Deck 7: Project Management

Full screen (f)
exit full mode
Question
________ determines the sequence for undertaking activities.
Use Space or
up arrow
down arrow
to flip the card.
Question
Scope creep is one of the primary causes of project failure.
Question
A project organization structure where team members are assigned to the project and work exclusively for the project manager is called:

A)a matrix structure.
B)a fixed structure.
C)a pure project structure.
D)a functional structure.
Question
A pure project organizational structure houses the project in a specific functional area.
Question
The ________ is a statement of all work that has to be completed.
Question
A(n)________ is an interrelated set of activities that has a definite starting and ending point and that results in a unique outcome for a specific allocation of resources.
Question
In a network diagram,an activity:

A)is the largest unit of work effort consuming both time and resources that a project manager can schedule and control.
B)is the smallest unit of work effort consuming both time and resources that a project manager can schedule and control.
C)should always be something the company has had experience with.
D)must always have a single,precise estimate for the time duration.
Question
The project's objective statement should contain:

A)slack time and activities.
B)scope,time frame,and allocated resources.
C)strengths and weaknesses of subcontractors.
D)activities,completion times,and incentives.
Question
A project is an interrelated set of activities that has a definite starting and ending point.
Question
A relationship that determines the sequence for undertaking activities is a precedence relationship.
Question
Activity times for a project are estimated by all but which of the following methods?

A)the use of dowsing rods.
B)managerial opinions based on similar prior experiences
C)statistical methods based on actual past experience
D)estimates using learning curve models to improve replications and estimate accuracy
Question
The work breakdown structure is a statement of all work that has to be completed.
Question
Heidi was part of a project team that retained their roles within the organization and was on loan to the project due to her technical expertise.In effect,she reported to two bosses,one in her functional area and also to the project manager.Heidi is operating within a(n)________ organizational structure.
Question
What characteristics should be considered when selecting project team members? Briefly describe these characteristics for members of a project team assigned to improve a teller's job in a bank.
Question
The network diagram is a planning method that is designed to depict the relationships between activities.
Question
Projects,and the application of project management,facilitate the implementation of operations strategy.
Question
Projects often cut across organizational lines.
Question
What are the primary responsibilities of a Project Manager? Briefly describe these responsibilities for a project manager whose team is purchasing a new machine and installing it in a manufacturing process.
Question
Following the project defining and organizing phase,project planning involves five steps.List and briefly describe these five planning steps as applied to writing a term paper for an Operations Management class.
Question
Project managers should be able to organize a set of disparate activities.
Question
Assume that activity G has the following times: Early start time = 7 days
Early finish time = 13 days
Late start time = 15 days
Late finish time = 21 days
Which of the following statements is TRUE about activity G?

A)Activity G takes 14 days to complete.
B)Activity G has a slack time of 8 days.
C)Activity G is on the critical path.
D)Activity G takes 2 days to complete.
Question
Fig.7.1 <strong>Fig.7.1   For the network shown in Fig.7.1,what is the project duration?</strong> A)6 B)15 C)13 D)14 <div style=padding-top: 35px>
For the network shown in Fig.7.1,what is the project duration?

A)6
B)15
C)13
D)14
Question
A critical path is any sequence of activities between a project's start and finish.
Question
Fig.7.1 <strong>Fig.7.1   For the network shown in Fig.7.1,which of the following is the critical path?</strong> A)ABCDEF B)ABEF C)ACDF D)ACEF <div style=padding-top: 35px>
For the network shown in Fig.7.1,which of the following is the critical path?

A)ABCDEF
B)ABEF
C)ACDF
D)ACEF
Question
Which one of the following best describes the critical path of a PERT/CPM network?

A)the sequence of activities between a project's start and finish that takes the longest time to complete
B)the sequence of activities between a project's start and finish that has the maximum amount of activity slack
C)the set of activities that has no precedence relationships
D)the sequence of activities that has the lowest normal activity cost
Question
Figure to accompany Table 7.1 <strong>Figure to accompany Table 7.1   Table 7.1   Refer to the Figure to accompany Table 7.1.Which one of the following is the critical path?</strong> A)ABDG B)ABEG C)ACEG D)ACFG <div style=padding-top: 35px> Table 7.1
<strong>Figure to accompany Table 7.1   Table 7.1   Refer to the Figure to accompany Table 7.1.Which one of the following is the critical path?</strong> A)ABDG B)ABEG C)ACEG D)ACFG <div style=padding-top: 35px>
Refer to the Figure to accompany Table 7.1.Which one of the following is the critical path?

A)ABDG
B)ABEG
C)ACEG
D)ACFG
Question
The ________ is the sequence of activities between a project's start and finish that takes the longest time to complete.
Question
Figure to accompany Table 7.1 <strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the activity time for activity F?</strong> A)5 B)11 C)6 D)1 <div style=padding-top: 35px> Table 7.1
<strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the activity time for activity F?</strong> A)5 B)11 C)6 D)1 <div style=padding-top: 35px>
Using the information shown in Table 7.1,what is the activity time for activity F?

A)5
B)11
C)6
D)1
Question
Which one of the following conditions violates the assumptions of PERT/CPM networks?

