Deck 12: Panelboard Selection and Installation
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/20
Play
Full screen (f)
Deck 12: Panelboard Selection and Installation
1
All working spaces must allow for the opening of equipment doors and hinged panels to at least a degree position.
A)45
B)60
C)90
D)135
A)45
B)60
C)90
D)135
C
2
What are the three conditions related to live parts and working space?
Condition 1-Exposed live parts on one side of the working space and no live or grounded parts on the other side of the working space, or exposed live parts on both sides of the working space that are effectively guarded by insulating materials.
Condition 2-Exposed live parts on one side of the working space and grounded parts on the other
side of the working space.Concrete, brick, or tile walls are considered as grounded.
Condition 3-Exposed live parts on both sides of the working space.
Condition 2-Exposed live parts on one side of the working space and grounded parts on the other
side of the working space.Concrete, brick, or tile walls are considered as grounded.
Condition 3-Exposed live parts on both sides of the working space.
3
The circuit directory gives the " " in a wording that would be clear for "nonelectrical" people to decipher and identify the circuit number for luminaires, receptacles, appliances, or equipment.
A)area
B)load plan
C)load/area
D)path
A)area
B)load plan
C)load/area
D)path
C
4
What are the requirements for preparing a circuit directory?
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
5
The reasoning for identifying the system voltage(s) and phases is .
A)safety
B)registration
C)precision
D)scheduling
A)safety
B)registration
C)precision
D)scheduling
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
6
What is the difference between past and current usages of the term panelboard?
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
7
Most large commercial buildings use two voltages: 480Y/277 volts and /120 volts.
A)480 delta
B)365Y
C)208 delta
D)208Y
A)480 delta
B)365Y
C)208 delta
D)208Y
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
8
Working space height is required to not be less than ft.(2.0 m).
A)5.5
B)6.5
C)7.5
D)8.5
A)5.5
B)6.5
C)7.5
D)8.5
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
9
Separate feeders are to be run from the main service equipment to each of the areas of the commercial building. Each feeder will terminate in a , which generally will be installed in the area to be served.
A)panelboard
B)switchboard
C)fusebox
D)lightboard
A)panelboard
B)switchboard
C)fusebox
D)lightboard
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
10
In general, panelboards are constructed so the run vertically for nearly the height of the panelboard.
A)branch circuits
B)receptacles
C)snap switches
D)main feed busbars
A)branch circuits
B)receptacles
C)snap switches
D)main feed busbars
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
11
What are the requirements for panelboard cabinet sizing?
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
12
Access to and egress from refer to the actual working space requirements about electrical equipment, not to the ____.
A)room itself
B)doorway
C)panelboard
D)circuitry
A)room itself
B)doorway
C)panelboard
D)circuitry
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
13
When using a 3-phase supply, the incremental number for determining overcurrent devices is poles.
A)3
B)6
C)10
D)12
A)3
B)6
C)10
D)12
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
14
What should you do if there are unused openings in a panelboard?
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
15
Conductors for 480Y/277-volt systems are generally brown, orange, for the ungrounded conductors and gray for the grounded conductor..
A)green
B)black
C)yellow
D)blue
A)green
B)black
C)yellow
D)blue
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
16
Do not confuse the term with room.
A)building
B)working space
C)access point
D)job area
A)building
B)working space
C)access point
D)job area
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
17
For system voltages of 0 to 150 volts to ground, the minimum depth of working space is ft.(914 mm).
A)1
B)2
C)3
D)4
A)1
B)2
C)3
D)4
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
18
Often a feeder serves two or more panelboards, in which case either a(n) or wireway is installed or the feeder connects to the first panelboard and then is extended to the others.
A)ell
B)tee
C)junction box
D)fusebox
A)ell
B)tee
C)junction box
D)fusebox
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
19
NEC 408.36(A) stipulates that if the panelboard contains snap switches with a rating of amperes or less, the panelboard overcurrent protection is not permitted to exceed 200 amperes.
A)15
B)30
C)50
D)100
A)15
B)30
C)50
D)100
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
20
The feeder overcurrent protection is sized for the of the feeder conductor.
A)dimensions
B)ampacity
C)resistance
D)voltage drop
A)dimensions
B)ampacity
C)resistance
D)voltage drop
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck