to satisfy the firm's long-term supply needs.
B)Purchasing's primary role should be placing and tracking orders.
C)Purchasing's primary role is to negotiate lower prices.
D)Purchasing's primary role is to negotiate prices and delivery dates.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
56
Which of the following is NOT an external cause of supply chain disruptions?

A)late deliveries
B)new service or product introductions
C)customer service or product mix changes
D)underfilled shipments
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
57
The stage of new service or product development at which personnel are trained and some pilot runs can be conducted to look for possible problems in production is called:

A)design.
B)analysis.
C)development.
D)full launch.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
58
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.What are the annual shipping savings available when comparing the two suppliers?</strong> A)$25,000 B)$18,000 C)$72,500 D)$7,000
Refer to the instruction above.What are the annual shipping savings available when comparing the two suppliers?

A)$25,000
B)$18,000
C)$72,500
D)$7,000
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
59
Possible causes of disruption due to internal supply chain problems are:

A)late deliveries.
B)machine breakdowns or inexperienced workers.
C)product and service mix changes.
D)underfilled shipments.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
60
The product development team ensures compatibility of the proposed product with corporate strategy and regulatory standards in the:

A)design stage.
B)analysis stage.
C)development stage.
D)full launch stage.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
61
Use the following to answer the questions below.
The Burdell Wheel and Tire Company has completed a total cost analysis for two suppliers of tires to support their business.They also consider delivery speed,consistent quality and environmental sensitivity in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company has completed a total cost analysis for two suppliers of tires to support their business.They also consider delivery speed,consistent quality and environmental sensitivity in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.   Refer to the instruction above.Using the preference matrix approach for selecting suppliers,what is Lexington Tire's total weighted score?</strong> A)570 B)100 C)23 D)605
Refer to the instruction above.Using the preference matrix approach for selecting suppliers,what is Lexington Tire's total weighted score?

A)570
B)100
C)23
D)605
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
62
The practice of selecting suppliers and giving them significant responsibility for the design of certain components or systems of the product is called:

A)value analysis.
B)locus of control.
C)presourcing.
D)vendor-managed inventories.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
63
Use the following to answer the questions below.
The Steele Bike Company has completed a total cost analysis for two suppliers of bicycle frames to support their business.They also consider on-time speed,top quality and customization in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.
<strong>Use the following to answer the questions below. The Steele Bike Company has completed a total cost analysis for two suppliers of bicycle frames to support their business.They also consider on-time speed,top quality and customization in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.   Refer to the instruction above.Using the preference matrix approach for selecting suppliers,what is State's total weighted score?</strong> A)570 B)100 C)23 D)590
Refer to the instruction above.Using the preference matrix approach for selecting suppliers,what is State's total weighted score?

A)570
B)100
C)23
D)590
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
64
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.The high-cost supplier has indicated that if Steele will select them as the supplier of choice,they will not charge for shipping.How does this change the decision on bicycle frame suppliers?</strong> A)The high-cost supplier is now the low-cost supplier,and becomes the frame supplier for Steele. B)The suppliers are now equal cost,and Steele can select either supplier. C)It doesn't change the decision-they are still the high-cost supplier. D)More information is required to make this decision.
Refer to the instruction above.The high-cost supplier has indicated that if Steele will select them as the supplier of choice,they will not charge for shipping.How does this change the decision on bicycle frame suppliers?

A)The high-cost supplier is now the low-cost supplier,and becomes the frame supplier for Steele.
B)The suppliers are now equal cost,and Steele can select either supplier.
C)It doesn't change the decision-they are still the high-cost supplier.
D)More information is required to make this decision.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
65
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.What are the annual material costs for Acme?</strong> A)$550,000 B)$750,000 C)$3,900,000 D)$35,000
Refer to the instruction above.What are the annual material costs for Acme?

A)$550,000
B)$750,000
C)$3,900,000
D)$35,000
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
66
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.The high-cost supplier desperately wants the Burdell Company business.They have indicated that if Burdell will select them as their supplier,they will not charge for shipping.How does this change the decision on tire suppliers?</strong> A)The high-cost supplier is now lower,and becomes the tire supplier for Burdell. B)The suppliers are now equal cost,and Burdell can select either supplier. C)It doesn't change the decision-they are still the high-cost supplier. D)More information is required to make this decision.
Refer to the instruction above.The high-cost supplier desperately wants the Burdell Company business.They have indicated that if Burdell will select them as their supplier,they will not charge for shipping.How does this change the decision on tire suppliers?