A)Some activities can have zero variance.
B)Costs increase linearly as activity time is reduced below its normal time.
C)Two activities tied together by an arc are overlapping and can be worked on simultaneously.
D)There can be more than one critical path in a network.
Question
The earliest start time is never the same as the latest start time.
Question
Figure to accompany Table 7.1 <strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the latest start time for activity E?</strong> A)2 B)3 C)5 D)8 <div style=padding-top: 35px> Table 7.1
<strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the latest start time for activity E?</strong> A)2 B)3 C)5 D)8 <div style=padding-top: 35px>
Using the information shown in Table 7.1,what is the latest start time for activity E?

A)2
B)3
C)5
D)8
Question
Figure to accompany Table 7.1 <strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the slack time for activity D?</strong> A)1 B)4 C)6 D)7 <div style=padding-top: 35px> Table 7.1
<strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the slack time for activity D?</strong> A)1 B)4 C)6 D)7 <div style=padding-top: 35px>
Using the information shown in Table 7.1,what is the slack time for activity D?

A)1
B)4
C)6
D)7
Question
A project has three paths.A-B-C has a length of 25 days.A-D-C has a length of 15 days.Finally,A-E-C has a length of 20 days.Which one of the following statements is TRUE?

A)A-D-C is the critical path.
B)A-B-C has the most slack.
C)The expected duration of this project is 25 days.
D)The expected duration of this project is 25 + 15 + 20 = 60 days.
Question
To obtain the latest start and latest finish time in a network diagram,we must work forward through the network.
Question
Figure to accompany Table 7.1 <strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the project duration?</strong> A)15 B)14 C)12 D)10 <div style=padding-top: 35px> Table 7.1
<strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the project duration?</strong> A)15 B)14 C)12 D)10 <div style=padding-top: 35px>
Using the information shown in Table 7.1,what is the project duration?

A)15
B)14
C)12
D)10
Question
A Gantt chart is a project schedule that superimposes project activities on a time line.
Question
Activity slack is defined as:

A)latest start time minus earliest start time.
B)earliest start time minus latest start time.
C)earliest finish time minus latest finish time.
D)latest finish time minus earliest start time.
Question
Fig.7.2 <strong>Fig.7.2   Which one of the following statements regarding Figure 7.2 is TRUE?</strong> A)Activity S cannot finish until activity T finishes. B)Activity T cannot begin until activity U is completed. C)Activity U cannot begin until activities S and T have been completed. D)Activity V cannot begin until activity S has been completed. <div style=padding-top: 35px> Which one of the following statements regarding Figure 7.2 is TRUE?

A)Activity S cannot finish until activity T finishes.
B)Activity T cannot begin until activity U is completed.
C)Activity U cannot begin until activities S and T have been completed.
D)Activity V cannot begin until activity S has been completed.
Question
Figure to accompany Table 7.1 <strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the earliest finish time for activity A?</strong> A)0 B)2 C)3 D)4 <div style=padding-top: 35px> Table 7.1
<strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the earliest finish time for activity A?</strong> A)0 B)2 C)3 D)4 <div style=padding-top: 35px>
Using the information shown in Table 7.1,what is the earliest finish time for activity A?

A)0
B)2
C)3
D)4
Question
The earliest start time for an activity is equal to the:

A)smallest earliest finish time of all of its immediate predecessors.
B)largest earliest finish time of all of its immediate predecessors.
C)smallest late start time of any of its immediate predecessors.
D)largest late finish time of all of its immediate predecessors.
Question
Table 7.4
<strong>Table 7.4   Using Table 7.4,what is the minimum number of activities that would have to be crashed to cause a decrease in the project's earliest completion date?</strong> A)one activity B)two activities C)three activities D)four or more activities <div style=padding-top: 35px>
Using Table 7.4,what is the minimum number of activities that would have to be crashed to cause a decrease in the project's earliest completion date?

A)one activity
B)two activities
C)three activities
D)four or more activities
Question
Table 7.5
<strong>Table 7.5   Using Table 7.5,what is the latest start time for activity E?</strong> A)day 8 B)day 10 C)day 12 D)day 14 <div style=padding-top: 35px>
Using Table 7.5,what is the latest start time for activity E?

A)day 8
B)day 10
C)day 12
D)day 14
Question
Why do managers want to know the slack of activities?
Question
Disaster strikes and activity F takes 20 days instead of the anticipated 5 days.Using Table 7.5,how much longer will the project last than initially estimated?

A)15 days
B)0 days
C)7 days
D)3 days
Question
Table 7.4
<strong>Table 7.4   Using Table 7.4,what is the minimum number of activities that would have to be delayed to cause an increase in the project's earliest completion date?</strong> A)one activity B)two activities C)three activities D)four or more activities <div style=padding-top: 35px>
Using Table 7.4,what is the minimum number of activities that would have to be delayed to cause an increase in the project's earliest completion date?

A)one activity
B)two activities
C)three activities
D)four or more activities
Question
Table 7.5
<strong>Table 7.5   Using Table 7.5,what is the earliest completion time of this project?</strong> A)23 days B)25 days C)27 days D)29 days <div style=padding-top: 35px>
Using Table 7.5,what is the earliest completion time of this project?

