Exercise 19
The project network for building a garage is shown in Figure 16.11 and includes data on activity times and their deviations.
a. Develop a Monte Carlo simulation model that can be used to generate a distribution of project completion times (longest path from node 1 to 8).
b. Simulate 5 project completion experiences using random numbers from Appendix B. What is the expected project duration time?
The project network for building a garage is shown in Figure 16.11 and includes data on activity times and their deviations. a. Develop a Monte Carlo simulation model that can be used to generate a distribution of project completion times (longest path from node 1 to 8). b. Simulate 5 project completion experiences using random numbers from Appendix B. What is the expected project duration time?
Explanation
Verified
like image
like image

a. 
blured image blured image Random numbers are drawn for eac...