
Managing for Quality and Performance Excellence 10th Edition by James Evans ,William Lindsay
Edition 10ISBN: 978-1305662544
Managing for Quality and Performance Excellence 10th Edition by James Evans ,William Lindsay
Edition 10ISBN: 978-1305662544 Exercise 51
Note: Data sets for many problems in this chapter are available in the Excel workbook C06Data.xlsx on the Student Companion Site. Click on the appropriate worksheet tab as noted in the problem (e.g., Prob. 6-1) to access the data. In addition, the spreadsheet templates illustrated in the chapter are also available to aid in solving many of these problems.
The mean time to pour and process 5 cubic yards of concrete by the Piedra Cretebuilders Co. is 15.5 minutes. If 2 percent of the projects with 5 yards of concrete require more than 15.75 minutes, what is the standard deviation of the time for such projects?
The mean time to pour and process 5 cubic yards of concrete by the Piedra Cretebuilders Co. is 15.5 minutes. If 2 percent of the projects with 5 yards of concrete require more than 15.75 minutes, what is the standard deviation of the time for such projects?
Explanation
Calculating the standard deviation:
It ...
Managing for Quality and Performance Excellence 10th Edition by James Evans ,William Lindsay
Why don’t you like this exercise?
Other Minimum 8 character and maximum 255 character
Character 255