Establishing a relationship with a customer is a project initiation activity.
Use Space or
up arrow
down arrow
to flip the card.
Question
COCOMO uses parameters that are derived from estimates of planned projects of the same complexity to estimate project size and cost.
Question
The focus of project management is to ensure that systems development projects meet customer expectations and are delivered within budget and time constraints.
Question
Task sequence depends on which tasks produce deliverables needed in other tasks, when critical resources are available, the constraints placed on the project by the client, and the process outlined in the SDLC.
Question
In order to determine the resources required for project completion, an organization should analyze the project's scope and determine the project's probability of successful completion.
Question
The project workbook serves as a repository for all project correspondence, inputs, outputs, deliverables, procedures, and standards established by the project team.
Question
Creating a work breakdown structure requires that you decompose phases into activities and activities into specific tasks.
Question
During project initiation, the focus of developing a communication plan activity is to collect and organize the tools that will be used while managing the project.
Question
A resource analysis plan determines if the proposed information system makes sense for the organization from an economic and operational standpoint.
Question
Project planning is the first phase of the project management process in which activities are performed to assess the size, scope, and complexity of the project and to establish procedures to support later project activities.
Question
Project time estimates for task completion and overall system quality are not significantly influenced by the assignment of people to tasks.
Question
A logic model is a graphical representation of a project that shows each task as a horizontal bar whose length is proportional to its time for completion.
Question
A systems development project may be undertaken to take advantage of business opportunities or to solve business problems.
Question
A deliverable is an end product in a phase of the SDLC.
Question
Project planning involves defining clear, discrete activities and the work needed to complete each activity within a single project.
Question
Gantt charts show how tasks must be ordered and when an activity should begin and end.
Question
The project manager is responsible for initiating, planning, executing, and closing down the project.
Question
The most instrumental person to the successful completion of a project is the database analyst.
Question
The Constructive Cost Model is a method for estimating a software project's size and cost.
Question
Project initiation is the second phase of the project management process, which focuses on defining clear, discrete activities and the work needed to complete each activity within a single project.
Question
The focus of closing the customer contract activity is to ensure that all contractual terms of the project have been met.
Question
Variable expenses are any person, group of people, piece of equipment, or material used in accomplishing an activity.
Question
Team members are assessed as part of the conducting postproject reviews activity.
Question
A network diagram depicts project tasks and their interrelationships.
Question
When executing the baseline project plan, the project manager will initiate the execution of project activities, acquire and assign resources, orient and train new team members, keep the project on schedule, and assure the quality of project deliverables.
Question
If an activity's optimistic time is four days, its realistic time is 10 days, and its pessimistic time is 25 days, then its estimated time would be 11.5 days.
Question
The ability to easily make changes to a project is a very powerful feature of most project management environments.
Question
A slipped completion date for an activity may initiate a change to the baseline project plan.
Question
Projects are deemed a success or failure at project closedown.
Question
A baseline project plan is developed during the project execution phase.
Question
A planned undertaking of related activities to reach an objective that has a beginning and an end best defines:

A) task development.
B) activity plan.
C) project.
D) task schedule.
E) project mission.
Question
During the development of a preliminary schedule activity conducted during the project planning phase, you specify how various deliverables are produced and tested by you and your project team.
Question
A project can terminate naturally or unnaturally.
Question
An activity on the critical path will have a slack time of 1.
Question
The hallway discussion project team communication method has a medium to a high formality rating.
Question
Critical path scheduling is a scheduling technique whose order and duration of a sequence of task activities directly affect the completion date of a project.
Question
The status report project team communication method is used to inform project team members.
Question
The meetings project team communication method has a low formality rating.
Question
Gantt charts visually show the time overlap of tasks whereas a network diagram does not show time overlap but does show which tasks could be done in parallel.
Question
Gantt charts do not show how tasks must be ordered.
Question
Which of the following is NOT a True statement regarding project planning?

