Deck 17: Maintenance and Reliability
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/130
Play
Full screen (f)
Deck 17: Maintenance and Reliability
1
Preventive maintenance implies that we can determine when a system needs service or will need repair.
True
2
Failures are tolerable as long as their results are not catastrophic.
False
3
Small standard deviations in the MTBF distribution of a machine tend to support a policy of breakdown maintenance for that machine.
False
4
The reliability of a system in which each individual component must function in order for the entire system to function,and in which each component has its own unique reliability,independent of other components,is the product of the probabilities of each of those components.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
5
Preventive maintenance is reactive.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
6
Maintenance includes all activities involved in keeping a system's equipment in working order.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
7
The product failure rate is the percentage of failures among the total number of products tested.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
8
If the mean time between failures has been calculated to be 2,000 hours,then FR(N)= 0.0005 failures/unit-hour.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
9
A redundant part decreases reliability if the reliability of the redundant part is lower than that of the part it is backing up.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
10
The Pickering Nuclear Power Station in Ontario uses a proper maintenance management program,and devotes significant dollar and labour resources to power plant maintenance,because the costs of unexpected failure are incredibly high.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
11
Infant mortality refers to the high failure rate often encountered in the very early stages of the lifetime of a product.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
12
The MTBF distributions of products,machines,or processes that have "settled in," or gone beyond the infant mortality phase,often follow the normal distribution.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
13
A redundant part or component increases reliability because it is connected in parallel,not in series.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
14
Reliability is the probability that a machine part or product will function properly for a specified time regardless of conditions.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
15
Preventive maintenance is nothing more than keeping the equipment and machinery running.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
16
Recording the maintenance history of processes,machines,or equipment is important for preventive maintenance,but largely irrelevant for breakdown maintenance.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
17
The MTBF (mean time between failures)is calculated as the reciprocal of the number of failures during a period of time.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
18
When identifying the optimal maintenance policy,the cost of inventory maintained to compensate for the downtime is a cost often ignored.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
19
Adding an additional part to a component or product ordinarily reduces reliability by introducing an additional source of failure.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
20
The "full cost view of maintenance" results in more firms choosing a policy of breakdown maintenance,when compared to the "traditional view of maintenance."
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
21
The objective of maintenance and reliability is to
A)ensure that breakdowns do not affect the quality of the products.
B)ensure that no breakdowns will ever occur.
C)ensure that preventive maintenance costs are kept as low as possible.
D)maintain the capability of the system.
E)ensure that maintenance employees are fully utilized.
A)ensure that breakdowns do not affect the quality of the products.
B)ensure that no breakdowns will ever occur.
C)ensure that preventive maintenance costs are kept as low as possible.
D)maintain the capability of the system.
E)ensure that maintenance employees are fully utilized.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
22
An optimal maintenance policy strikes a balance between the costs of breakdown and preventive maintenance so that the total cost of maintenance is at a minimum.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
23
Which of the following is a reliability tactic?
A)improving individual components
B)increasing repair speed
C)providing redundancy
D)A and C
E)A,B,and C
A)improving individual components
B)increasing repair speed
C)providing redundancy
D)A and C
E)A,B,and C
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
24
The probability that a product will function properly for a specified time under stated conditions is
A)functionality.
B)maintenance.
C)durability.
D)reliability.
E)fitness for use.
A)functionality.
B)maintenance.
C)durability.
D)reliability.
E)fitness for use.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
25
A product has three components,A,B,and C,with reliabilities of 0.95,0.98,and 0.995.Engineers intend to put a redundant component A that has reliability 0.70.With this change,system reliability will
A)fall by 20%.
B)fall by 10% or less.
C)rise.
D)cannot determine from the information provided.
E)none of the above.
A)fall by 20%.
B)fall by 10% or less.
C)rise.
D)cannot determine from the information provided.
E)none of the above.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
26
A system has three components in parallel with reliabilities 0.9,0.7,and 0.5.System reliability is
A)0.315.
B)0.700.
C)0.900.
D)0.985.
E)2.100.
A)0.315.
B)0.700.
C)0.900.
D)0.985.
E)2.100.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
27
Components A,B,and C are connected in series.Component D is connected in parallel to component B.Which of the following statements is true?
A)The system works only if A works,B or C works,and D works.
B)Component B must work for the system to work.
