Deck 15: Framing Systems
1
Poles, which are treated to be insect and rot resistant, are set several feet in the ground and ____ feet apart.
A) 8 to 12
B) 8 to 16
C) 9 to 15
D) 10 to 15
A) 8 to 12
B) 8 to 16
C) 9 to 15
D) 10 to 15
A
2
In platform framing, nonload bearing interior walls, called ____, are framed the same as exterior walls.
A) partitions
B) studs
C) soles
D) frames
A) partitions
B) studs
C) soles
D) frames
A
3

A) sheathing
B) foundations
C) energy-saving construction
D) wracking
D
4
Diagonal braces can be attached to the wall framing at the corners to prevent wracking.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
5
Post-and-beam framing uses ____.
A) closely spaced members
B) no members
C) lightweight members
D) heavy framing members
A) closely spaced members
B) no members
C) lightweight members
D) heavy framing members
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
6
Balloon framing is characterized by closely spaced, heavyweight framing members.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
7
In both platform-frame and balloon-frame construction, the structural frame of the walls is covered with ____.
A) sheathing
B) sills
C) headers
D) plates
A) sheathing
B) sills
C) headers
D) plates
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
8
____ framing is the type of framing used in most houses built in the last 60 years.
A) Post-and-beam
B) Energy-saving
C) Western
D) Balloon
A) Post-and-beam
B) Energy-saving
C) Western
D) Balloon
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
9
Platform framing is also called balloon framing.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
10
Wall ____ are the main framing members in walls.
A) partitions
B) plates
C) soles
D) studs
A) partitions
B) plates
C) soles
D) studs
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
11
____ is the tendency of all the studs to move, as in a parallelogram, allowing the wall to collapse to the side.
A) Triangulation
B) Bracing
C) Sheathing
D) Wracking
A) Triangulation
B) Bracing
C) Sheathing
D) Wracking
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
12
Wracking can be prevented by ____.
A) avoiding plywood
B) removing sheathing from the corners
C) not attaching anything to the wall framing
D) attaching diagonal braces at the corners
A) avoiding plywood
B) removing sheathing from the corners
C) not attaching anything to the wall framing
D) attaching diagonal braces at the corners
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
13
In balloon framing, floor framing at intermediate levels is supported by let-in ____ boards.
A) joist
B) ribbon
C) wracking
D) sheath
A) joist
B) ribbon
C) wracking
D) sheath
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
14
In areas where hurricanes and high tides are a threat, some houses are built as pole structures.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
15
The advantages of structural integrated panels (SIPs) are that they do not include the number of interior framing members that frame construction does, so they do a better job of thermal insulation.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
16
Post-and-beam framing is ____.
A) never left exposed
B) quicker to erect
C) more wasteful of material than other types of framing
D) exceptionally lightweight
A) never left exposed
B) quicker to erect
C) more wasteful of material than other types of framing
D) exceptionally lightweight
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
17
A band joist, or ____, is bolted to poles when constructing pole buildings.
A) foundation
B) wracking
C) sheathing
D) header
A) foundation
B) wracking
C) sheathing
D) header
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
18
Pole buildings are a variation of ____ construction.
A) platform
B) western
C) post-and-beam
D) balloon
A) platform
B) western
C) post-and-beam
D) balloon
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
19
In pure post-and-beam construction, the exterior walls have widely spaced posts, where the space is filled in with nonload-bearing curtain walls.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
20
The bottoms of the studs are held in position by a bottom (or ____) plate.
A) sole
B) partition
C) rafter
D) joist
A) sole
B) partition
C) rafter
D) joist
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
21
When installing nonmetallic-sheathed cable through wood wall studs and floor joists, the cable must be installed at least ____ inch(es) from the nearest edge.
A) 1/2
B) 3/4
C) 1
D) 1 1/4
A) 1/2
B) 3/4
C) 1
D) 1 1/4
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
22
In conventional framing, ____ pieces are used to frame the corner of a wall.
A) two
B) three
C) four
D) five
A) two
B) three
C) four
D) five
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
23
__________ is also very popular in home building where termites and water damage are known to be problems.
A) Wood framing
B) Metal framing
C) Balloon framing
D) Platform framing
A) Wood framing
B) Metal framing
C) Balloon framing
D) Platform framing
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
24
When wall framing is done with 2 × 4s spaced 16 inches on centers, up to ____ percent of the wall is solid wood.
A) 10
B) 25
C) 50
D) 75
A) 10
B) 25
C) 50
D) 75
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
25
In energy-saving construction, a piece which normally provides a nailing surface for the interior ____ is replaced by metal clips.
A) plate
B) subfloor
C) drywall
D) rafter
A) plate
B) subfloor
C) drywall
D) rafter
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
26
____ framing is used extensively in commercial construction where the strength of structural steel or reinforced concrete is not required.
A) Light-gauge metal
B) Aluminum beam
C) Metal foil
D) Precious metal
A) Light-gauge metal
B) Aluminum beam
C) Metal foil
D) Precious metal