A)23 days
B)25 days
C)27 days
D)29 days
Question
The normal cost is the amount of money it normally takes to complete an activity faster than its normal time.
Question
Table 7.4
<strong>Table 7.4   Using Table 7.4,what is the slack associated with activity B?</strong> A)1 week B)2 weeks C)3 weeks D)None of these is the correct activity slack for B. <div style=padding-top: 35px>
Using Table 7.4,what is the slack associated with activity B?

A)1 week
B)2 weeks
C)3 weeks
D)None of these is the correct activity slack for B.
Question
Consider a project that consists of three consecutive activities of equal length as shown in the network diagram.The project manager would like to complete the project as quickly as possible and realizes that the diagram's logic is misleading.Instead of waiting until activity A is completed before activity B can begin,he can actually begin activity B once activity A has begun.The same reasoning holds for the relationship between activity B and activity C.The project manager decides to divide each activity in half,a technique known as "laddering".The second diagram shows the new network logic.In this diagram,activity A is divided into activity A1 and A2 where A1 must be finished before A2 can begin and before B1 can begin.The manager still isn't satisfied with the completion time of the project.Derive an expression or draw a diagram that demonstrates the fastest possible completion time of the project. Consider a project that consists of three consecutive activities of equal length as shown in the network diagram.The project manager would like to complete the project as quickly as possible and realizes that the diagram's logic is misleading.Instead of waiting until activity A is completed before activity B can begin,he can actually begin activity B once activity A has begun.The same reasoning holds for the relationship between activity B and activity C.The project manager decides to divide each activity in half,a technique known as laddering.The second diagram shows the new network logic.In this diagram,activity A is divided into activity A1 and A2 where A1 must be finished before A2 can begin and before B1 can begin.The manager still isn't satisfied with the completion time of the project.Derive an expression or draw a diagram that demonstrates the fastest possible completion time of the project.  <div style=padding-top: 35px>
Question
Table 7.5
<strong>Table 7.5   Using Table 7.5,what is the earliest that activity D can be finished?</strong> A)18 days B)8 days C)13 days D)25 days <div style=padding-top: 35px>
Using Table 7.5,what is the earliest that activity D can be finished?

A)18 days
B)8 days
C)13 days
D)25 days
Question
Phoebe B.Beebee is constructing a canal for the annual canoe races and has identified eleven activities that are required to complete this important project.She calculated early and late start times and early and late finish times but spilled coffee all over her printout.Use the remaining information to reconstruct the table for Phoebe B.Beebee and her new canoe canal.
Phoebe B.Beebee is constructing a canal for the annual canoe races and has identified eleven activities that are required to complete this important project.She calculated early and late start times and early and late finish times but spilled coffee all over her printout.Use the remaining information to reconstruct the table for Phoebe B.Beebee and her new canoe canal.  <div style=padding-top: 35px>
Question
Draw the network corresponding to the following information.Also,complete the table,identify the critical path,and specify project completion time.
Draw the network corresponding to the following information.Also,complete the table,identify the critical path,and specify project completion time.    <div style=padding-top: 35px> Draw the network corresponding to the following information.Also,complete the table,identify the critical path,and specify project completion time.    <div style=padding-top: 35px>
Question
Table 7.4
<strong>Table 7.4   Using Table 7.4,what is the largest amount of slack that any activity in the project has?</strong> A)zero weeks B)two weeks C)four weeks D)six weeks <div style=padding-top: 35px>
Using Table 7.4,what is the largest amount of slack that any activity in the project has?

A)zero weeks
B)two weeks
C)four weeks
D)six weeks
Question
Explain the importance of the critical path in project management.
Question
Using Table 7.5,every day the construction crew is on-site costs $1000.What activities would you consider crashing to reduce the project completion cost?

A)Activity E
B)Activity F
C)Activity G
D)All of these activities would be candidates for crashing.
Question
Table 7.4
<strong>Table 7.4   Using Table 7.4,what is the early start time for activity D?</strong> A)week 9 B)week 4 C)week 7 D)week 0 <div style=padding-top: 35px>
Using Table 7.4,what is the early start time for activity D?

A)week 9
B)week 4
C)week 7
D)week 0
Question
Table 7.4
<strong>Table 7.4   Using Table 7.4,what is the latest finish time for activity C?</strong> A)week 4 B)week 6 C)week 8 D)week 10 <div style=padding-top: 35px>
Using Table 7.4,what is the latest finish time for activity C?

A)week 4
B)week 6
C)week 8
D)week 10
Question
________ is the maximum length of time that an activity can be delayed without delaying the entire project.
Question
Table 7.4
<strong>Table 7.4   Using Table 7.4,what is the earliest completion time for this project?</strong> A)18 weeks B)19 weeks C)20 weeks D)21 weeks <div style=padding-top: 35px>
Using Table 7.4,what is the earliest completion time for this project?

A)18 weeks
B)19 weeks
C)20 weeks
D)21 weeks
Question
A project manager should stop crashing a project if the time budget has been met or if the crash costs have exceeded the savings in indirect and penalty costs.
Question
Table 7.8
<strong>Table 7.8   Using Table 7.8,what is the latest start time for activity E?</strong> A)day 7 B)day 8 C)day 9 D)day 10 <div style=padding-top: 35px>
Using Table 7.8,what is the latest start time for activity E?