C)The system works when A works,C,works,and either B or D works.
D)Components B and C are backups to A.
E)The system works if D works,and any of A,B,or C works.
A)The system works only if A works,B or C works,and D works.
B)Component B must work for the system to work.
C)The system works when A works,C,works,and either B or D works.
D)Components B and C are backups to A.
E)The system works if D works,and any of A,B,or C works.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
28
As the number of components in a system connected in a series decreases,all other things being equal,the reliability of the system usually
A)increases.
B)stays the same.
C)decreases.
D)increases,then decreases.
E)decreases,then increases.
A)increases.
B)stays the same.
C)decreases.
D)increases,then decreases.
E)decreases,then increases.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
29
A system is composed of three components A,B,and C.All three must function for the system to function.There are currently no backups in place.The system has a reliability of 0.966.If a backup is installed for component A,the new system reliability will be
A)unchanged.
B)less than 0.966.
C)greater than it would be if a backup were also installed for component B.
D)greater than 0.966.
E)equal to exactly 0.966.
A)unchanged.
B)less than 0.966.
C)greater than it would be if a backup were also installed for component B.
D)greater than 0.966.
E)equal to exactly 0.966.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
30
A system has three components in series with reliabilities 0.9,0.7,and 0.5.System reliability is
A)0.315.
B)0.500.
C)0.700.
D)0.900.
E)2.100.
A)0.315.
B)0.500.
C)0.700.
D)0.900.
E)2.100.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
31
Consider a product with three components in series,with reliabilities of 0.90,0.80,and 0.99 for components A,B,and C,respectively.Furthermore,component B uses a backup that also has a reliability of 0.80.What is the reliability of the system?
A)0.50000
B)0.71280
C)0.80000
D)0.85536
E)3.49000
A)0.50000
B)0.71280
C)0.80000
D)0.85536
E)3.49000
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
32
While breakdowns occur randomly,their frequency is somewhat predictable through such tools as the product failure rate,MTBF,and the breakdown costs model.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
33
Simulation models and expert systems are useful tools for enhancing maintenance.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
34
What is the reliability of a four-component product,with components in series,and component reliabilities of .90,.95,.98,and .99?
A)under 0.83
B)0.90
C)0.955
D)no less than .99
E)none of the above
A)under 0.83
B)0.90
C)0.955
D)no less than .99
E)none of the above
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
35
Which of the following statements about maintenance at the Pickering Nuclear Station is false?
A)This approach to maintenance contributes to the facility's excellent record of reliability.
B)All of the nuclear units linked to the vacuum building must be shut down to carry out inspection at the vacuum building.
C)Springtime is chosen as the right time to undertake this inspection due to the lower demand for electricity at that time,compared to winter and summer.
D)It does not provide the province of Ontario with any significant amount of electricity supply.
E)Costs associated with interruptions are several times higher than costs arising from preventive maintenance.
A)This approach to maintenance contributes to the facility's excellent record of reliability.
B)All of the nuclear units linked to the vacuum building must be shut down to carry out inspection at the vacuum building.
C)Springtime is chosen as the right time to undertake this inspection due to the lower demand for electricity at that time,compared to winter and summer.
D)It does not provide the province of Ontario with any significant amount of electricity supply.
E)Costs associated with interruptions are several times higher than costs arising from preventive maintenance.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
36
TPM (total productive maintenance)is an application of TQM (total quality management)principles to the area of maintenance.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
37
What is the reliability of the three components connected in series shown below? 
A)0.799425
B)0.85000
C)0.91333
D)0.95000
E)2.79

A)0.799425
B)0.85000
C)0.91333
D)0.95000
E)2.79
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
38
Which of the following best illustrates the importance of employee involvement in achieving successful maintenance and reliability?
A)Operator,machine,and mechanic are independent of one another.
B)Small standard deviations tend to favour preventive maintenance over breakdown maintenance.
C)Infant mortality in products can be decreased through improved owner's manuals and after-sales service and customer training.
D)Employee involvement through such elements as reward systems and power sharing combine with good maintenance and reliability procedures to improve capacity and reduce variability.
E)Empowered operators have higher competence at repairs than field service or depot service.
A)Operator,machine,and mechanic are independent of one another.
B)Small standard deviations tend to favour preventive maintenance over breakdown maintenance.
