Deck 15: Just-In-Time and Lean Production
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/38
Play
Full screen (f)
Deck 15: Just-In-Time and Lean Production
1
JIT type approaches have many different names. Lean operations is a :
A) JIT approach
B) Non-JIT approach
A) JIT approach
B) Non-JIT approach
JIT approach
2
The 'lean' concept has much wider implications for improving operations' performance beyond
planning and control issues.
planning and control issues.
True
3
Within JIT, process owners are encouraged to assume ownership of their machines and undertake routine maintenance. This is called:
A) Preventative repairs
B) Routine checking
C) Total productive maintenance
D) Maintenance service
A) Preventative repairs
B) Routine checking
C) Total productive maintenance
D) Maintenance service
Total productive maintenance
4
JIT type approaches have many different names. Buffer inventories is a :
A) JIT approach
B) Non-JIT approach
A) JIT approach
B) Non-JIT approach
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
5
JIT type approaches have many different names. Short cycle time manufacturing is a :
A) JIT approach
B) Non-JIT approach
A) JIT approach
B) Non-JIT approach
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
6
The lean approach aims to:
A) Reduce buffer inventory, but increase safety inventory
B) Reduce the level of inventory
C) Maintain buffer inventory
D) None of the above
A) Reduce buffer inventory, but increase safety inventory
B) Reduce the level of inventory
C) Maintain buffer inventory
D) None of the above
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
7
JIT type approaches have many different names. Stockless production is a :
A) JIT approach
B) Non-JIT approach
A) JIT approach
B) Non-JIT approach
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
8
Which one of the following would be considered a prerequisite for successful lean production?
A) Suppliers in multiple locations.
B) Sophisticated production and materials planning computer systems.
C) Preventive maintenance of equipment.
D) The preparation of a Master Production Schedule.
E) High variety of product range.
A) Suppliers in multiple locations.
B) Sophisticated production and materials planning computer systems.
C) Preventive maintenance of equipment.
D) The preparation of a Master Production Schedule.
E) High variety of product range.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
9
Is the following statement characteristic of MRP or JIT.Planning and control concepts are only part of a wider philosophy.
A) MRP
B) JIT
A) MRP
B) JIT
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
10
Is the following statement characteristic of MRP or JIT. Highly dependent on the accuracy of data derived from bills of materials, stock records, etc.
A) Characteristic of MRP
B) Characteristic of JIT
A) Characteristic of MRP
B) Characteristic of JIT
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
11
The traditional approach sees inventory as a 'blanket of obscurity' that lies over the production
system, preventing problems being noticed.
system, preventing problems being noticed.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
12
Lean generally has a lower capacity utilisation than a traditional approach to operations.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
13
Just-in-time principles, which once were a radical departure from traditional operations practice,
have now themselves become orthodox.
have now themselves become orthodox.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
14
In lean it is usual to use one specialist large machine rather than several small machines.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
15
The lean approach aims to reduce which of the following?
A) Poor floor layout
B) Rework
C) Work in progress
D) All of the above
A) Poor floor layout
B) Rework
C) Work in progress
D) All of the above
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
16
Producing goods and services exactly when they are needed - not before they are needed, so they wait as inventory, nor after they are needed, so customers have to wait - is called:
A) Precision operations
B) Perfect operations
C) Just-in-time or lean
D) High flexibility
A) Precision operations
B) Perfect operations
C) Just-in-time or lean
D) High flexibility
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
17
The just-in-time approach assumes that each stage in the manufacturing process will place the
parts it produces in an inventory that buffers that stage from the next one downstream in the total
process.
parts it produces in an inventory that buffers that stage from the next one downstream in the total
process.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
18
JIT type approaches have many different names. High capacity operations are a:
A) JIT approach
B) Non-JIT approach
A) JIT approach
B) Non-JIT approach
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
19
Lean does not require:
A) Customer demands met from production, not inventory
B) Focus on high capacity utilisation
C) Dependable supply parts and reliable equipment
D) disruption in production due to quality errors
A) Customer demands met from production, not inventory
B) Focus on high capacity utilisation
C) Dependable supply parts and reliable equipment
D) disruption in production due to quality errors
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
20
Is the following statement characteristic of MRP or JIT.Usually needs a complex, centralised, computer-based organisation to support the necessary hardware.
A) MRP
B) JIT
A) MRP
B) JIT
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
21
What is the term given to the kanban used to signal to a previous stage that material can be withdrawn from inventory and transferred to a specific destination?