A)day 7
B)day 8
C)day 9
D)day 10
Question
Table 7.6
<strong>Table 7.6   Using Table 7.6,what is the critical path for this project?</strong> A)B-E-H-K B)B-E-H-J C)A-E-G-J D)C-F-I-L <div style=padding-top: 35px>
Using Table 7.6,what is the critical path for this project?

A)B-E-H-K
B)B-E-H-J
C)A-E-G-J
D)C-F-I-L
Question
Table 7.6
<strong>Table 7.6   Using Table 7.6,suppose activity I is delayed,taking eight days to complete instead of two days.Assume all other activity times remain the same.How much longer will the total project earliest completion time become?</strong> A)zero days B)one or two days C)three or four days D)five or six days <div style=padding-top: 35px>
Using Table 7.6,suppose activity I is delayed,taking eight days to complete instead of two days.Assume all other activity times remain the same.How much longer will the total project earliest completion time become?

A)zero days
B)one or two days
C)three or four days
D)five or six days
Question
Table 7.6
<strong>Table 7.6   Using Table 7.6,suppose activity D can be shortened from four days to one day.Assume all other activity times remain the same.How much shorter will the total project earliest completion time become?</strong> A)zero days B)one day C)two days D)three days <div style=padding-top: 35px>
Using Table 7.6,suppose activity D can be shortened from four days to one day.Assume all other activity times remain the same.How much shorter will the total project earliest completion time become?

A)zero days
B)one day
C)two days
D)three days
Question
Table 7.8
<strong>Table 7.8   Using Table 7.8,what is the minimum crashing cost to finish this project in 18 days?</strong> A)$3,450 B)$850 C)$1,150 D)$1,500 <div style=padding-top: 35px>
Using Table 7.8,what is the minimum crashing cost to finish this project in 18 days?

A)$3,450
B)$850
C)$1,150
D)$1,500
Question
How many week(s)of crashing are available for activity B in Table 7.7?

A)0
B)1
C)2
D)3
Question
Using Table 7.5,how many days can activity C be delayed without changing the whole project's earliest completion time?

A)0 days
B)2 days
C)5 days
D)7 days
Question
What is the crashing cost per week for activity A in Table 7.7?

A)$2,000
B)$3,000
C)$4,000
D)This activity cannot be crashed.
Question
Table 7.8
<strong>Table 7.8   Using Table 7.8,what is the minimum completion time for this project after crashing?</strong> A)23 days B)21 days C)19 days D)17 days <div style=padding-top: 35px>
Using Table 7.8,what is the minimum completion time for this project after crashing?

A)23 days
B)21 days
C)19 days
D)17 days
Question
What is the crashing cost per week for activity F in Table 7.7?

A)$2,000
B)$3,000
C)$4,000
D)This activity cannot be crashed.
Question
Table 7.6
<strong>Table 7.6   Using Table 7.6,what is the latest start time for activity A?</strong> A)day 0 B)day 1 C)day 2 D)day 3 or later <div style=padding-top: 35px>
Using Table 7.6,what is the latest start time for activity A?

A)day 0
B)day 1
C)day 2
D)day 3 or later
Question
What is the crashing cost per week for activity E in Table 7.7?

A)$1,000
B)$2,000
C)$3,000
D)This activity cannot be crashed.
Question
If a decision is made to crash activity D in Table 7.7 by one week,what is the cost for this one week of crashing?

A)$3,000
B)$2,000
C)$2,500
D)This activity cannot be crashed.
Question
Table 7.8
<strong>Table 7.8   Using Table 7.8,what is the critical path for this project using the normal times?</strong> A)A-D-H B)C-F C)B-E-H D)B-G-H <div style=padding-top: 35px>
Using Table 7.8,what is the critical path for this project using the normal times?

A)A-D-H
B)C-F
C)B-E-H
D)B-G-H
Question
Table 7.8
<strong>Table 7.8   Using Table 7.8,what is the activity with the greatest amount of slack?</strong> A)A B)B C)C D)D <div style=padding-top: 35px>
Using Table 7.8,what is the activity with the greatest amount of slack?

A)A
B)B
C)C
D)D
Question
How many weeks of crashing are available for activity C in Table 7.7?

A)0
B)1
C)2
D)6
Question
Which activity should be crashed first for the project shown in Table 7.7?

A)A
B)B
C)C
D)D
Question
Figure to accompany Table 7.7 <strong>Figure to accompany Table 7.7   Table 7.7   What is the critical path for the project shown in the above network and Table 7.7,using the normal times?</strong> A)A-B-D-F B)A-C-D-F C)A-C-E-F D)A-B-C-D-E-F <div style=padding-top: 35px> Table 7.7
<strong>Figure to accompany Table 7.7   Table 7.7   What is the critical path for the project shown in the above network and Table 7.7,using the normal times?</strong> A)A-B-D-F B)A-C-D-F C)A-C-E-F D)A-B-C-D-E-F <div style=padding-top: 35px>
What is the critical path for the project shown in the above network and Table 7.7,using the normal times?