C)Infant mortality in products can be decreased through improved owner's manuals and after-sales service and customer training.
D)Employee involvement through such elements as reward systems and power sharing combine with good maintenance and reliability procedures to improve capacity and reduce variability.
E)Empowered operators have higher competence at repairs than field service or depot service.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
39
The objective of maintenance and reliability is to maintain the capability of the system.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
40
A job consists of a series of three tasks.Task 1 is performed correctly 98% of the time,task 2 is performed correctly 99% of the time,and task 3 is performed correctly 97% of the time.The reliability of this job is
A)91.27%.
B)94.11%.
C)97.00%.
D)98.00%.
E)99.00%.
A)91.27%.
B)94.11%.
C)97.00%.
D)98.00%.
E)99.00%.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
41
MTBF measures the average
A)calendar time between failures.
B)operating time between failures.
C)number of failures per unit time.
D)number of operations between failures.
E)downtime per breakdown.
A)calendar time between failures.
B)operating time between failures.
C)number of failures per unit time.
D)number of operations between failures.
E)downtime per breakdown.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
42
Which one of the following statements about maintenance is true?
A)The optimal degree of preventive maintenance is associated with zero breakdowns.
B)Breakdown maintenance is proactive.
C)Preventive maintenance is reactive.
D)Preventive maintenance is limited to keeping machinery and equipment running.
E)Human resources are a major component of effective maintenance management.
A)The optimal degree of preventive maintenance is associated with zero breakdowns.
B)Breakdown maintenance is proactive.
C)Preventive maintenance is reactive.
D)Preventive maintenance is limited to keeping machinery and equipment running.
E)Human resources are a major component of effective maintenance management.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
43
A system is composed of four parts,J,K,L,and M.All four must function for the system to function.The four component reliabilities are .99,.98,.992,and .998.The designers are considering putting a .80 reliable backup at K.This backup will change the system reliability from ________ to ________.
A)0.9762;0.9605
B)0.9605;0.9762
C)0.9605;some smaller value
D)exactly 0.9560
E)cannot be determined
A)0.9762;0.9605
B)0.9605;0.9762
C)0.9605;some smaller value
D)exactly 0.9560
E)cannot be determined
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
44
As far as maintenance costs are concerned
A)for low levels of maintenance commitment,breakdown maintenance costs exceed preventive maintenance costs.
B)for low levels of maintenance commitment,preventive maintenance costs exceed breakdown maintenance costs.
C)for high levels of maintenance commitment,breakdown maintenance costs exceed preventive maintenance costs.
D)preventive maintenance is always more economical than breakdown maintenance.
E)Breakdown maintenance is always more economical than preventive maintenance when the "full cost of breakdowns" is taken into consideration.
A)for low levels of maintenance commitment,breakdown maintenance costs exceed preventive maintenance costs.
B)for low levels of maintenance commitment,preventive maintenance costs exceed breakdown maintenance costs.
C)for high levels of maintenance commitment,breakdown maintenance costs exceed preventive maintenance costs.
D)preventive maintenance is always more economical than breakdown maintenance.
E)Breakdown maintenance is always more economical than preventive maintenance when the "full cost of breakdowns" is taken into consideration.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
45
How is MTBF related to FR(N)?
A)MTBF is measured in hours,while FR(N)is measured in years.
B)MTBF is normally distributed,with FR(%)as its mean and FR(N)as its standard deviation.
C)MTBF is the reciprocal of FR(N).
D)Both MTBF and FR(N)increase when breakdown maintenance is replaced by preventive maintenance.
E)MTBF and FR(N)are unrelated concepts.
A)MTBF is measured in hours,while FR(N)is measured in years.
B)MTBF is normally distributed,with FR(%)as its mean and FR(N)as its standard deviation.
C)MTBF is the reciprocal of FR(N).
D)Both MTBF and FR(N)increase when breakdown maintenance is replaced by preventive maintenance.
E)MTBF and FR(N)are unrelated concepts.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
46
The MTBF distribution of a machine that has passed the phase of early failures exhibits a normal distribution.The smaller the standard deviation of this distribution
A)the more expensive is preventive maintenance.
B)the more likely this machine is a candidate for preventive maintenance.
C)the shorter is the time interval between breakdowns.
D)the more likely this machine will break down.
E)the more likely this machine will be maintained by a breakdown maintenance policy.
