The PERT is combined with cost data to produce a PERT cost analysis to
A) calculate the total project cost inclusive of the additional slack time.
B) evaluate and optimize trade-offs between time of an event's completion and its cost to complete.
C) implement computer-integrated manufacturing concepts.
D) avoid the problem of time variance analysis.
E) calculate expected activity times.