Question
Software project management comprises of a number of activities, which contains _.

A)system software
B)application softwarec
C)scienti?c software
D)none
Use Space or
up arrow
down arrow
to flip the card.
Question
Software is de?ned as ____ .

A)instructions
B)data structures
C)documents
D)all above
Question
What are the signs that a software project is in trouble

A)the product scope is poorly de?ned.
B)deadlines are unrealistic.
C)changes are managed poorly.
D)all of the above
Question
A Project can be characterized as _ .

A)every project may not have a unique and distinct goal.
B)project is routine activity or day-to-day operations.
C)project does not comes with a start time and end time.
D)none
Question
CMM model in Software Engineering is a technique of ______ .

A)develop the software.
B)improve the software process.
C)improve the testing process.
D)all of above
Question
Project risk factor is considered in which model

A)spiral model
B)waterfall model
C)prototyping model
D)none of the above.
Question
Effective software project management focuses on the four P's. What are those four P's?

A)people, performance, payment, product
B)people, product, process, project
C)people, product, performance, project
D)all
Question
What are the signs that a software project is in trouble?

A)the product scope is poorly de?ned.
B)deadlines are unrealistic.
C)changes are managed poorly.
D)all
Question
Software quality assurance is an umbrella activity.
Question
Which of the following are the valid relationships in Use Case Diagrams

A)generalization
B)include
C)extend
D)all
Question
Which one of the following is not an Evolutionary Process Model?

A)winwin spiral model
B)incremental model
C)concurrent development model
D)all of the mentioned
Question
The Incremental Model is a result of combination of elements of which two models?

A)build & fix model & waterfall model
B)linear model & rad model
C)linear model & prototyping model
D)waterfall model & rad model
Question
The spiral model was originally proposed by

A)ibm
B)barry boehm
C)pressman
D)royce
Question
Spiral Model has user involvement in all its phases.
Question
If you were to create client/server applications, which model would you go for?

A)winwin spiral model
B)spiral model
C)concurrent model
D)incremental model
Question
Which of the following is not a phase of SDLC?

A)requirement gathering
B)maintenance
C)testing
D)all
Question
Selection of particular life cycle model is based on,

A)requirements
B)technical knowledge of development team
C)users
D)all
Question
Which of the following are incremental developmental models?

A)prototyping
B)agile development
C)both a and b
D)none
Question
In a college,students are asked to develop a software. Which model would be preferable

A)waterfall model
B)spiral model
C)aglie model
D)code nad ?x model
Question
In waterfall model, output of one phase is input to next phase.
Question
The ?rst step in Software Development Life Cycle(SDLC) is

A)preliminary investigation and analysis
B)system design
C)system testing
D)coding
Question
The detailed study of existing system is referred to as :

A)system planning
B)system analysis
C)feasibility study
D)design dfd
Question
System analysis and design phase of Software Development Life Cycle (SDLC)

A)parallel run
B)sizing
C)all of these
D)speci?cations freeze
Question
Prototyping aims at :

A)end user understanding and approval
B)program logic
C)program logic.
D)none of these
Question
What is a prototype ?

A)mini-model of existing system
B)mini-model of the proposed system
C)working model of the existing system
D)none
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/25
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 1: Software Project Management and Development Models
1
Software project management comprises of a number of activities, which contains _.

A)system software
B)application softwarec
C)scienti?c software
D)none
system software
2
Software is de?ned as ____ .

A)instructions
B)data structures
C)documents
D)all above
all above
3
What are the signs that a software project is in trouble

A)the product scope is poorly de?ned.
B)deadlines are unrealistic.
C)changes are managed poorly.
D)all of the above
all of the above
4
A Project can be characterized as _ .

A)every project may not have a unique and distinct goal.
B)project is routine activity or day-to-day operations.
C)project does not comes with a start time and end time.
D)none
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
5
CMM model in Software Engineering is a technique of ______ .

A)develop the software.
B)improve the software process.
C)improve the testing process.
D)all of above
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
6
Project risk factor is considered in which model

A)spiral model
B)waterfall model
C)prototyping model
D)none of the above.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
7
Effective software project management focuses on the four P's. What are those four P's?

A)people, performance, payment, product
B)people, product, process, project
C)people, product, performance, project
D)all
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
8
What are the signs that a software project is in trouble?

A)the product scope is poorly de?ned.
B)deadlines are unrealistic.
C)changes are managed poorly.
D)all
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
9
Software quality assurance is an umbrella activity.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
10
Which of the following are the valid relationships in Use Case Diagrams

A)generalization
B)include
C)extend
D)all
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
11
Which one of the following is not an Evolutionary Process Model?

A)winwin spiral model
B)incremental model
C)concurrent development model
D)all of the mentioned
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
12
The Incremental Model is a result of combination of elements of which two models?

A)build & fix model & waterfall model
B)linear model & rad model
C)linear model & prototyping model
D)waterfall model & rad model
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
13
The spiral model was originally proposed by

A)ibm
B)barry boehm
C)pressman
D)royce
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
14
Spiral Model has user involvement in all its phases.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
15
If you were to create client/server applications, which model would you go for?

A)winwin spiral model
B)spiral model
C)concurrent model
D)incremental model
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
16
Which of the following is not a phase of SDLC?

A)requirement gathering
B)maintenance
C)testing
D)all
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
17
Selection of particular life cycle model is based on,

A)requirements
B)technical knowledge of development team
C)users
D)all
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
18
Which of the following are incremental developmental models?

A)prototyping
B)agile development
C)both a and b
D)none
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
19
In a college,students are asked to develop a software. Which model would be preferable

A)waterfall model
B)spiral model
C)aglie model
D)code nad ?x model
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
20
In waterfall model, output of one phase is input to next phase.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
21
The ?rst step in Software Development Life Cycle(SDLC) is

A)preliminary investigation and analysis
B)system design
C)system testing
D)coding
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
22
The detailed study of existing system is referred to as :

A)system planning
B)system analysis
C)feasibility study
D)design dfd
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
23
System analysis and design phase of Software Development Life Cycle (SDLC)

A)parallel run
B)sizing
C)all of these
D)speci?cations freeze
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
24
Prototyping aims at :

A)end user understanding and approval
B)program logic
C)program logic.
D)none of these
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
25
What is a prototype ?

A)mini-model of existing system
B)mini-model of the proposed system
C)working model of the existing system
D)none
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 25 flashcards in this deck.