
Contemporary Engineering Economics 6th Edition by Chan Park
Edition 6ISBN: 978-0134162690
Contemporary Engineering Economics 6th Edition by Chan Park
Edition 6ISBN: 978-0134162690 Exercise 2
Cost Behaviour
Identify which of the following costs are fixed, which are variable, and which are mixed.
• Wages paid to temporary workers.
• Property taxes on a factory building.
• Property taxes on an administrative building.
• Sales commission.
• Electricity for machinery and equipment in the plant.
• Heating and air-conditioning for the plant.
• Salaries paid to design engineers.
• Regular maintenance on machinery and equipment.
• Basic raw materials used in production.
• Factory fire insurance.
Identify which of the following costs are fixed, which are variable, and which are mixed.
• Wages paid to temporary workers.
• Property taxes on a factory building.
• Property taxes on an administrative building.
• Sales commission.
• Electricity for machinery and equipment in the plant.
• Heating and air-conditioning for the plant.
• Salaries paid to design engineers.
• Regular maintenance on machinery and equipment.
• Basic raw materials used in production.
• Factory fire insurance.
Explanation
Fixed is the cost that is independent of...
Contemporary Engineering Economics 6th Edition by Chan Park
Why don’t you like this exercise?
Other Minimum 8 character and maximum 255 character
Character 255