A)A-B-D-F
B)A-C-D-F
C)A-C-E-F
D)A-B-C-D-E-F
Question
Table 7.8
<strong>Table 7.8   Using Table 7.8,what is the earliest possible completion time for activity E after crashing?</strong> A)day 11 B)day 13 C)day 15 D)day 17 <div style=padding-top: 35px>
Using Table 7.8,what is the earliest possible completion time for activity E after crashing?

A)day 11
B)day 13
C)day 15
D)day 17
Question
Determine the information missing from Table 7.7;then answer the following questions.How many week(s)of crashing are available for activity D in Table 2.9?

A)0
B)1
C)2
D)6
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/140
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 7: Project Management
1
________ determines the sequence for undertaking activities.
Precedence relationship
2
Scope creep is one of the primary causes of project failure.
True
3
A project organization structure where team members are assigned to the project and work exclusively for the project manager is called:

A)a matrix structure.
B)a fixed structure.
C)a pure project structure.
D)a functional structure.
C
4
A pure project organizational structure houses the project in a specific functional area.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
5
The ________ is a statement of all work that has to be completed.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
6
A(n)________ is an interrelated set of activities that has a definite starting and ending point and that results in a unique outcome for a specific allocation of resources.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
7
In a network diagram,an activity:

A)is the largest unit of work effort consuming both time and resources that a project manager can schedule and control.
B)is the smallest unit of work effort consuming both time and resources that a project manager can schedule and control.
C)should always be something the company has had experience with.
D)must always have a single,precise estimate for the time duration.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
8
The project's objective statement should contain:

A)slack time and activities.
B)scope,time frame,and allocated resources.
C)strengths and weaknesses of subcontractors.
D)activities,completion times,and incentives.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
9
A project is an interrelated set of activities that has a definite starting and ending point.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
10
A relationship that determines the sequence for undertaking activities is a precedence relationship.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
11
Activity times for a project are estimated by all but which of the following methods?

A)the use of dowsing rods.
B)managerial opinions based on similar prior experiences
C)statistical methods based on actual past experience
D)estimates using learning curve models to improve replications and estimate accuracy
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
12
The work breakdown structure is a statement of all work that has to be completed.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
13
Heidi was part of a project team that retained their roles within the organization and was on loan to the project due to her technical expertise.In effect,she reported to two bosses,one in her functional area and also to the project manager.Heidi is operating within a(n)________ organizational structure.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
14
What characteristics should be considered when selecting project team members? Briefly describe these characteristics for members of a project team assigned to improve a teller's job in a bank.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
15
The network diagram is a planning method that is designed to depict the relationships between activities.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
16
Projects,and the application of project management,facilitate the implementation of operations strategy.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
17
Projects often cut across organizational lines.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
18
What are the primary responsibilities of a Project Manager? Briefly describe these responsibilities for a project manager whose team is purchasing a new machine and installing it in a manufacturing process.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
19
Following the project defining and organizing phase,project planning involves five steps.List and briefly describe these five planning steps as applied to writing a term paper for an Operations Management class.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
20
Project managers should be able to organize a set of disparate activities.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
21
Assume that activity G has the following times: Early start time = 7 days
Early finish time = 13 days
Late start time = 15 days
Late finish time = 21 days
Which of the following statements is TRUE about activity G?

A)Activity G takes 14 days to complete.
B)Activity G has a slack time of 8 days.
C)Activity G is on the critical path.
D)Activity G takes 2 days to complete.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
22
Fig.7.1 <strong>Fig.7.1   For the network shown in Fig.7.1,what is the project duration?</strong> A)6 B)15 C)13 D)14
For the network shown in Fig.7.1,what is the project duration?

A)6
B)15
C)13
D)14
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
23
A critical path is any sequence of activities between a project's start and finish.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
24
Fig.7.1 <strong>Fig.7.1   For the network shown in Fig.7.1,which of the following is the critical path?</strong> A)ABCDEF B)ABEF C)ACDF D)ACEF
For the network shown in Fig.7.1,which of the following is the critical path?

A)ABCDEF
B)ABEF
C)ACDF
D)ACEF
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
25
Which one of the following best describes the critical path of a PERT/CPM network?

A)the sequence of activities between a project's start and finish that takes the longest time to complete
B)the sequence of activities between a project's start and finish that has the maximum amount of activity slack
C)the set of activities that has no precedence relationships
D)the sequence of activities that has the lowest normal activity cost
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
26
Figure to accompany Table 7.1 <strong>Figure to accompany Table 7.1   Table 7.1   Refer to the Figure to accompany Table 7.1.Which one of the following is the critical path?</strong> A)ABDG B)ABEG C)ACEG D)ACFG Table 7.1
<strong>Figure to accompany Table 7.1   Table 7.1   Refer to the Figure to accompany Table 7.1.Which one of the following is the critical path?</strong> A)ABDG B)ABEG C)ACEG D)ACFG
Refer to the Figure to accompany Table 7.1.Which one of the following is the critical path?

A)ABDG
B)ABEG
C)ACEG
D)ACFG
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
27
The ________ is the sequence of activities between a project's start and finish that takes the longest time to complete.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
28
Figure to accompany Table 7.1 <strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the activity time for activity F?</strong> A)5 B)11 C)6 D)1 Table 7.1
<strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the activity time for activity F?</strong> A)5 B)11 C)6 D)1
Using the information shown in Table 7.1,what is the activity time for activity F?