A)the more expensive is preventive maintenance.
B)the more likely this machine is a candidate for preventive maintenance.
C)the shorter is the time interval between breakdowns.
D)the more likely this machine will break down.
E)the more likely this machine will be maintained by a breakdown maintenance policy.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
47
Infant mortality in electronics follows which kind of distribution?
A)normal
B)negative exponential
C)exponential
D)random
E)one-sided normal distribution
A)normal
B)negative exponential
C)exponential
D)random
E)one-sided normal distribution
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
48
Suppose that a process is comprised of multiple components,each having a 75% success rate.What is the change in reliability going from a series layout to a parallel layout if the process has 5 components?
A)0%
B)100%
C)76.2%
D)-76.2 %
E)unable to determine
A)0%
B)100%
C)76.2%
D)-76.2 %
E)unable to determine
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
49
Ten high-technology batteries are tested for 200 hours each.One failed at 20 hours;all others completed the test.FR(%)is ________ and MTBF is ________.
A)10%;1/1820
B)90%;1/1820
C)10%;1820 hours
D)10%;1980 hours
E)cannot calculate from information provided
A)10%;1/1820
B)90%;1/1820
C)10%;1820 hours
D)10%;1980 hours
E)cannot calculate from information provided
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
50
Ten high-technology batteries are tested for 200 hours each.One failed at 50 hours;all others completed the test.FR(%)is ________ and FR(N)is ________.
A)10%;1/1850
B)10%;1/2000
C)25%;1850 hours
D)90%;1/2000
E)Indeterminate;no standard deviation is given.
A)10%;1/1850
B)10%;1/2000
C)25%;1850 hours
D)90%;1/2000
E)Indeterminate;no standard deviation is given.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
51
A two-component process has an 81% success rate in series and a 99% success rate in parallel.If each component has the same reliability,what is the reliability of an individual component?
A)50%
B)90%
C)99%
D)59%
E)unable to determine
A)50%
B)90%
C)99%
D)59%
E)unable to determine
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
52
The normal distribution is an appropriate model of
A)the high initial failure rates of product,machine,or processes.
B)system reliability where components are connected in series.
C)system reliability where components are connected in parallel.
D)the MTBF distribution of products,machines,or processes that have "settled in."
E)the full cost view of maintenance.
A)the high initial failure rates of product,machine,or processes.
B)system reliability where components are connected in series.
C)system reliability where components are connected in parallel.
D)the MTBF distribution of products,machines,or processes that have "settled in."
E)the full cost view of maintenance.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
53
Infant mortality refers to which one of the following examples?
A)high frequency on the left side of the MTBF distribution
B)failure of items used in the nursery ward of a hospital
C)failure of products with a very short life cycle
D)market failure of brand new products
E)high failure rate often encountered in the very early stages of the lifetime of a product
A)high frequency on the left side of the MTBF distribution
B)failure of items used in the nursery ward of a hospital
C)failure of products with a very short life cycle
D)market failure of brand new products
E)high failure rate often encountered in the very early stages of the lifetime of a product
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
54
An oil change is to ________ maintenance as repair of a broken alternator is to ________ maintenance.
A)preventive;breakdown
B)breakdown;preventive
C)preventive;preventive
D)breakdown;breakdown
E)corrective;defective
A)preventive;breakdown
B)breakdown;preventive
C)preventive;preventive
D)breakdown;breakdown
E)corrective;defective
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
55
Ten high-technology batteries are tested for 200 hours each.One failed at 20 hours;another failed at 140 hours;all others completed the test.FR(%)is ________ and MTBF is ________.
A)20%;880 hours
B)10%;1980 hours
C)20%;1760 hours
D)cannot calculate from information provided
E)80%;920 hours
A)20%;880 hours
B)10%;1980 hours
C)20%;1760 hours
D)cannot calculate from information provided
E)80%;920 hours
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
56
For a machine to be a good candidate for preventive maintenance
A)the consequences of failure must exceed the cost of preventive maintenance and the MTBF distribution must have a large standard deviation.
B)the consequences of failure must exceed the cost of preventive maintenance and the MTBF must be relatively low.
C)the consequences of failure must exceed the cost of preventive maintenance and the MTBF distribution must have a relatively low standard deviation.
