
Managing for Quality and Performance Excellence 10th Edition by James Evans ,William Lindsay
Edition 10ISBN: 978-1305662544
Managing for Quality and Performance Excellence 10th Edition by James Evans ,William Lindsay
Edition 10ISBN: 978-1305662544 Exercise 62
Note: Data for many of the problems in this chapter can be found in the Excel workbook C08Data.xlsx on the Student Companion Site. Click on the appropriate worksheet tab as noted in the problem (e.g., Prob. 8-6, etc.) to access the data.
PCDrives has a manufacturing process that is normally distributed and has the sample means and ranges for 15 samples of size 5, found in the worksheet Prob. 8-32 in the C08Data.xlsx file on the Student Companion Site for this chapter. Note that only sample statistics have been given, instead of the raw data from the samples. Determine process capability limits by estimating the standard deviation using formula (8.34). If specifications are determined to be 70 ± 25, what percentage will be out of specification?
PCDrives has a manufacturing process that is normally distributed and has the sample means and ranges for 15 samples of size 5, found in the worksheet Prob. 8-32 in the C08Data.xlsx file on the Student Companion Site for this chapter. Note that only sample statistics have been given, instead of the raw data from the samples. Determine process capability limits by estimating the standard deviation using formula (8.34). If specifications are determined to be 70 ± 25, what percentage will be out of specification?
Explanation
Excel sheet showing the sample observati...
Managing for Quality and Performance Excellence 10th Edition by James Evans ,William Lindsay
Why don’t you like this exercise?
Other Minimum 8 character and maximum 255 character
Character 255