A) Customer kanban
B) Production kanban
C) Move or conveyance kanban
D) Vendor kanban
A) Customer kanban
B) Production kanban
C) Move or conveyance kanban
D) Vendor kanban
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
22
Which of the following is NOT true of the 'traditional' view of capacity utilisation?
A) Lower capacity utilisation
B) More production at each stage
C) More stoppages
D) High inventory
A) Lower capacity utilisation
B) More production at each stage
C) More stoppages
D) High inventory
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
23
Which of the following is NOT a type of kanban?
A) Vendor kanban
B) Conveyance kanban
C) Customer kanban
D) Production kanban
A) Vendor kanban
B) Conveyance kanban
C) Customer kanban
D) Production kanban
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
24
Which of the following basic working practices is NOT held to be the basic preparation for implementing lean?
A) Outsourcing
B) Total people involvement
C) Development of personnel
D) Quality of working life
A) Outsourcing
B) Total people involvement
C) Development of personnel
D) Quality of working life
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following is NOT true of kanban?
A) Parts are always pulled by a succeeding process.
B) No parts are started without a kanban card.
C) The time period should be made shorter.
D) The number of kanbans should remain the same.
A) Parts are always pulled by a succeeding process.
B) No parts are started without a kanban card.
C) The time period should be made shorter.
D) The number of kanbans should remain the same.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
26
Which of the following is NOT a visibility measure?
A) SPC charts
B) Demand forecasts
C) Kanbans
D) Coloured lights indicating stoppages
A) SPC charts
B) Demand forecasts
C) Kanbans
D) Coloured lights indicating stoppages
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
27
Heijunka is the Japanese name for:
A) Continuous improvement
B) Total productive maintenance
C) Levelled scheduling
D) Total people involvement
A) Continuous improvement
B) Total productive maintenance
C) Levelled scheduling
D) Total people involvement
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
28
The time taken to change over the process from one activity to the next is defined as:
A) Start-up time
B) Changeover time
C) Set-up time
D) Downtime
A) Start-up time
B) Changeover time
C) Set-up time
D) Downtime
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
29
Kaizen is the Japanese word for:
A) Respect-for-humans
B) Employee involvement
C) Continuous improvement
D) Elimination of waste
A) Respect-for-humans
B) Employee involvement
C) Continuous improvement
D) Elimination of waste
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
30
Depending on the type of kanban being used, the principles applied will vary.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
31
Which of the following is NOT a major method of achieving the transfer of internal set-up work to external work?
A) Improving the loading and unloading of new tools.
B) Presetting tools.
C) Investing in fewer large machines.
D) Attaching different tools to a standard fixture.
A) Improving the loading and unloading of new tools.
B) Presetting tools.
C) Investing in fewer large machines.
D) Attaching different tools to a standard fixture.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
32
Which of the following basic working practices is NOT held to be the basic preparation for implementing lean?
A) Flexibility
B) High pay
C) Autonomy
D) Discipline
A) Flexibility
B) High pay
C) Autonomy
D) Discipline
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
33
Simply shouting 'send some more!' is a verbal form of kanban.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
34
Lean tends to involve using:
A) Large machines
B) Multiple-sourcing strategies
C) Few staff
D) Small machines
A) Large machines
B) Multiple-sourcing strategies
C) Few staff
D) Small machines
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
35
Which of the following is NOT part of the lean philosophy of operations?
A) Continuous improvement
B) Elimination of waste
C) More production at each stage
D) Total people involvement
A) Continuous improvement
B) Elimination of waste
C) More production at each stage
D) Total people involvement
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
36
Many companies implementing lean have consistent pay structures that do not differentiate
between full-time staff and hourly rated staff.
between full-time staff and hourly rated staff.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
37
Kanban is sometimes called the:
A) Invisible conveyor
B) Materials planner
C) Inventory destroyer
D) Signal system
A) Invisible conveyor
B) Materials planner
C) Inventory destroyer
D) Signal system
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck
38
Which of the following methods is NOT used to reduce set-up time in the lean approach?
A) The reduction in search for tools and equipment.
B) The practice of set-up routines.
C) The investment in large machinery.
D) The pre-preparation of tasks.
A) The reduction in search for tools and equipment.
B) The practice of set-up routines.
C) The investment in large machinery.
D) The pre-preparation of tasks.
Unlock Deck
Unlock for access to all 38 flashcards in this deck.
Unlock Deck
k this deck