D)the consequences of failure must exceed the cost of preventive maintenance and the MTBF must be relatively high.
E)the consequences of failure must be relatively unknown and,therefore,risky.
A)the consequences of failure must exceed the cost of preventive maintenance and the MTBF distribution must have a large standard deviation.
B)the consequences of failure must exceed the cost of preventive maintenance and the MTBF must be relatively low.
C)the consequences of failure must exceed the cost of preventive maintenance and the MTBF distribution must have a relatively low standard deviation.
D)the consequences of failure must exceed the cost of preventive maintenance and the MTBF must be relatively high.
E)the consequences of failure must be relatively unknown and,therefore,risky.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
57
The process that involves repair on an emergency or priority basis is known as
A)breakdown maintenance.
B)emergency maintenance.
C)failure maintenance.
D)preventive maintenance.
E)priority maintenance.
A)breakdown maintenance.
B)emergency maintenance.
C)failure maintenance.
D)preventive maintenance.
E)priority maintenance.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
58
A manager is comparing the total maintenance (preventive plus breakdown)cost curves for two scenarios.The graphs have maintenance commitment on the x-axis and costs on the y-axis.Scenario A includes the direct breakdown maintenance costs,while Scenario B includes the "full" (direct and indirect)breakdown maintenance costs.Which of the following should the manager notice when going from Scenario A to Scenario B?
A)total cost is decreased
B)optimal point is moved to the left
C)optimal point is moved to the right
D)preventative maintenance cost slope is increased
E)total cost does not move
A)total cost is decreased
B)optimal point is moved to the left
C)optimal point is moved to the right
D)preventative maintenance cost slope is increased
E)total cost does not move
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
59
Suppose that the introduction of a preventive maintenance program is deemed cost effective.Which of the following is most likely true if the cost to actually perform preventive maintenance is very expensive?
A)high standard deviation in MTBF
B)low standard deviation in MTBF
C)low Cost to Repair
D)repairs carry little non-monetary consequences
E)the system never fails
A)high standard deviation in MTBF
B)low standard deviation in MTBF
C)low Cost to Repair
D)repairs carry little non-monetary consequences
E)the system never fails
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
60
As a firm's maintenance commitment increases,
A)the breakdown maintenance costs increase and the preventive maintenance costs decrease.
B)both the breakdown maintenance costs and the preventive maintenance costs decrease.
C)the breakdown maintenance costs decrease and the preventive maintenance costs increase.
D)both the breakdown maintenance costs and the preventive maintenance costs increase.
E)None of the above are true.
A)the breakdown maintenance costs increase and the preventive maintenance costs decrease.
B)both the breakdown maintenance costs and the preventive maintenance costs decrease.
C)the breakdown maintenance costs decrease and the preventive maintenance costs increase.
D)both the breakdown maintenance costs and the preventive maintenance costs increase.
E)None of the above are true.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
61
When depot service is compared to operator maintenance
A)operator maintenance is slower than depot service.
B)competence is higher,but costs may also be higher,with depot service.
C)depot service is often the weak link in the chain because of the lack of specific training.
D)depot service occurs on-site,while operator maintenance occurs off-site.
E)depot service is better for systems connected in parallel,while operator maintenance is preferred for systems connected in series.
A)operator maintenance is slower than depot service.
B)competence is higher,but costs may also be higher,with depot service.
C)depot service is often the weak link in the chain because of the lack of specific training.
D)depot service occurs on-site,while operator maintenance occurs off-site.
E)depot service is better for systems connected in parallel,while operator maintenance is preferred for systems connected in series.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
62
________ is the probability that a machine part or product will function properly for a specified time under stated conditions.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
63
DuLarge Marine manufactures diesel engines for shrimp trawlers and other small commercial boats.One of their CNC machines has caused several problems.Over the past 30 weeks,the machine has broken down as indicated below.Each time the machine breaks down,the firm loses an average of $3,000 in time and repair expenses.If preventive maintenance were implemented,it is estimated that an average of only one breakdown per week would occur.The cost of preventive maintenance is $1,000 per week.
What is the weekly total maintenance cost of this program?
A)$1,000
B)$3,000
C)$4,000
D)$6,000
E)$8,000

A)$1,000
B)$3,000
C)$4,000
D)$6,000
E)$8,000
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
64
DuLarge Marine manufactures diesel engines for shrimp trawlers and other small commercial boats.One of their CNC machines has caused several problems.Over the past 30 weeks,the machine has broken down as indicated below.
