Deck 13: Managing Production Across the Supply Chain

Full screen (f)
exit full mode
Question
Throughout every MRP record,ending inventory is equal to the ending inventory from the previous period,plus the master production schedule quantity,minus the orders booked for that period.
Use Space or
up arrow
down arrow
to flip the card.
Question
A unit that is not been sold or otherwise committed to any other customer should be considered available to promise.
Question
From a revenue standpoint,a producer would rather have higher forecasted demand than booked orders.
Question
Available to promise inventory is always zero for the first week in the master schedule record.
Question
Material requirements planning is used to manage independent demand inventory.
Question
Consider the product structure tree shown below: Consider the product structure tree shown below:   Company B has no inventory at any level.They will need 145 Es to make 12 units of end item X.<div style=padding-top: 35px>
Company B has no inventory at any level.They will need 145 Es to make 12 units of end item X.
Question
MRP nervousness refers to the notion that a small change at the top of a bill of material can have drastic effects on items farther down the bill of material.
Question
If a job has a negative critical ratio then it must be early.
Question
MRP uses backward scheduling.
Question
Distribution requirements planning is identical to material requirements planning except instead of gross requirements,a DRP record shows forecasted demand.
Question
Since the booked orders figure represents actual customer demand in a master schedule,that value is always less than or equal to forecasted demand.
Question
Component J is ordered on February 1,is received,and is ready to use on February 8.Its planning lead time is seven days.
Question
Distribution requirements planning is used to synchronize supply chain partners at the production activity control level.
Question
The longer the production and supplier lead times,the longer the MRP record's planning horizon needs to be.
Question
In a bill of material,a parent may have many children but a child may have only one parent.
Question
Gross requirements in an MRP record can be met by inventory from previous weeks,scheduled receipts,or planned receipts.
Question
Which of the following statements regarding master production scheduling calculations is BEST?

A)Forecasted demand always exceeds booked orders.
B)Booked orders always exceed forecasted demand.
C)If booked orders are greater than forecasted orders,there must be a master production schedule for that period.
D)If ending inventory is greater than or equal to zero,there is no master production schedule quantity for that period.
Question
RFID tags can be used instead of a bar code system to trace the movement and location of materials.
Question
Which step comes first in sales and operations planning?

A)master scheduling
B)material requirements planning
C)production activity control
D)vendor order management
Question
Material requirements planning is performed over a shorter time frame and greater level of detail than master scheduling.
Question
The planning technique that uses the master production schedule to monitor key resource requirements is:

A)rough-cut capacity planning.
B)horizon planning.
C)resource planning.
D)handfield planning.
Question
A time-phased planning approach that uses planned orders at the point of demand to determine forecasted demand at the source level is:

A)RFID.
B)EDD.
C)DRP.
D)MRP.
Question
Forecasts in a company using a distribution requirements planning system are typically based on:

A)historical data from upstream supply partners.
B)historical data from downstream supply partners.
C)upstream supply partners' requirements.
D)downstream supply partners' requirements.
Question
MRP is NOT capable of:

A)lowering inventory levels.
B)helping a firm meet their master schedule commitments.
C)telling a firm's suppliers what needs to be made and by when.
D)sequencing jobs at a machining center.
Question
Calculate the average lateness using the earliest due date criterion to determine the schedule for these five jobs. <strong>Calculate the average lateness using the earliest due date criterion to determine the schedule for these five jobs.  </strong> A)3 B)10 C)12.4 D)14 <div style=padding-top: 35px>

A)3
B)10
C)12.4
D)14
Question
Using this MRP record and a lead time of 3 weeks,what should the planned orders be in week 1? <strong>Using this MRP record and a lead time of 3 weeks,what should the planned orders be in week 1?  </strong> A)200 B)300 C)400 D)500 <div style=padding-top: 35px>

