Exercise 3
Construct a WBS in indented outline format like Exhibit for a project in which you plan an event on your campus. Be sure to number each row. Also, construct the same WBS in MS Project like Exhibit.
Exhibit
LIBRARY PROJECT WBS WITH COMPONENTS NUMBERED
LIBRARY PROJECT
1. Project Management
2. Facility Needs
2.1 VISION STATEMENT
2.2 STAKEHOLDER INPUT
2.3 OPTIONS
3. Building Proposal
3.1 RECOMMENDED SIZE AND SCOPE
3.2 SITING
3.3 COST RATIONALE
4. Building Approval
4.1 VP OF FINANCE APPROVAL
4.2 PRESIDENT APPROVAL
4.3 BOARD APPROVAL
5. Staff Education
5.1 LITERATURE REVIEW
5.2 LIBRARY VISITS
5.3 SUPPLIER INPUT, PROCESS, OUTPUT, CUSTOMER ANALYSIS
5.4 TRAINING
6. Fundraising
6.1 POTENTIAL DONOR LIST
6.2 RELATIONSHIP BUILDING WITH POTENTIAL DONORS
6.3 EDUCATION OF POTENTIAL DONORS
6.4 DONATIONS
6.5 FOLLOW-UP WITH DONORS
7. Building Documents
7.1 FACILITY AND SITE SPECIFICATIONS
7.2 SCHEMATIC DESIGNS
7.3 DEVELOPMENT PLANS
7.4 CONTRACT DOCUMENTS
8. Building Construction
8.1 ARCHITECT
8.2 CONTRACTORS
8.3 CONSTRUCTION
8.4 FURNISHINGS
9. Building Acceptance
9.1 BUILDING AND GROUNDS ACCEPTANCE
9.2 BUILDING OCCUPANCY
9.3 BUILDING DEDICATION
9.4 WARRANTY CORRECTIONS
Exhibit
Construct a WBS in indented outline format like Exhibit for a project in which you plan an event on your campus. Be sure to number each row. Also, construct the same WBS in MS Project like Exhibit. Exhibit LIBRARY PROJECT WBS WITH COMPONENTS NUMBERED  LIBRARY PROJECT  1. Project Management  2. Facility Needs  2.1 VISION STATEMENT 2.2 STAKEHOLDER INPUT 2.3 OPTIONS 3. Building Proposal  3.1 RECOMMENDED SIZE AND SCOPE 3.2 SITING 3.3 COST RATIONALE 4. Building Approval  4.1 VP OF FINANCE APPROVAL 4.2 PRESIDENT APPROVAL 4.3 BOARD APPROVAL 5. Staff Education  5.1 LITERATURE REVIEW 5.2 LIBRARY VISITS 5.3 SUPPLIER INPUT, PROCESS, OUTPUT, CUSTOMER ANALYSIS 5.4 TRAINING 6. Fundraising  6.1 POTENTIAL DONOR LIST 6.2 RELATIONSHIP BUILDING WITH POTENTIAL DONORS 6.3 EDUCATION OF POTENTIAL DONORS 6.4 DONATIONS 6.5 FOLLOW-UP WITH DONORS 7. Building Documents  7.1 FACILITY AND SITE SPECIFICATIONS 7.2 SCHEMATIC DESIGNS 7.3 DEVELOPMENT PLANS 7.4 CONTRACT DOCUMENTS 8. Building Construction  8.1 ARCHITECT 8.2 CONTRACTORS 8.3 CONSTRUCTION 8.4 FURNISHINGS 9. Building Acceptance  9.1 BUILDING AND GROUNDS ACCEPTANCE 9.2 BUILDING OCCUPANCY 9.3 BUILDING DEDICATION 9.4 WARRANTY CORRECTIONS Exhibit
Explanation
like image
like image
no-answer
This question doesn’t have an expert verified answer yet, let Examlex AI Copilot help.
close menu
Contemporary Project Management 3rd Edition by Timothy Kloppenborg
cross icon