At Elproparts Manufacturers' integrated circuit business, managers gathered data from a customer focus group and found that any output voltage that exceeds 60 ± 3.5 volts was unacceptable to the customer. Exceeding these limits results in an estimated loss of $90. However, the manufacturer can still adjust the voltage in the plant using a quick diagnostic test that costs $3.75.
a. Determine the Taguchi loss function.
b. Suppose the nominal specification remains at 60 volts. At what tolerance should the integrated circuit be manufactured?
At Elproparts Manufacturers' integrated circuit business, managers gathered data from a customer focus group and found that any output voltage that exceeds 60 ± 3.5 volts was unacceptable to the customer. Exceeding these limits results in an estimated loss of $90. However, the manufacturer can still adjust the voltage in the plant using a quick diagnostic test that costs $3.75.
a. Determine the Taguchi loss function.
b. Suppose the nominal specification remains at 60 volts. At what tolerance should the integrated circuit be manufactured?
Explanation
The Taguchi loss function calculates the...