Compute these variances: (a) variable overhead spending and efficiency, (b) fixed overhead spending and volume, and (c) total overhead controllable.
Reference: Problem 23-4A
Trico Company set the following standard unit costs for its single product.
The predetermined overhead rate is based on a planned operating volume of 80% of the productive capacity of 60,000 units per quarter. The following flexible budget information is available.
During the current quarter, the company operated at 90% of capacity and produced 54,000 units of product; actual direct labor totaled 265,000 hours. Units produced were assigned the following standard costs:
Actual costs incurred during the current quarter follow:
Required
1. Compute the direct materials cost variance, including its price and quantity variances.
2. Compute the direct labor cost variance, including its rate and efficiency variances.
3. Compute the overhead controllable and volume variances.
Required
Compute these variances: (a) variable overhead spending and efficiency, (b) fixed overhead spending and volume, and (c) total overhead controllable.
Reference: Problem 23-4A
Trico Company set the following standard unit costs for its single product.

The predetermined overhead rate is based on a planned operating volume of 80% of the productive capacity of 60,000 units per quarter. The following flexible budget information is available.

During the current quarter, the company operated at 90% of capacity and produced 54,000 units of product; actual direct labor totaled 265,000 hours. Units produced were assigned the following standard costs:

Actual costs incurred during the current quarter follow:

Required
1. Compute the direct materials cost variance, including its price and quantity variances.
2. Compute the direct labor cost variance, including its rate and efficiency variances.
3. Compute the overhead controllable and volume variances.
Explanation
When there is difference between the act...
Fundamental Accounting Principles 22th Edition by John Wild ,Ken Shaw,Barbara Chiappetta
Why don’t you like this exercise?
Other Minimum 8 character and maximum 255 character
Character 255