Deck 8: Surveying and Linear Measurements

Full screen (f)
exit full mode
Question
……………… is used for large scale.

A)Single line field book.
B)Double line field book.
C)none
D)all
Use Space or
up arrow
down arrow
to flip the card.
Question
Longest survey line passing through the center of the area to be surveyed is called as…..

A)Tie line
B)Base line
C)Check line
D)Offsets
Question
A line joining apex of triangle to a fixed point on the opposite side is called…..

A)Tie line
B)Base line
C)Check line
D)Offsets
Question
The length of survey line measured with a 20 m chain was found to be 327 m. If the chain was 3cm too long. Calculate the true length of the line.

A)425m
B)372 m
C)45 m
D)342 m
Question
It is possible to set out angles of 0' to 3° with help of ……….cross staff.

A)French cross staff
B)Open cross staff
C)Adjustable cross staff
D)Simple cross staff
Question
It is possible to set out angles 45° or 90° with help of ……….cross staff.

A)French cross staff
B)Open cross staff
C)Adjustable cross staff
D)Simple cross staff
Question
To mark position of station …………. is used.

A)Pegs
B)Arrow
C)none
D)all
Question
Which of the following is made in connection with the construction of streets, water supply systems, sewers?

A)Traverse surveying
B)Hydrographic surveying
C)Cadastral surveying
D)City surveying
Question
190°Determining the relative positions of points on above or beneath the surface of the earth by means of direct or indirect measurements of distance and direction and elevation is called as _________

A)Surveying
B)Levelling
C)Measuring
D)Contouring
Question
Type of surveying in which the shape of the earth taken into account is __________

A)Topographic Surveying
B)Hydrographic Surveying
C)Geodetic Surveying
D)Plane Surveying
Question
Which of the following is not among the methods of linear measurements?

A)Direct measurements
B)Measurements by optical means
C)Indirect measurements
D)Electromagnetic methods or EDM
Question
In which method measurements of distances are chiefly confined to the preliminary surveys and explorations where a surveyor is called upon to make a rough survey as quickly as possible?

A)Chaining
B)Pacing
C)Measurements with passometer
D)Measurements with theodolite
Question
Instrument shaped like a watch and is carried in pocket or attached to one leg is _______

A)Pedometer
B)Odometer
C)Passometer
D)Speedometer
Question
Instrument for registering the number of revolutions of a wheel is _____

A)Odometer
B)Pedometer.
C)Pedometer
D)Chaining
Question
What is required to transfer points to the ground, while chaining along the sloping ground?

A)Spirit level
B)Plumb bob
C)Butt rod
D)Pegs
Question
Chains are made up of ______

A)High steel carbon
B)Galvanized mild steel
C)Copper coated iron
D)Iron
Question
What is provided at every meter in case of 20m and 30° chains?

A)Tallies
B)Pegs
C)Arrows
D)Brass rings
Question
Which of the following tape is not made?

A)Linen tape
B)Invar tape
C)Steel tape
D)Iron tape
Question
Direct ranging is done when the two ends of the survey lines are _______

A)Invisible
B)Intervisible
C)Visible from a particular point
D)Faraway from each other
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/19
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 8: Surveying and Linear Measurements
1
……………… is used for large scale.

A)Single line field book.
B)Double line field book.
C)none
D)all
Single line field book.
2
Longest survey line passing through the center of the area to be surveyed is called as…..

A)Tie line
B)Base line
C)Check line
D)Offsets
Base line
3
A line joining apex of triangle to a fixed point on the opposite side is called…..

A)Tie line
B)Base line
C)Check line
D)Offsets
Check line
4
The length of survey line measured with a 20 m chain was found to be 327 m. If the chain was 3cm too long. Calculate the true length of the line.

A)425m
B)372 m
C)45 m
D)342 m
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
5
It is possible to set out angles of 0' to 3° with help of ……….cross staff.

A)French cross staff
B)Open cross staff
C)Adjustable cross staff
D)Simple cross staff
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
6
It is possible to set out angles 45° or 90° with help of ……….cross staff.

A)French cross staff
B)Open cross staff
C)Adjustable cross staff
D)Simple cross staff
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
7
To mark position of station …………. is used.

A)Pegs
B)Arrow
C)none
D)all
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
8
Which of the following is made in connection with the construction of streets, water supply systems, sewers?

A)Traverse surveying
B)Hydrographic surveying
C)Cadastral surveying
D)City surveying
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
9
190°Determining the relative positions of points on above or beneath the surface of the earth by means of direct or indirect measurements of distance and direction and elevation is called as _________

A)Surveying
B)Levelling
C)Measuring
D)Contouring
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
10
Type of surveying in which the shape of the earth taken into account is __________

A)Topographic Surveying
B)Hydrographic Surveying
C)Geodetic Surveying
D)Plane Surveying
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
11
Which of the following is not among the methods of linear measurements?

A)Direct measurements
B)Measurements by optical means
C)Indirect measurements
D)Electromagnetic methods or EDM
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
12
In which method measurements of distances are chiefly confined to the preliminary surveys and explorations where a surveyor is called upon to make a rough survey as quickly as possible?

A)Chaining
B)Pacing
C)Measurements with passometer
D)Measurements with theodolite
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
13
Instrument shaped like a watch and is carried in pocket or attached to one leg is _______

A)Pedometer
B)Odometer
C)Passometer
D)Speedometer
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
14
Instrument for registering the number of revolutions of a wheel is _____

A)Odometer
B)Pedometer.
C)Pedometer
D)Chaining
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
15
What is required to transfer points to the ground, while chaining along the sloping ground?

A)Spirit level
B)Plumb bob
C)Butt rod
D)Pegs
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
16
Chains are made up of ______

A)High steel carbon
B)Galvanized mild steel
C)Copper coated iron
D)Iron
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
17
What is provided at every meter in case of 20m and 30° chains?

A)Tallies
B)Pegs
C)Arrows
D)Brass rings
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
18
Which of the following tape is not made?

A)Linen tape
B)Invar tape
C)Steel tape
D)Iron tape
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
19
Direct ranging is done when the two ends of the survey lines are _______

A)Invisible
B)Intervisible
C)Visible from a particular point
D)Faraway from each other
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 19 flashcards in this deck.