expand icon
book Service Management: Operations, Strategy, Information Technology 8th Edition by James Fitzsimmons,Mona Fitzsimmons,Sanjeev Bordoloi cover

Service Management: Operations, Strategy, Information Technology 8th Edition by James Fitzsimmons,Mona Fitzsimmons,Sanjeev Bordoloi

Edition 8ISBN: 978-1259010651
book Service Management: Operations, Strategy, Information Technology 8th Edition by James Fitzsimmons,Mona Fitzsimmons,Sanjeev Bordoloi cover

Service Management: Operations, Strategy, Information Technology 8th Edition by James Fitzsimmons,Mona Fitzsimmons,Sanjeev Bordoloi

Edition 8ISBN: 978-1259010651
Exercise 19
The time to make beds at a motel should fall into an agreed-on range of times. A sample of four maids was selected, and the time needed to make a bed was observed on three different occasions:
The time to make beds at a motel should fall into an agreed-on range of times. A sample of four maids was selected, and the time needed to make a bed was observed on three different occasions:     a. Determine the upper and lower control limits for an X -chart and an R -chart with a sample size of four. b. After the control chart was established, a sample of four observations had the following times in seconds: 185, 150, 192, and 178. Is corrective action needed?
a. Determine the upper and lower control limits for an X -chart and an R -chart with a sample size of four.
b. After the control chart was established, a sample of four observations had the following times in seconds: 185, 150, 192, and 178. Is corrective action needed?
Explanation
Verified
like image
like image

a.
The service time taken by four maids ...