A)5
B)11
C)6
D)1
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
29
Which one of the following conditions violates the assumptions of PERT/CPM networks?

A)Some activities can have zero variance.
B)Costs increase linearly as activity time is reduced below its normal time.
C)Two activities tied together by an arc are overlapping and can be worked on simultaneously.
D)There can be more than one critical path in a network.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
30
The earliest start time is never the same as the latest start time.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
31
Figure to accompany Table 7.1 <strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the latest start time for activity E?</strong> A)2 B)3 C)5 D)8 Table 7.1
<strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the latest start time for activity E?</strong> A)2 B)3 C)5 D)8
Using the information shown in Table 7.1,what is the latest start time for activity E?

A)2
B)3
C)5
D)8
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
32
Figure to accompany Table 7.1 <strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the slack time for activity D?</strong> A)1 B)4 C)6 D)7 Table 7.1
<strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the slack time for activity D?</strong> A)1 B)4 C)6 D)7
Using the information shown in Table 7.1,what is the slack time for activity D?

A)1
B)4
C)6
D)7
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
33
A project has three paths.A-B-C has a length of 25 days.A-D-C has a length of 15 days.Finally,A-E-C has a length of 20 days.Which one of the following statements is TRUE?

A)A-D-C is the critical path.
B)A-B-C has the most slack.
C)The expected duration of this project is 25 days.
D)The expected duration of this project is 25 + 15 + 20 = 60 days.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
34
To obtain the latest start and latest finish time in a network diagram,we must work forward through the network.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
35
Figure to accompany Table 7.1 <strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the project duration?</strong> A)15 B)14 C)12 D)10 Table 7.1
<strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the project duration?</strong> A)15 B)14 C)12 D)10
Using the information shown in Table 7.1,what is the project duration?

A)15
B)14
C)12
D)10
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
36
A Gantt chart is a project schedule that superimposes project activities on a time line.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
37
Activity slack is defined as:

A)latest start time minus earliest start time.
B)earliest start time minus latest start time.
C)earliest finish time minus latest finish time.
D)latest finish time minus earliest start time.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
38
Fig.7.2 <strong>Fig.7.2   Which one of the following statements regarding Figure 7.2 is TRUE?</strong> A)Activity S cannot finish until activity T finishes. B)Activity T cannot begin until activity U is completed. C)Activity U cannot begin until activities S and T have been completed. D)Activity V cannot begin until activity S has been completed. Which one of the following statements regarding Figure 7.2 is TRUE?

A)Activity S cannot finish until activity T finishes.
B)Activity T cannot begin until activity U is completed.
C)Activity U cannot begin until activities S and T have been completed.
D)Activity V cannot begin until activity S has been completed.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
39
Figure to accompany Table 7.1 <strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the earliest finish time for activity A?</strong> A)0 B)2 C)3 D)4 Table 7.1
<strong>Figure to accompany Table 7.1   Table 7.1   Using the information shown in Table 7.1,what is the earliest finish time for activity A?</strong> A)0 B)2 C)3 D)4
Using the information shown in Table 7.1,what is the earliest finish time for activity A?

A)0
B)2
C)3
D)4
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
40
The earliest start time for an activity is equal to the:

A)smallest earliest finish time of all of its immediate predecessors.
B)largest earliest finish time of all of its immediate predecessors.
C)smallest late start time of any of its immediate predecessors.
D)largest late finish time of all of its immediate predecessors.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
41
Table 7.4
<strong>Table 7.4   Using Table 7.4,what is the minimum number of activities that would have to be crashed to cause a decrease in the project's earliest completion date?</strong> A)one activity B)two activities C)three activities D)four or more activities
Using Table 7.4,what is the minimum number of activities that would have to be crashed to cause a decrease in the project's earliest completion date?

A)one activity
B)two activities
C)three activities
D)four or more activities
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
42
Table 7.5
<strong>Table 7.5   Using Table 7.5,what is the latest start time for activity E?</strong> A)day 8 B)day 10 C)day 12 D)day 14
Using Table 7.5,what is the latest start time for activity E?

A)day 8
B)day 10
C)day 12
D)day 14
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
43
Why do managers want to know the slack of activities?
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
44
Disaster strikes and activity F takes 20 days instead of the anticipated 5 days.Using Table 7.5,how much longer will the project last than initially estimated?

A)15 days
B)0 days
C)7 days
D)3 days
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
45
Table 7.4
<strong>Table 7.4   Using Table 7.4,what is the minimum number of activities that would have to be delayed to cause an increase in the project's earliest completion date?</strong> A)one activity B)two activities C)three activities D)four or more activities
Using Table 7.4,what is the minimum number of activities that would have to be delayed to cause an increase in the project's earliest completion date?

A)one activity
B)two activities
C)three activities
D)four or more activities
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
46
Table 7.5
<strong>Table 7.5   Using Table 7.5,what is the earliest completion time of this project?</strong> A)23 days B)25 days C)27 days D)29 days
Using Table 7.5,what is the earliest completion time of this project?