A)The high-cost supplier is now lower,and becomes the tire supplier for Burdell.
B)The suppliers are now equal cost,and Burdell can select either supplier.
C)It doesn't change the decision-they are still the high-cost supplier.
D)More information is required to make this decision.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
67
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.What are the total annual costs if State is the supplier selected?</strong> A)$4,026,450 B)$110,450 C)$4,001,050 D)$4,016,550
Refer to the instruction above.What are the total annual costs if State is the supplier selected?

A)$4,026,450
B)$110,450
C)$4,001,050
D)$4,016,550
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
68
Use the following to answer the questions below.
The Burdell Wheel and Tire Company has completed a total cost analysis for two suppliers of tires to support their business.They also consider delivery speed,consistent quality and environmental sensitivity in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company has completed a total cost analysis for two suppliers of tires to support their business.They also consider delivery speed,consistent quality and environmental sensitivity in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.   Refer to the instruction above.Using the preference matrix approach for selecting suppliers,what is Irmo Auto's total weighted score?</strong> A)570 B)100 C)24 D)605
Refer to the instruction above.Using the preference matrix approach for selecting suppliers,what is Irmo Auto's total weighted score?

A)570
B)100
C)24
D)605
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
69
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.How many shipments per year are required if State is the supplier selected?</strong> A)13.3 B)40 C)200 D)10
Refer to the instruction above.How many shipments per year are required if State is the supplier selected?

A)13.3
B)40
C)200
D)10
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
70
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.What are the total annual savings if the lower cost supplier is selected?</strong> A)$1,000 B)$19,380 C)$3,000 D)$6,320
Refer to the instruction above.What are the total annual savings if the lower cost supplier is selected?

A)$1,000
B)$19,380
C)$3,000
D)$6,320
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
71
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.Based on your Total Cost Analysis,which supplier should be selected if the lower cost supplier is chosen?</strong> A)Acme B)State C)Since the costs are the same,either supplier could be selected. D)More information is needed to answer this question.
Refer to the instruction above.Based on your Total Cost Analysis,which supplier should be selected if the lower cost supplier is chosen?

A)Acme
B)State
C)Since the costs are the same,either supplier could be selected.
D)More information is needed to answer this question.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
72
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.What are the total annual savings if the lower cost supplier is selected?</strong> A)$1,000 B)$12,500 C)$9,400 D)$14,900
Refer to the instruction above.What are the total annual savings if the lower cost supplier is selected?

A)$1,000
B)$12,500
C)$9,400
D)$14,900
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
73
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.What are the annual inventory costs if the lower inventory cost supplier is selected?</strong> A)$56,550 B)$96,500 C)$21,450 D)$7,800
Refer to the instruction above.What are the annual inventory costs if the lower inventory cost supplier is selected?

A)$56,550
B)$96,500
C)$21,450
D)$7,800
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
74
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.What are the annual material savings available when comparing the two suppliers?</strong> A)$7,800 B)$390,000 C)$750,000 D)The materials are the same cost from either supplier
Refer to the instruction above.What are the annual material savings available when comparing the two suppliers?

A)$7,800
B)$390,000
C)$750,000
D)The materials are the same cost from either supplier
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
75
Use the following to answer the questions below.
The Steele Bike Company has completed a total cost analysis for two suppliers of bicycle frames to support their business.They also consider on-time speed,top quality and customization in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.
<strong>Use the following to answer the questions below. The Steele Bike Company has completed a total cost analysis for two suppliers of bicycle frames to support their business.They also consider on-time speed,top quality and customization in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.   Refer to the instruction above.Using the preference matrix (total weighted score)approach for selecting suppliers,which supplier should Steele select?</strong> A)State B)Acme C)Either is acceptable-their preference matrix scores are the same. D)More information is needed to make this decision.
Refer to the instruction above.Using the preference matrix (total weighted score)approach for selecting suppliers,which supplier should Steele select?