A) Project planning often requires that you make numerous assumptions about resource availability and potential problems.
B) Project planning is the second phase of the project management process.
C) Project planning focuses on defining clear, discrete activities and the work needed to complete each activity within a single project.
D) The repetitive nature of the project management process requires that plans be constantly monitored throughout the project and periodically updated.
E) Monitoring project progress against the baseline project plan is the first project planning activity.
Question
Skills that include interpreting system requests and specifications, site preparation and user training, and contact point for customers best represent:

A) leadership.
B) management.
C) customer relations.
D) conflict management.
E) team management.
Question
An individual with a diverse set of skills-management, leadership, technical, conflict management, and customer relationship-who is responsible for initiating, planning, executing, and closing down a project best defines:

A) chief information officer.
B) consultant.
C) project scheduler.
D) project manager.
E) end user.
Question
The phase of the project management process in which activities are performed to assess the size, scope, and complexity of the project and to establish procedures to support later project activities best defines:

A) project initiation.
B) scope development.
C) project planning.
D) project assessment.
E) project design.
Question
Skills that include defining and sequencing activities, communicating expectations, assigning resources to activities, and monitoring outcomes best represent:

A) customer relations.
B) leadership.
C) team management.
D) management.
E) technical problem solving.
Question
Which of the following is NOT a task characteristic?

A) A task should have well-accepted predecessor and successor steps.
B) A task should have a single and identifiable deliverable.
C) A task should have a known method or technique.
D) A task should be completed by only one person.
E) A task is measurable so that percent completed can be determined.
Question
Defining the necessary activities required to organize the initiation team while they are working to define the scope of the project is the focus of which of the following activities?

A) Establishing the project initiation team
B) Establishing management procedures
C) Establishing the project management environment and project workbook
D) Dividing the project into manageable tasks
E) Establishing the project initiation plan
Question
An online or hard-copy repository for all project correspondence, inputs, outputs, deliverables, procedures, and standards that is used for performing project audits, orientation of new team members, communicating with management and customers, identifying future projects, and performing post project reviews is called:

A) a project workbook.
B) a schedule book.
C) a project planner.
D) project management software.
E) an electronic calendar.
Question
Identifying, assessing, and managing the risks and day-to-day changes that occur during a project best defines which of the following project manager activities?

A) Conflict management
B) Risk and change management
C) Team management
D) Customer relations
E) Technical problem solving
Question
Arguably, the most instrumental person to the successful completion of any project is the:

A) chief information officer.
B) project manager.
C) end user.
D) staff consultant.
E) department manager.
Question
Which of the following is a True statement regarding project time estimates?

A) Project time estimates for task completion and overall system quality are significantly influenced by the assignment of people to tasks.
B) Resource estimates should not be revised based upon the skills of the actual person assigned to a particular activity.
C) Staff learning can be enhanced by assigning individuals to tasks which are "over their heads."
D) Project time estimates are always on target.
E) Hardware and software are the most important, and expensive, part of project resource planning.
Question
Which of the following is NOT a project management phase?

A) Closing down the project
B) Planning the project
C) Executing the project
D) Initiating a project
E) Implementing the project
Question
Managing conflict within a project team to ensure that conflict is not too high or too low best defines which of the following project manager activities?

A) Conflict management
B) Leadership
C) Team management
D) Problem solving
E) Risk management
Question
Influencing the activities of others toward the attainment of a common goal through the use of intelligence, personality, and abilities refers to which of the following project manager activities?

A) Conflict management
B) Management
C) Leadership
D) Team management
E) Customer relations
Question
A controlled process of initiating, planning, executing, and closing down a project best defines:

A) systems development.
B) project management.
C) project development.
D) systems management.
E) systems development technique.
Question
The process of dividing the project into manageable tasks and logically ordering them to ensure a smooth evolution between tasks defines:

A) task division.
B) work breakdown structure.
C) work structuring.
D) project division.
E) critical path scheduling.
Question
During which of the following project planning activities do you use the information regarding tasks and resource availability to assign time estimates to each activity in the work breakdown structure?

A) Dividing the project into manageable tasks
B) Describing project scope, alternatives, and feasibility
C) Setting a baseline project plan
D) Developing a preliminary schedule
E) Developing a project scope statement
Question
Which of the following project management activities is associated with project initiation?

A) Estimating resources and creating a detailed resource plan
B) Describing project scope, alternatives, and feasibility
C) Establishing a relationship with the customer
D) Identifying and assessing risks
E) Closing down the project
Question
Developing an understanding of the content and complexity of the project is the purpose of:

A) developing a project charter activity of the project planning phase.
B) setting a baseline project plan activity of the project planning phase.
C) determining project standards and procedures activity of the project planning phase.
D) describing the project scope, alternatives, and feasibility activity of the project planning phase.
E) closing down the project activity of the project planning phase.
Question
Which of the following is NOT a project planning activity?