A)200
B)300
C)400
D)500
Question
There are 200 units in inventory at the start of week 1.What are the net requirements in week 4 if there is a scheduled receipt of 100 units every other week and a two week production lead time? <strong>There are 200 units in inventory at the start of week 1.What are the net requirements in week 4 if there is a scheduled receipt of 100 units every other week and a two week production lead time?  </strong> A)250 B)300 C)350 D)400 <div style=padding-top: 35px>

A)250
B)300
C)350
D)400
Question
Given the forecast and booked orders shown in the table,and a beginning inventory of 25,what is the master production schedule quantity for period 4? <strong>Given the forecast and booked orders shown in the table,and a beginning inventory of 25,what is the master production schedule quantity for period 4?  </strong> A)35 B)40 C)55 D)70 <div style=padding-top: 35px>

A)35
B)40
C)55
D)70
Question
________ translates the master schedule for final products into detailed requirements.
Question
Confirmed demand for products is called ________ in master scheduling.
Question
Consider the product structure tree shown below: <strong>Consider the product structure tree shown below:   With a beginning inventory of zero for all components and finished items,how many assembly As are needed to produce 25 product Xs?</strong> A)125 B)250 C)325 D)400 <div style=padding-top: 35px>
With a beginning inventory of zero for all components and finished items,how many assembly As are needed to produce 25 product Xs?

A)125
B)250
C)325
D)400
Question
With an inventory as shown in the table,how many assembly Es should be produced or purchased to produce 15 product Xs? <strong>With an inventory as shown in the table,how many assembly Es should be produced or purchased to produce 15 product Xs?  </strong> A)91 B)147 C)193 D)225 <div style=padding-top: 35px>

A)91
B)147
C)193
D)225
Question
An MRP system cannot answer the question:

A)"how much?"
B)"when?"
C)"what?"
D)"why?"
Question
Using the information in the table,determine a schedule for these five jobs using the critical ratio sequence. <strong>Using the information in the table,determine a schedule for these five jobs using the critical ratio sequence.  </strong> A)C-D-B-E-A B)A-C-E-B-D C)C-A-E-B-D D)A-D-B-E-C <div style=padding-top: 35px>

A)C-D-B-E-A
B)A-C-E-B-D
C)C-A-E-B-D
D)A-D-B-E-C
Question
Given the forecast and booked orders shown in the table,and a beginning inventory of 0,what is the available to promise inventory for the period 3? There are no LOT quantity constraints. <strong>Given the forecast and booked orders shown in the table,and a beginning inventory of 0,what is the available to promise inventory for the period 3? There are no LOT quantity constraints.  </strong> A)0 B)12 C)24 D)36 <div style=padding-top: 35px>

A)0
B)12
C)24
D)36
Question
Consider the product structure tree shown below: <strong>Consider the product structure tree shown below:   With a beginning inventory of zero for all components and finished items,how many assembly Es are needed to produce 20 product Xs?</strong> A)180 B)220 C)260 D)300 <div style=padding-top: 35px>
With a beginning inventory of zero for all components and finished items,how many assembly Es are needed to produce 20 product Xs?

A)180
B)220
C)260
D)300
Question
Which of these actions would tend to make an MRP system less nervous?

A)using the same component,such as a fastener,at multiple levels throughout the product structure tree
B)eliminating lot size requirements wherever possible
C)increasing the number of levels in a product structure tree
D)increasing the minimum order quantities only at the highest level of a bill or materials
Question
If a manufacturer had no inventory of any kind but had orders for 10 finished units of their sole product,their buyer would know what parts to order if they were supplied with a:

A)backward schedule.
B)bill of material.
C)rough-cut capacity plan.
D)planning horizon order sheet.
Question
Given the forecast and booked orders shown in the table,and a beginning inventory of 20,what is the available to promise inventory for the first period? There are no LOT quantity constraints. <strong>Given the forecast and booked orders shown in the table,and a beginning inventory of 20,what is the available to promise inventory for the first period? There are no LOT quantity constraints.  </strong> A)0 B)10 C)20 D)40 <div style=padding-top: 35px>