A)State
B)Acme
C)Either is acceptable-their preference matrix scores are the same.
D)More information is needed to make this decision.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
76
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.What are the annual shipping savings available when comparing the two suppliers?</strong> A)$25,000 B)$10,000 C)$7,500 D)Shipping costs are the same from either supplier
Refer to the instruction above.What are the annual shipping savings available when comparing the two suppliers?

A)$25,000
B)$10,000
C)$7,500
D)Shipping costs are the same from either supplier
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
77
Use the following to answer the questions below.
The Burdell Wheel and Tire Company has completed a total cost analysis for two suppliers of tires to support their business.They also consider delivery speed,consistent quality and environmental sensitivity in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company has completed a total cost analysis for two suppliers of tires to support their business.They also consider delivery speed,consistent quality and environmental sensitivity in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.   Refer to the instruction above.Using the preference matrix approach for selecting suppliers,which supplier should Burdell select? total weighted score?</strong> A)Lexington Tire B)Irmo Auto C)Neither is acceptable-their preference matrix scores are not high enough to be selected. D)More information is needed to make this decision.
Refer to the instruction above.Using the preference matrix approach for selecting suppliers,which supplier should Burdell select? total weighted score?

A)Lexington Tire
B)Irmo Auto
C)Neither is acceptable-their preference matrix scores are not high enough to be selected.
D)More information is needed to make this decision.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
78
Use the following to answer the questions below.
The Steele Bike Company has completed a total cost analysis for two suppliers of bicycle frames to support their business.They also consider on-time speed,top quality and customization in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.
<strong>Use the following to answer the questions below. The Steele Bike Company has completed a total cost analysis for two suppliers of bicycle frames to support their business.They also consider on-time speed,top quality and customization in their selection process.Each criterion is given a weight (total = 100 points),and each supplier is scored on each criterion (1 = poor,10 = excellent).The data are shown in the following table.   Refer to the instruction above.Using the preference matrix approach for selecting suppliers,what is Acme's total weighted score?</strong> A)100 B)570 C)24 D)590
Refer to the instruction above.Using the preference matrix approach for selecting suppliers,what is Acme's total weighted score?

A)100
B)570
C)24
D)590
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
79
Use the following to answer the questions below.
The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.
<strong>Use the following to answer the questions below. The Steele Bike Company assembles bicycles for a major retail toy outlet.The main purchase is bicycle frames for making these bicycles.Dan Steele,the owner,wants to locate a low-cost supplier for the frames used in this assembly operation.The supplier will be selected based on total annual cost to supply Steele's needs.Annual requirements are for 100,000 frames,and the company operates 200 days a year.Two suppliers,Acme and State,have quoted the same price for the frames,but quantities,lead times and shipping costs are considerably different.The following data are available for the two suppliers.   Refer to the instruction above.What are the total annual costs if Acme is the supplier selected?</strong> A)$4,010,450 B)$113,550 C)$4,001,050 D)$4,011,550
Refer to the instruction above.What are the total annual costs if Acme is the supplier selected?

A)$4,010,450
B)$113,550
C)$4,001,050
D)$4,011,550
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
80
Use the following to answer the questions below.
The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.
<strong>Use the following to answer the questions below. The Burdell Wheel and Tire Company assembles tires to wheel rims for use on cars during manufacture of vehicles by the automotive industry.Burdell wants to locate a low-cost supplier for the tires he uses in his assembly operation.The supplier will be selected based on total annual cost to supply Burdell's needs.Burdell's annual requirements are for 25,000 tires,and the company operates 250 days a year.The following data are available for two suppliers being considered.   Refer to the instruction above.Based on your Total Cost Analysis,which supplier should be selected if the lower cost supplier is chosen?</strong> A)Lexington Tire B)Irmo Auto C)Since the costs are the same,either supplier could be selected. D)More information is needed to answer this question.
Refer to the instruction above.Based on your Total Cost Analysis,which supplier should be selected if the lower cost supplier is chosen?

A)Lexington Tire
B)Irmo Auto
C)Since the costs are the same,either supplier could be selected.
D)More information is needed to answer this question.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 130 flashcards in this deck.