A)23 days
B)25 days
C)27 days
D)29 days
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
47
The normal cost is the amount of money it normally takes to complete an activity faster than its normal time.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
48
Table 7.4
<strong>Table 7.4   Using Table 7.4,what is the slack associated with activity B?</strong> A)1 week B)2 weeks C)3 weeks D)None of these is the correct activity slack for B.
Using Table 7.4,what is the slack associated with activity B?

A)1 week
B)2 weeks
C)3 weeks
D)None of these is the correct activity slack for B.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
49
Consider a project that consists of three consecutive activities of equal length as shown in the network diagram.The project manager would like to complete the project as quickly as possible and realizes that the diagram's logic is misleading.Instead of waiting until activity A is completed before activity B can begin,he can actually begin activity B once activity A has begun.The same reasoning holds for the relationship between activity B and activity C.The project manager decides to divide each activity in half,a technique known as "laddering".The second diagram shows the new network logic.In this diagram,activity A is divided into activity A1 and A2 where A1 must be finished before A2 can begin and before B1 can begin.The manager still isn't satisfied with the completion time of the project.Derive an expression or draw a diagram that demonstrates the fastest possible completion time of the project. Consider a project that consists of three consecutive activities of equal length as shown in the network diagram.The project manager would like to complete the project as quickly as possible and realizes that the diagram's logic is misleading.Instead of waiting until activity A is completed before activity B can begin,he can actually begin activity B once activity A has begun.The same reasoning holds for the relationship between activity B and activity C.The project manager decides to divide each activity in half,a technique known as laddering.The second diagram shows the new network logic.In this diagram,activity A is divided into activity A1 and A2 where A1 must be finished before A2 can begin and before B1 can begin.The manager still isn't satisfied with the completion time of the project.Derive an expression or draw a diagram that demonstrates the fastest possible completion time of the project.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
50
Table 7.5
<strong>Table 7.5   Using Table 7.5,what is the earliest that activity D can be finished?</strong> A)18 days B)8 days C)13 days D)25 days
Using Table 7.5,what is the earliest that activity D can be finished?

A)18 days
B)8 days
C)13 days
D)25 days
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
51
Phoebe B.Beebee is constructing a canal for the annual canoe races and has identified eleven activities that are required to complete this important project.She calculated early and late start times and early and late finish times but spilled coffee all over her printout.Use the remaining information to reconstruct the table for Phoebe B.Beebee and her new canoe canal.
Phoebe B.Beebee is constructing a canal for the annual canoe races and has identified eleven activities that are required to complete this important project.She calculated early and late start times and early and late finish times but spilled coffee all over her printout.Use the remaining information to reconstruct the table for Phoebe B.Beebee and her new canoe canal.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
52
Draw the network corresponding to the following information.Also,complete the table,identify the critical path,and specify project completion time.
Draw the network corresponding to the following information.Also,complete the table,identify the critical path,and specify project completion time.    Draw the network corresponding to the following information.Also,complete the table,identify the critical path,and specify project completion time.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
53
Table 7.4
<strong>Table 7.4   Using Table 7.4,what is the largest amount of slack that any activity in the project has?</strong> A)zero weeks B)two weeks C)four weeks D)six weeks
Using Table 7.4,what is the largest amount of slack that any activity in the project has?

A)zero weeks
B)two weeks
C)four weeks
D)six weeks
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
54
Explain the importance of the critical path in project management.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
55
Using Table 7.5,every day the construction crew is on-site costs $1000.What activities would you consider crashing to reduce the project completion cost?

A)Activity E
B)Activity F
C)Activity G
D)All of these activities would be candidates for crashing.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
56
Table 7.4
<strong>Table 7.4   Using Table 7.4,what is the early start time for activity D?</strong> A)week 9 B)week 4 C)week 7 D)week 0
Using Table 7.4,what is the early start time for activity D?

A)week 9
B)week 4
C)week 7
D)week 0
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
57
Table 7.4
<strong>Table 7.4   Using Table 7.4,what is the latest finish time for activity C?</strong> A)week 4 B)week 6 C)week 8 D)week 10
Using Table 7.4,what is the latest finish time for activity C?

A)week 4
B)week 6
C)week 8
D)week 10
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
58
________ is the maximum length of time that an activity can be delayed without delaying the entire project.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
59
Table 7.4
<strong>Table 7.4   Using Table 7.4,what is the earliest completion time for this project?</strong> A)18 weeks B)19 weeks C)20 weeks D)21 weeks
Using Table 7.4,what is the earliest completion time for this project?

A)18 weeks
B)19 weeks
C)20 weeks
D)21 weeks
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
60
A project manager should stop crashing a project if the time budget has been met or if the crash costs have exceeded the savings in indirect and penalty costs.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
61
Table 7.8
<strong>Table 7.8   Using Table 7.8,what is the latest start time for activity E?</strong> A)day 7 B)day 8 C)day 9 D)day 10
Using Table 7.8,what is the latest start time for activity E?

A)day 7
B)day 8
C)day 9
D)day 10
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
62
Table 7.6
<strong>Table 7.6   Using Table 7.6,what is the critical path for this project?</strong> A)B-E-H-K B)B-E-H-J C)A-E-G-J D)C-F-I-L
Using Table 7.6,what is the critical path for this project?