What is the expected number of breakdowns per week?
A)1
B)2
C)6
D)10
E)30

A)1
B)2
C)6
D)10
E)30
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
65
Autonomous maintenance occurs when
A)employees are empowered to observe,check,adjust,clean,and notify.
B)a remote computer system signals the need for breakdown maintenance.
C)a remote computer system signals the need for preventative maintenance.
D)employees perform their own breakdown maintenance.
E)employees automatically report breakdowns to their supervisor.
A)employees are empowered to observe,check,adjust,clean,and notify.
B)a remote computer system signals the need for breakdown maintenance.
C)a remote computer system signals the need for preventative maintenance.
D)employees perform their own breakdown maintenance.
E)employees automatically report breakdowns to their supervisor.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
66
________ is the use of a component in parallel to raise reliabilities.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
67
________ is the expected time between a repair and the next failure of a component,machine,process,or product.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
68
________ consists of all activities involved in keeping a system's equipment in working order.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
69
________ is the failure rate early in the life of a product or process.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
70
________ combines total quality management with a strategic view of maintenance from process equipment design to preventive maintenance.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
71
Which of the following is true regarding total productive maintenance (TPM)?
A)TPM is concerned with machine operation,not machine design.
B)Field service and depot service perform virtually all maintenance and repair activities.
C)Operators run their machines,but maintenance departments maintain them.
D)TPM reduces variability through employee empowerment and excellent maintenance practices.
E)TPM views maintenance and repair as tactical issues,not strategic ones.
A)TPM is concerned with machine operation,not machine design.
B)Field service and depot service perform virtually all maintenance and repair activities.
C)Operators run their machines,but maintenance departments maintain them.
D)TPM reduces variability through employee empowerment and excellent maintenance practices.
E)TPM views maintenance and repair as tactical issues,not strategic ones.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
72
Which one of the following is not necessary to identify the optimal maintenance policy?
A)historical data on maintenance costs
B)cost of performing the analysis
C)breakdown probabilities
D)breakdown occurrences
E)repair times
A)historical data on maintenance costs
B)cost of performing the analysis
C)breakdown probabilities
D)breakdown occurrences
E)repair times
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
73
Which of the following increase as repairs move from the maintenance department to the depot service?
A)cost
B)replacement time
C)quality
D)employee ownership
E)A,B,and C
A)cost
B)replacement time
C)quality
D)employee ownership
E)A,B,and C
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
74
The inverse of the mean time between failures is the ________.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
75
________ is a plan that involves routine inspections,servicing,and keeping facilities in good repair to prevent failure.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
76
DuLarge Marine manufactures diesel engines for shrimp trawlers and other small commercial boats.One of their CNC machines has caused several problems.Over the past 30 weeks,the machine has broken down as indicated below.Each time the machine breaks down,the firm loses an average of $3,000 in time and repair expenses.
What is the expected breakdown cost per week?
A)$1,000
B)$2,000
C)$6,000
D)$10,000
E)$60,000

A)$1,000
B)$2,000
C)$6,000
D)$10,000
E)$60,000
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
77
Techniques for enhancing maintenance can include
A)simulation of breakdowns from prolonged use.
B)expert systems that aid in problem-solving.
C)automated sensors that warn when preventative maintenance is required.
D)A and C.
E)A,B,and C.
A)simulation of breakdowns from prolonged use.
B)expert systems that aid in problem-solving.
C)automated sensors that warn when preventative maintenance is required.
D)A and C.
E)A,B,and C.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
78
The ________ takes into account such costs as deteriorated customer relations and lost sales.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
79
Which of the following costs tend to be ignored in determining the optimal maintenance policy?
A)expected breakdown costs
B)preventive maintenance costs
C)the costs associated with various levels of commitment to maintenance
D)cost of low morale
E)total maintenance cost
A)expected breakdown costs
B)preventive maintenance costs
C)the costs associated with various levels of commitment to maintenance
D)cost of low morale
E)total maintenance cost
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck
80
Describe how the Pickering Nuclear Station achieves an excellent record of reliability through its maintenance practices.
Unlock Deck
Unlock for access to all 130 flashcards in this deck.
Unlock Deck
k this deck