expand icon
book Introduction to Management Science 12th Edition by Bernard Taylor cover

Introduction to Management Science 12th Edition by Bernard Taylor

Edition 12ISBN: 978-0133778847
book Introduction to Management Science 12th Edition by Bernard Taylor cover

Introduction to Management Science 12th Edition by Bernard Taylor

Edition 12ISBN: 978-0133778847
Exercise 20
In Problem, if Professor Smith could hire Brad or Sarah to work 1 additional hour, which should she choose What would be the effect of hiring the selected graduate assistant for 1 additional hour
Problem
Professor Smith teaches two sections of business statistics, which combined will result in 120 final exams to be graded. Professor Smith has two graduate assistants, Brad and Sarah, who will grade the final exams. There is a 3-day period between the time the exam is administered and when final grades must be posted. During this period, Brad has 12 hours available and Sarah has 10 hours available to grade the exams. It takes Brad an average of 7.2 minutes to grade an exam, and it takes Sarah 12 minutes to grade an exam; however, Brad's exams will have errors that will require Professor Smith to ultimately regrade 10% of the exams, while only 6% of Sarah's exams will require regrading. Professor Smith wants to know how many exams to assign to each graduate assistant to grade in order to minimize the number of exams to regrade.
a. Formulate a linear programming model for this problem.
b. Solve this model by using graphical analysis.
Explanation
Verified
like image
like image

Linear programming model is used to solv...

close menu
Introduction to Management Science 12th Edition by Bernard Taylor
cross icon