A) Setting a baseline project plan
B) Identifying and assessing risk
C) Determining project standards and procedures
D) Establishing management procedures
E) Developing a project charter
Question
What would be the estimated time for completion if the time estimates for report design are as follows? optimistic = 3 weeks; pessimistic = 9 weeks; realistic = 6 weeks

A) 3 weeks
B) 5 weeks
C) 36 weeks
D) 6 weeks
E) 18 weeks
Question
Which of the following states correctly the formality and use of hallway discussions?

A) In terms of formality, hallway discussions would be rated medium. In terms of use, hallway discussions would be used to inform.
B) In terms of formality, hallway discussions would be rated high. In terms of use, hallway discussions would be used to inform.
C) In terms of formality, hallway discussions would be rated low. In terms of use, hallway discussions would be used to inform and resolve issues.
D) In terms of formality, hallway discussions would be rated high. In terms of use, hallway discussions would serve as a permanent record.
E) In terms of formality, hallway discussions would be rated medium to high. In terms of use, hallway discussions would be used to resolve issues.
Question
The third phase of the project management process in which the plans created in the prior phases are put into action is:

A) project planning.
B) project development.
C) project initiation.
D) project execution.
E) project close down.
Question
Changes to the baseline project plan might be motivated by:

A) a slipped completion date of an activity.
B) a bungled activity that must be redone.
C) the identification of a new activity that becomes evident later in the project.
D) an unforeseen change in personnel due to sickness, resignation, or termination.
E) all of the above.
Question
Ensuring that all contractual terms of the project have been met is done during:

A) conducting postproject reviews.
B) closing the customer contract.
C) setting a baseline project plan.
D) communicating the project status.
E) project implementation.
Question
The responsibility for keeping all team members informed of the project status best describes:

A) monitoring project progress against the baseline project plan.
B) executing the baseline plan.
C) communicating the project status.
D) updating project status.
E) establishing the project initiation plan.
Question
A critical path refers to:

A) a sequence of task activities whose order and durations indirectly affect the completion date of a project.
B) a sequence of task activities whose order and durations directly affect the completion date of a project.
C) a sequence of task activities whose order must be performed in parallel.
D) a sequence of task activities whose duration cannot last more than 40 percent of the time allotted to the project.
E) none of the above.
Question
Realistic time refers to:

A) the maximum period of time for an activity to be completed.
B) the minimum period of time for an activity to be completed.
C) the planner's "best guess" of the amount of time the activity actually will require for completion.
D) the maximum period of time for an entire project to be completed.
E) the average period of time for an activity to be completed.
Question
What would be the estimated time for completion if time estimates for programming are as follows? optimistic = 4 weeks; pessimistic = 6 weeks; realistic = 5 weeks

A) 5 weeks
B) 6 weeks
C) 15 weeks
D) 3 weeks
E) 30 weeks
Question
Which of the following occurs during project execution?

A) Monitoring project progress against the baseline project plan
B) Conducting post project reviews
C) Establishing the project initiation plan
D) Establishing the project workbook
E) Establishing the communication plan
Question
Pessimistic time refers to:

A) the maximum period of time for an activity to be completed.
B) the minimum period of time for an activity to be completed.
C) the planner's "best guess" of the amount of time the activity actually will require for completion.
D) the maximum period of time for an entire project to be completed.
E) the average period of time for an activity to be completed.
Question
Which of the following states correctly the formality and use of a project workbook?

A) In terms of formality, the project workbook would be rated low to medium. In terms of use, the project workbook would be used to inform and serve as a permanent record.
B) In terms of formality, the project workbook would be rated high. In terms of use, the project workbook would be used to resolve issues.
C) In terms of formality, the project workbook would be rated high. In terms of use, the project workbook would be used to inform and serve as a permanent record.
D) In terms of formality, the project workbook would be rated low. In terms of use, the project workbook would be used to resolve issues.
E) In terms of formality, the project workbook would be rated medium to high. In terms of use, the project workbook would be used to resolve issues.
Question
Determining the strengths and weaknesses of project deliverables, the processes used to create them, and the project management process is done during:

A) conducting postproject reviews.
B) closing down the project.
C) establishing the communication plan.
D) communicating the project status.
E) closing the customer contract.
Question
Optimistic time refers to:

A) the maximum period of time for an activity to be completed.
B) the minimum period of time for an activity to be completed.
C) the planner's "best guess" of the amount of time the activity actually will require for completion.
D) the maximum period of time for an entire project to be completed.
E) the average period of time for an activity to be completed.
Question
Indicating when and how written and oral reports will be provided by the team, how team members will coordinate work, what messages will be sent to announce the project to interested parties, and what kinds of information will be shared with vendors and external contractors involved with the project describes:

A) determining project standards and procedures.
B) developing a project scope statement.
C) developing a communication plan.
D) setting a baseline project plan.
E) establishing the project initiation team.
Question
Any person, group of people, piece of equipment, or material used in accomplishing an activity is referred to as a(n):

A) entity.
B) agent.
C) resource.
D) identifier.
E) expense.
Question
The final phase of the project management process that focuses on bringing a project to an end is called:

A) project evaluation.
B) project closedown.
C) project initiation and planning.
D) project review.
E) project implementation.
Question
Risks can arise from:

A) the use of new technology.
B) resistance to change.
C) availability of critical resources.
D) member inexperience with technology or the business area.
E) all of the above.
Question
A scheduling technique where the order and duration of the sequence of activities directly affect the completion date of a project refers to:

A) sequencing strategy.
B) Gantt scheduling.
C) critical path scheduling.
D) activity scheduling.
E) task management.
Question
A technique that uses optimistic, pessimistic, and realistic time to calculate the expected time for a particular task best defines:

A) Gantt.
B) Computer Aided Software Engineering (CASE).
C) Program Evaluation Review Technique (PERT).
D) flowcharting.
E) Unified Modeling Language (UML).
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/94
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 3: Managing the Information Systems Project
1
Establishing a relationship with a customer is a project initiation activity.
True
Explanation: As part of project initiation, the project manager will get to know the customer and the needs of his/her department.
2
COCOMO uses parameters that are derived from estimates of planned projects of the same complexity to estimate project size and cost.
False
Explanation: COCOMO uses parameters that were derived from prior projects of differing complexity.
3
The focus of project management is to ensure that systems development projects meet customer expectations and are delivered within budget and time constraints.
True
Explanation: Project management is an important aspect of the development of information systems and a critical skill for a systems analyst. The focus of project management is to ensure that system development projects meet customer expectations and are delivered within budget and time constraints.
4
Task sequence depends on which tasks produce deliverables needed in other tasks, when critical resources are available, the constraints placed on the project by the client, and the process outlined in the SDLC.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
5
In order to determine the resources required for project completion, an organization should analyze the project's scope and determine the project's probability of successful completion.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
6
The project workbook serves as a repository for all project correspondence, inputs, outputs, deliverables, procedures, and standards established by the project team.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
7
Creating a work breakdown structure requires that you decompose phases into activities and activities into specific tasks.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
8
During project initiation, the focus of developing a communication plan activity is to collect and organize the tools that will be used while managing the project.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
9
A resource analysis plan determines if the proposed information system makes sense for the organization from an economic and operational standpoint.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
10
Project planning is the first phase of the project management process in which activities are performed to assess the size, scope, and complexity of the project and to establish procedures to support later project activities.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
11
Project time estimates for task completion and overall system quality are not significantly influenced by the assignment of people to tasks.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
12
A logic model is a graphical representation of a project that shows each task as a horizontal bar whose length is proportional to its time for completion.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
13
A systems development project may be undertaken to take advantage of business opportunities or to solve business problems.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
14
A deliverable is an end product in a phase of the SDLC.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
15
Project planning involves defining clear, discrete activities and the work needed to complete each activity within a single project.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
16
Gantt charts show how tasks must be ordered and when an activity should begin and end.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
17
The project manager is responsible for initiating, planning, executing, and closing down the project.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
18
The most instrumental person to the successful completion of a project is the database analyst.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
19
The Constructive Cost Model is a method for estimating a software project's size and cost.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
20
Project initiation is the second phase of the project management process, which focuses on defining clear, discrete activities and the work needed to complete each activity within a single project.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
21
The focus of closing the customer contract activity is to ensure that all contractual terms of the project have been met.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
22
Variable expenses are any person, group of people, piece of equipment, or material used in accomplishing an activity.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
23
Team members are assessed as part of the conducting postproject reviews activity.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
24
A network diagram depicts project tasks and their interrelationships.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
25
When executing the baseline project plan, the project manager will initiate the execution of project activities, acquire and assign resources, orient and train new team members, keep the project on schedule, and assure the quality of project deliverables.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
26
If an activity's optimistic time is four days, its realistic time is 10 days, and its pessimistic time is 25 days, then its estimated time would be 11.5 days.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
27
The ability to easily make changes to a project is a very powerful feature of most project management environments.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
28
A slipped completion date for an activity may initiate a change to the baseline project plan.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
29
Projects are deemed a success or failure at project closedown.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
30
A baseline project plan is developed during the project execution phase.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
31
A planned undertaking of related activities to reach an objective that has a beginning and an end best defines:

A) task development.
B) activity plan.
C) project.
D) task schedule.
E) project mission.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
32
During the development of a preliminary schedule activity conducted during the project planning phase, you specify how various deliverables are produced and tested by you and your project team.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
33
A project can terminate naturally or unnaturally.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
34
An activity on the critical path will have a slack time of 1.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
35
The hallway discussion project team communication method has a medium to a high formality rating.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
36
Critical path scheduling is a scheduling technique whose order and duration of a sequence of task activities directly affect the completion date of a project.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
37
The status report project team communication method is used to inform project team members.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
38
The meetings project team communication method has a low formality rating.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
39
Gantt charts visually show the time overlap of tasks whereas a network diagram does not show time overlap but does show which tasks could be done in parallel.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
40
Gantt charts do not show how tasks must be ordered.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
41
Which of the following is NOT a True statement regarding project planning?

A) Project planning often requires that you make numerous assumptions about resource availability and potential problems.
B) Project planning is the second phase of the project management process.
C) Project planning focuses on defining clear, discrete activities and the work needed to complete each activity within a single project.
D) The repetitive nature of the project management process requires that plans be constantly monitored throughout the project and periodically updated.
E) Monitoring project progress against the baseline project plan is the first project planning activity.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
42
Skills that include interpreting system requests and specifications, site preparation and user training, and contact point for customers best represent:

A) leadership.
B) management.
C) customer relations.
D) conflict management.
E) team management.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
43
An individual with a diverse set of skills-management, leadership, technical, conflict management, and customer relationship-who is responsible for initiating, planning, executing, and closing down a project best defines:

A) chief information officer.
B) consultant.
C) project scheduler.
D) project manager.
E) end user.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
44
The phase of the project management process in which activities are performed to assess the size, scope, and complexity of the project and to establish procedures to support later project activities best defines:

A) project initiation.
B) scope development.
C) project planning.
D) project assessment.
E) project design.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
45
Skills that include defining and sequencing activities, communicating expectations, assigning resources to activities, and monitoring outcomes best represent:

A) customer relations.
B) leadership.
C) team management.
D) management.
E) technical problem solving.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
46
Which of the following is NOT a task characteristic?

A) A task should have well-accepted predecessor and successor steps.
B) A task should have a single and identifiable deliverable.
C) A task should have a known method or technique.
D) A task should be completed by only one person.
E) A task is measurable so that percent completed can be determined.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
47
Defining the necessary activities required to organize the initiation team while they are working to define the scope of the project is the focus of which of the following activities?

A) Establishing the project initiation team
B) Establishing management procedures
C) Establishing the project management environment and project workbook
D) Dividing the project into manageable tasks
E) Establishing the project initiation plan
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
48
An online or hard-copy repository for all project correspondence, inputs, outputs, deliverables, procedures, and standards that is used for performing project audits, orientation of new team members, communicating with management and customers, identifying future projects, and performing post project reviews is called:

A) a project workbook.
B) a schedule book.
C) a project planner.
D) project management software.
E) an electronic calendar.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
49
Identifying, assessing, and managing the risks and day-to-day changes that occur during a project best defines which of the following project manager activities?

A) Conflict management
B) Risk and change management
C) Team management
D) Customer relations
E) Technical problem solving
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
50
Arguably, the most instrumental person to the successful completion of any project is the:

A) chief information officer.
B) project manager.
C) end user.
D) staff consultant.
E) department manager.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
51
Which of the following is a True statement regarding project time estimates?

A) Project time estimates for task completion and overall system quality are significantly influenced by the assignment of people to tasks.
B) Resource estimates should not be revised based upon the skills of the actual person assigned to a particular activity.
C) Staff learning can be enhanced by assigning individuals to tasks which are "over their heads."
D) Project time estimates are always on target.
E) Hardware and software are the most important, and expensive, part of project resource planning.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
52
Which of the following is NOT a project management phase?

A) Closing down the project
B) Planning the project
C) Executing the project
D) Initiating a project
E) Implementing the project
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
53
Managing conflict within a project team to ensure that conflict is not too high or too low best defines which of the following project manager activities?

A) Conflict management
B) Leadership
C) Team management
D) Problem solving
E) Risk management
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
54
Influencing the activities of others toward the attainment of a common goal through the use of intelligence, personality, and abilities refers to which of the following project manager activities?

A) Conflict management
B) Management
C) Leadership
D) Team management
E) Customer relations
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
55
A controlled process of initiating, planning, executing, and closing down a project best defines:

A) systems development.
B) project management.
C) project development.
D) systems management.
E) systems development technique.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
56
The process of dividing the project into manageable tasks and logically ordering them to ensure a smooth evolution between tasks defines:

A) task division.
B) work breakdown structure.
C) work structuring.
D) project division.
E) critical path scheduling.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
57
During which of the following project planning activities do you use the information regarding tasks and resource availability to assign time estimates to each activity in the work breakdown structure?

A) Dividing the project into manageable tasks
B) Describing project scope, alternatives, and feasibility
C) Setting a baseline project plan
D) Developing a preliminary schedule
E) Developing a project scope statement
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
58
Which of the following project management activities is associated with project initiation?

A) Estimating resources and creating a detailed resource plan
B) Describing project scope, alternatives, and feasibility
C) Establishing a relationship with the customer
D) Identifying and assessing risks
E) Closing down the project
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
59
Developing an understanding of the content and complexity of the project is the purpose of:

A) developing a project charter activity of the project planning phase.
B) setting a baseline project plan activity of the project planning phase.
C) determining project standards and procedures activity of the project planning phase.
D) describing the project scope, alternatives, and feasibility activity of the project planning phase.
E) closing down the project activity of the project planning phase.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
60
Which of the following is NOT a project planning activity?

A) Setting a baseline project plan
B) Identifying and assessing risk
C) Determining project standards and procedures
D) Establishing management procedures
E) Developing a project charter
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
61
What would be the estimated time for completion if the time estimates for report design are as follows? optimistic = 3 weeks; pessimistic = 9 weeks; realistic = 6 weeks

A) 3 weeks
B) 5 weeks
C) 36 weeks
D) 6 weeks
E) 18 weeks
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
62
Which of the following states correctly the formality and use of hallway discussions?

A) In terms of formality, hallway discussions would be rated medium. In terms of use, hallway discussions would be used to inform.
B) In terms of formality, hallway discussions would be rated high. In terms of use, hallway discussions would be used to inform.
C) In terms of formality, hallway discussions would be rated low. In terms of use, hallway discussions would be used to inform and resolve issues.
D) In terms of formality, hallway discussions would be rated high. In terms of use, hallway discussions would serve as a permanent record.
E) In terms of formality, hallway discussions would be rated medium to high. In terms of use, hallway discussions would be used to resolve issues.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
63
The third phase of the project management process in which the plans created in the prior phases are put into action is:

A) project planning.
B) project development.
C) project initiation.
D) project execution.
E) project close down.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
64
Changes to the baseline project plan might be motivated by:

A) a slipped completion date of an activity.
B) a bungled activity that must be redone.
C) the identification of a new activity that becomes evident later in the project.
D) an unforeseen change in personnel due to sickness, resignation, or termination.
E) all of the above.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
65
Ensuring that all contractual terms of the project have been met is done during:

A) conducting postproject reviews.
B) closing the customer contract.
C) setting a baseline project plan.
D) communicating the project status.
E) project implementation.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
66
The responsibility for keeping all team members informed of the project status best describes:

