
Engineering Economy 7th Edition by Leland Blank ,Anthony Tarquin
Edition 7ISBN: 978-0073376301
Engineering Economy 7th Edition by Leland Blank ,Anthony Tarquin
Edition 7ISBN: 978-0073376301 Exercise 19
The Public Service Board (PSB) awarded two contracts worth a combined $1.07 million to improve (i.e., deepen) a retention basin and reconstruct the spillway that was severely damaged in a fl ood 2 years ago. The PSB said that, because of the weak economy, the bids came in $950,000 lower than engineers expected. If the projects are assumed to have a 20-year life, what is the annual worth of the savings at an interest rate of 6% per year
Explanation
The formula for calculating annual payme...
Engineering Economy 7th Edition by Leland Blank ,Anthony Tarquin
Why don’t you like this exercise?
Other Minimum 8 character and maximum 255 character
Character 255