A)B-E-H-K
B)B-E-H-J
C)A-E-G-J
D)C-F-I-L
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
63
Table 7.6
<strong>Table 7.6   Using Table 7.6,suppose activity I is delayed,taking eight days to complete instead of two days.Assume all other activity times remain the same.How much longer will the total project earliest completion time become?</strong> A)zero days B)one or two days C)three or four days D)five or six days
Using Table 7.6,suppose activity I is delayed,taking eight days to complete instead of two days.Assume all other activity times remain the same.How much longer will the total project earliest completion time become?

A)zero days
B)one or two days
C)three or four days
D)five or six days
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
64
Table 7.6
<strong>Table 7.6   Using Table 7.6,suppose activity D can be shortened from four days to one day.Assume all other activity times remain the same.How much shorter will the total project earliest completion time become?</strong> A)zero days B)one day C)two days D)three days
Using Table 7.6,suppose activity D can be shortened from four days to one day.Assume all other activity times remain the same.How much shorter will the total project earliest completion time become?

A)zero days
B)one day
C)two days
D)three days
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
65
Table 7.8
<strong>Table 7.8   Using Table 7.8,what is the minimum crashing cost to finish this project in 18 days?</strong> A)$3,450 B)$850 C)$1,150 D)$1,500
Using Table 7.8,what is the minimum crashing cost to finish this project in 18 days?

A)$3,450
B)$850
C)$1,150
D)$1,500
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
66
How many week(s)of crashing are available for activity B in Table 7.7?

A)0
B)1
C)2
D)3
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
67
Using Table 7.5,how many days can activity C be delayed without changing the whole project's earliest completion time?

A)0 days
B)2 days
C)5 days
D)7 days
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
68
What is the crashing cost per week for activity A in Table 7.7?

A)$2,000
B)$3,000
C)$4,000
D)This activity cannot be crashed.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
69
Table 7.8
<strong>Table 7.8   Using Table 7.8,what is the minimum completion time for this project after crashing?</strong> A)23 days B)21 days C)19 days D)17 days
Using Table 7.8,what is the minimum completion time for this project after crashing?

A)23 days
B)21 days
C)19 days
D)17 days
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
70
What is the crashing cost per week for activity F in Table 7.7?

A)$2,000
B)$3,000
C)$4,000
D)This activity cannot be crashed.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
71
Table 7.6
<strong>Table 7.6   Using Table 7.6,what is the latest start time for activity A?</strong> A)day 0 B)day 1 C)day 2 D)day 3 or later
Using Table 7.6,what is the latest start time for activity A?

A)day 0
B)day 1
C)day 2
D)day 3 or later
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
72
What is the crashing cost per week for activity E in Table 7.7?

A)$1,000
B)$2,000
C)$3,000
D)This activity cannot be crashed.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
73
If a decision is made to crash activity D in Table 7.7 by one week,what is the cost for this one week of crashing?

A)$3,000
B)$2,000
C)$2,500
D)This activity cannot be crashed.
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
74
Table 7.8
<strong>Table 7.8   Using Table 7.8,what is the critical path for this project using the normal times?</strong> A)A-D-H B)C-F C)B-E-H D)B-G-H
Using Table 7.8,what is the critical path for this project using the normal times?

A)A-D-H
B)C-F
C)B-E-H
D)B-G-H
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
75
Table 7.8
<strong>Table 7.8   Using Table 7.8,what is the activity with the greatest amount of slack?</strong> A)A B)B C)C D)D
Using Table 7.8,what is the activity with the greatest amount of slack?

A)A
B)B
C)C
D)D
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
76
How many weeks of crashing are available for activity C in Table 7.7?

A)0
B)1
C)2
D)6
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
77
Which activity should be crashed first for the project shown in Table 7.7?

A)A
B)B
C)C
D)D
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
78
Figure to accompany Table 7.7 <strong>Figure to accompany Table 7.7   Table 7.7   What is the critical path for the project shown in the above network and Table 7.7,using the normal times?</strong> A)A-B-D-F B)A-C-D-F C)A-C-E-F D)A-B-C-D-E-F Table 7.7
<strong>Figure to accompany Table 7.7   Table 7.7   What is the critical path for the project shown in the above network and Table 7.7,using the normal times?</strong> A)A-B-D-F B)A-C-D-F C)A-C-E-F D)A-B-C-D-E-F
What is the critical path for the project shown in the above network and Table 7.7,using the normal times?

A)A-B-D-F
B)A-C-D-F
C)A-C-E-F
D)A-B-C-D-E-F
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
79
Table 7.8
<strong>Table 7.8   Using Table 7.8,what is the earliest possible completion time for activity E after crashing?</strong> A)day 11 B)day 13 C)day 15 D)day 17
Using Table 7.8,what is the earliest possible completion time for activity E after crashing?

A)day 11
B)day 13
C)day 15
D)day 17
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
80
Determine the information missing from Table 7.7;then answer the following questions.How many week(s)of crashing are available for activity D in Table 2.9?

A)0
B)1
C)2
D)6
Unlock Deck
Unlock for access to all 140 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 140 flashcards in this deck.