Deck 17: Floor Framing
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/27
Play
Full screen (f)
Deck 17: Floor Framing
1
The entire construction of the floor frame at the top of the foundation is called sill construction or the ____.
A) framing
B) frame joist
C) box sill
D) floor joist
A) framing
B) frame joist
C) box sill
D) floor joist
C
2
All lumber in contact with the foundation, along with sill plate, must be pressure treated with an approved chemical to prevent decay.
True
3

A) LVL
B) metal C shape
C) solid wood
D) trussed
A
4
In the simplest building, ____.
A) joists are supported by a combination of girders, beams, and load-bearing walls
B) joists are supported by multiple girders
C) all joists run in the same direction
D) joists are positioned at angles to each other
A) joists are supported by a combination of girders, beams, and load-bearing walls
B) joists are supported by multiple girders
C) all joists run in the same direction
D) joists are positioned at angles to each other
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
5
All lumber in contact with the foundation, including the sill plate, must be ____ (PT) with an approved chemical to prevent decay.
A) pure timbered
B) pure treated
C) partially tempered
D) pressure treated
A) pure timbered
B) pure treated
C) partially tempered
D) pressure treated
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
6
The size, direction, and spacing of floor joists are usually given on _____.
A) the exterior elevations
B) a longitudinal section
C) the foundation plan or floor plan below.
D) the floor plan for the floor the joist are on.
A) the exterior elevations
B) a longitudinal section
C) the foundation plan or floor plan below.
D) the floor plan for the floor the joist are on.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
7
Sill sealer is incompressible.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
8
Metal floor joists are rarely used in commercial and industrial construction.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
9

A) laminated
B) metal C shape
C) solid wood
D) trussed
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
10
Where stairs and chimneys pass through the floor frame, some of the joists must be cut out to form an opening.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
11
To prevent the sill plate from coming in direct contact with the foundation and to seal any small gaps, a ____ is often included.
A) box sill
B) sill sealer
C) sill joist
D) floor joist
A) box sill
B) sill sealer
C) sill joist
D) floor joist
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
12
The joist headers are easily identified on the framing plan, but their exact position should be checked on the detail drawings.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
13
A termite shield is a continuous ____ shield that prevents termites from getting to the wood superstructure.
A) wooden
B) metal
C) concrete
D) masonry
A) wooden
B) metal
C) concrete
D) masonry
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
14
Lengths of framing members are usually included on framing plans.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
15
The size and spacing of material to be used for floor framing ____.
A) are not important
B) can be calculated from first principles
C) are communicated separately
D) are given on the framing plan by a note
A) are not important
B) can be calculated from first principles
C) are communicated separately
D) are given on the framing plan by a note
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
16
A common type of engineered wood joists is the ____, consisting of a top and bottom rib of solid wood and a thinner plywood web between the ribs.
A) L-joist
B) T-joist
C) Re-joist
D) I-joist
A) L-joist
B) T-joist
C) Re-joist
D) I-joist
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
17

A) laminated
B) metal C shape
C) solid wood
D) trussed
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
18
____ are the parallel framing members that make up most of the floor framing.
A) Sill plates
B) Floor joists
C) Box sills
D) Sill sealers
A) Sill plates
B) Floor joists
C) Box sills
D) Sill sealers
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
19
Where nonmetallic-sheathed cable is installed through metal studs or floor joists, a ____ or grommet must be installed prior to installing the cable.
A) bolt
B) truss
C) sill
D) bushing
A) bolt
B) truss
C) sill
D) bushing
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
20
Where the framing rests on concrete or masonry foundation walls, the piece in contact with the foundation is called the ____.
A) sill plate
B) sill sealer
C) box sill
D) floor joist
A) sill plate
B) sill sealer
C) box sill
D) floor joist
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
21
The number of joists and headers required around openings of various sizes ____.
A) can be calculated
B) is constant
C) is not shown on framing plans
D) is spelled out in building codes
A) can be calculated
B) is constant
C) is not shown on framing plans
D) is spelled out in building codes
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
22
Being more dimensionally stable, ____ are less apt to cause weaknesses in the structure or openings for air infiltration.
A) metal joists
B) I-joists
C) cast iron joists
D) L-joists
A) metal joists
B) I-joists
C) cast iron joists
D) L-joists
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
23
Floor framing can be ____ to create a seemingly unsupported deck.
A) garrisoned
B) cantilevered
C) framed
D) joisted
A) garrisoned
B) cantilevered
C) framed
D) joisted
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
24
The technique used extensively for balconies, under bay windows, and for garrison-style houses is _______.
A) cantilevered framing
B) garrisoned framing
C) girdered framing
D) framing
A) cantilevered framing
B) garrisoned framing
C) girdered framing
D) framing
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
25

A) uniformly
B) in a random fashion
C) without regard to the exterior finish
D) according to the exterior finish to be used
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
26
____ framing consists of joists that project beyond the bearing surface to create a wide overhang.
A) Silled
B) Shielded
C) Cantilevered
D) Girdered
A) Silled
B) Shielded
C) Cantilevered
D) Girdered
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
27
Sometimes joists are cut to form an opening. The ends of these joists are supported by ____.
A) headers made of a single member
B) headers made of two or more members
C) bearing plates made by three members
D) sills made of LVL
A) headers made of a single member
B) headers made of two or more members
C) bearing plates made by three members
D) sills made of LVL
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck