Exercise 27
Budget performance report
Genie in a Bottle Company (GBC) manufactures plastic two-liter bottles for the beverage industry. The cost standards per 100 two-liter bottles are as follows:
Budget performance report  Genie in a Bottle Company (GBC) manufactures plastic two-liter bottles for the beverage industry. The cost standards per 100 two-liter bottles are as follows:     At the beginning of July, GBC management planned to produce 400,000 bottles. The actual number of bottles produced for July was 406,000 bottles. The actual costs for July of the current year were as follows:     a. Prepare the July manufacturing standard cost budget (direct labor, direct materials, and factory overhead) for GBC, assuming planned production. b. Prepare a budget performance report for manufacturing costs, showing the total cost variances for direct materials, direct labor, and factory overhead for July. c. Interpret the budget performance report.
At the beginning of July, GBC management planned to produce 400,000 bottles. The actual number of bottles produced for July was 406,000 bottles. The actual costs for July of the current year were as follows:
Budget performance report  Genie in a Bottle Company (GBC) manufactures plastic two-liter bottles for the beverage industry. The cost standards per 100 two-liter bottles are as follows:     At the beginning of July, GBC management planned to produce 400,000 bottles. The actual number of bottles produced for July was 406,000 bottles. The actual costs for July of the current year were as follows:     a. Prepare the July manufacturing standard cost budget (direct labor, direct materials, and factory overhead) for GBC, assuming planned production. b. Prepare a budget performance report for manufacturing costs, showing the total cost variances for direct materials, direct labor, and factory overhead for July. c. Interpret the budget performance report.
a. Prepare the July manufacturing standard cost budget (direct labor, direct materials, and factory overhead) for GBC, assuming planned production.
b. Prepare a budget performance report for manufacturing costs, showing the total cost variances for direct materials, direct labor, and factory overhead for July.
c. Interpret the budget performance report.
Explanation
Verified
like image
like image

a.Standard Cost Budget for July for GBC ...