A) monitoring project progress against the baseline project plan.
B) executing the baseline plan.
C) communicating the project status.
D) updating project status.
E) establishing the project initiation plan.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
67
A critical path refers to:

A) a sequence of task activities whose order and durations indirectly affect the completion date of a project.
B) a sequence of task activities whose order and durations directly affect the completion date of a project.
C) a sequence of task activities whose order must be performed in parallel.
D) a sequence of task activities whose duration cannot last more than 40 percent of the time allotted to the project.
E) none of the above.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
68
Realistic time refers to:

A) the maximum period of time for an activity to be completed.
B) the minimum period of time for an activity to be completed.
C) the planner's "best guess" of the amount of time the activity actually will require for completion.
D) the maximum period of time for an entire project to be completed.
E) the average period of time for an activity to be completed.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
69
What would be the estimated time for completion if time estimates for programming are as follows? optimistic = 4 weeks; pessimistic = 6 weeks; realistic = 5 weeks

A) 5 weeks
B) 6 weeks
C) 15 weeks
D) 3 weeks
E) 30 weeks
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
70
Which of the following occurs during project execution?

A) Monitoring project progress against the baseline project plan
B) Conducting post project reviews
C) Establishing the project initiation plan
D) Establishing the project workbook
E) Establishing the communication plan
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
71
Pessimistic time refers to:

A) the maximum period of time for an activity to be completed.
B) the minimum period of time for an activity to be completed.
C) the planner's "best guess" of the amount of time the activity actually will require for completion.
D) the maximum period of time for an entire project to be completed.
E) the average period of time for an activity to be completed.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
72
Which of the following states correctly the formality and use of a project workbook?

A) In terms of formality, the project workbook would be rated low to medium. In terms of use, the project workbook would be used to inform and serve as a permanent record.
B) In terms of formality, the project workbook would be rated high. In terms of use, the project workbook would be used to resolve issues.
C) In terms of formality, the project workbook would be rated high. In terms of use, the project workbook would be used to inform and serve as a permanent record.
D) In terms of formality, the project workbook would be rated low. In terms of use, the project workbook would be used to resolve issues.
E) In terms of formality, the project workbook would be rated medium to high. In terms of use, the project workbook would be used to resolve issues.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
73
Determining the strengths and weaknesses of project deliverables, the processes used to create them, and the project management process is done during:

A) conducting postproject reviews.
B) closing down the project.
C) establishing the communication plan.
D) communicating the project status.
E) closing the customer contract.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
74
Optimistic time refers to:

A) the maximum period of time for an activity to be completed.
B) the minimum period of time for an activity to be completed.
C) the planner's "best guess" of the amount of time the activity actually will require for completion.
D) the maximum period of time for an entire project to be completed.
E) the average period of time for an activity to be completed.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
75
Indicating when and how written and oral reports will be provided by the team, how team members will coordinate work, what messages will be sent to announce the project to interested parties, and what kinds of information will be shared with vendors and external contractors involved with the project describes:

A) determining project standards and procedures.
B) developing a project scope statement.
C) developing a communication plan.
D) setting a baseline project plan.
E) establishing the project initiation team.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
76
Any person, group of people, piece of equipment, or material used in accomplishing an activity is referred to as a(n):

A) entity.
B) agent.
C) resource.
D) identifier.
E) expense.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
77
The final phase of the project management process that focuses on bringing a project to an end is called:

A) project evaluation.
B) project closedown.
C) project initiation and planning.
D) project review.
E) project implementation.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
78
Risks can arise from:

A) the use of new technology.
B) resistance to change.
C) availability of critical resources.
D) member inexperience with technology or the business area.
E) all of the above.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
79
A scheduling technique where the order and duration of the sequence of activities directly affect the completion date of a project refers to:

A) sequencing strategy.
B) Gantt scheduling.
C) critical path scheduling.
D) activity scheduling.
E) task management.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
80
A technique that uses optimistic, pessimistic, and realistic time to calculate the expected time for a particular task best defines:

A) Gantt.
B) Computer Aided Software Engineering (CASE).
C) Program Evaluation Review Technique (PERT).
D) flowcharting.
E) Unified Modeling Language (UML).
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 94 flashcards in this deck.