Accounting: What the Numbers Mean 11th Edition by Wayne McManus,Daniel Viele,David Marshall
Edition 11ISBN: 978-1259535314
Accounting: What the Numbers Mean 11th Edition by Wayne McManus,Daniel Viele,David Marshall
Edition 11ISBN: 978-1259535314 Exercise 25
Fixed overhead variances In addition to the information for Acme Company in Mini-Exercises 15.1 and 15.2, the standard fixed overhead application rate per unit consists of $2 per machine hour and each unit is allowed a standard of 1 hour of machine time.
Required:
Calculate the fixed overhead budget variance and the fixed overhead volume variance.
Reference Mini-Exercise 15.1:
Flexible budget Acme Company's production budget for August is 17,500 units and includes the following component unit costs: direct materials, $8; direct labor, $10; variable overhead, $6. Budgeted fixed overhead is $32,000. Actual production in August was 18,000 units.
Required:
Prepare a flexible budget that would be used to compare against actual production costs for August.
Reference Mini-Exercise 15.2:
Flexible budget and performance reporting In addition to the information for Acme Company in Mini-Exercise 15.1, actual unit component costs incurred during August include direct materials, $8.25; direct labor, $9.45; variable overhead, $6.82. Actual fixed overhead was $33,500.
Required:
Prepare a performance report, including each cost component, using the following headings:

Required:
Calculate the fixed overhead budget variance and the fixed overhead volume variance.
Reference Mini-Exercise 15.1:
Flexible budget Acme Company's production budget for August is 17,500 units and includes the following component unit costs: direct materials, $8; direct labor, $10; variable overhead, $6. Budgeted fixed overhead is $32,000. Actual production in August was 18,000 units.
Required:
Prepare a flexible budget that would be used to compare against actual production costs for August.
Reference Mini-Exercise 15.2:
Flexible budget and performance reporting In addition to the information for Acme Company in Mini-Exercise 15.1, actual unit component costs incurred during August include direct materials, $8.25; direct labor, $9.45; variable overhead, $6.82. Actual fixed overhead was $33,500.
Required:
Prepare a performance report, including each cost component, using the following headings:

Explanation
Fixed overhead budget variance:
Fixed o...
Accounting: What the Numbers Mean 11th Edition by Wayne McManus,Daniel Viele,David Marshall
Why don’t you like this exercise?
Other Minimum 8 character and maximum 255 character
Character 255