Exercise 23
Factory overhead cost variances
The following data relate to factory overhead cost for the production of 10,000 computers:
Factory overhead cost variances  The following data relate to factory overhead cost for the production of 10,000 computers:     If productive capacity of 100% was 15,000 hours and total factory overhead cost budgeted at the level of 14,000 standard hours was $356,000, determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance. The fixed factory overhead rate was $6.00 per hour.
If productive capacity of 100% was 15,000 hours and total factory overhead cost budgeted at the level of 14,000 standard hours was $356,000, determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance. The fixed factory overhead rate was $6.00 per hour.
Explanation
Verified
like image
like image

Variance analysis:
The analysis of the ...