A)0
B)10
C)20
D)40
Question
There is no beginning inventory.What are the net requirements in week 4 if there is a scheduled receipt of 100 units each week and a two week production lead time? <strong>There is no beginning inventory.What are the net requirements in week 4 if there is a scheduled receipt of 100 units each week and a two week production lead time?  </strong> A)250 B)300 C)350 D)400 <div style=padding-top: 35px>

A)250
B)300
C)350
D)400
Question
What are three advantages of using an MRP system?
Question
Consider the product structure tree shown below: Consider the product structure tree shown below:   Assume that the company using this product structure tree has 5 items each at the 0 level,10 items each at the 1 level and 20 items each at the 2 level.How many units of A,B,and E will the company need to acquire in order to ship an order of 20 X's?<div style=padding-top: 35px>
Assume that the company using this product structure tree has 5 items each at the 0 level,10 items each at the 1 level and 20 items each at the 2 level.How many units of A,B,and E will the company need to acquire in order to ship an order of 20 X's?
Question
The estimated level of an end item at the end of each planning period,whether the period is a week or a month is the ________.
Question
The table shows a master schedule for end item Z that is produced according to the product structure tree shown below.Beginning inventories and lead times for components of Z are given in the table.The lot sizes for A,B,and C are 100 units.Complete a materials requirement plan for components A,B,and C.
The table shows a master schedule for end item Z that is produced according to the product structure tree shown below.Beginning inventories and lead times for components of Z are given in the table.The lot sizes for A,B,and C are 100 units.Complete a materials requirement plan for components A,B,and C.      <div style=padding-top: 35px> The table shows a master schedule for end item Z that is produced according to the product structure tree shown below.Beginning inventories and lead times for components of Z are given in the table.The lot sizes for A,B,and C are 100 units.Complete a materials requirement plan for components A,B,and C.      <div style=padding-top: 35px> The table shows a master schedule for end item Z that is produced according to the product structure tree shown below.Beginning inventories and lead times for components of Z are given in the table.The lot sizes for A,B,and C are 100 units.Complete a materials requirement plan for components A,B,and C.      <div style=padding-top: 35px>
Question
In material requirements planning,units already on order are referred to as ________ receipts and new orders are termed ________ receipts.
Question
Describe the scope,inputs,and outputs of sales and operations planning,master scheduling,and MRP.
Question
The process of ________ occurs when a planner works backwards from the master production schedule and the product structure tree to determine when all parts and subassemblies must be ordered and assembled in order to meet MPS due dates.
Question
The longer the production and supplier lead times,the ________ the MRP record's ________ should be.
Question
Cow Company used the master schedule to determine how many workers and the number of machine hours would be needed for each production period.This approach is known as ________.
Question
There are six jobs that are awaiting processing at a machining center.The jobs are shown in the table with their processing time and scheduled completion time.Schedule the jobs by earliest due date,shortest processing time and the critical ratio rule and calculate average lateness for all the jobs.Which scheduling technique performs BEST?
There are six jobs that are awaiting processing at a machining center.The jobs are shown in the table with their processing time and scheduled completion time.Schedule the jobs by earliest due date,shortest processing time and the critical ratio rule and calculate average lateness for all the jobs.Which scheduling technique performs BEST?  <div style=padding-top: 35px>
Question
Explain in layman's terms all of the information that is provided by a master schedule.
Question
A(n)________ is a record or graphical rendering that shows how all the subassemblies,intermediates,parts and raw materials are put together to make the Level 0 item.
Question
A manufacturing concern enters the new year with a forecast and customer orders as shown in the table.They have a beginning inventory of 25 units and a batch size of 25 units (all MPS quantities must be in multiples of 25).Complete the rest of the master production schedule by filling in the projected ending inventory,master production schedule quantity,and available to promise rows
A manufacturing concern enters the new year with a forecast and customer orders as shown in the table.They have a beginning inventory of 25 units and a batch size of 25 units (all MPS quantities must be in multiples of 25).Complete the rest of the master production schedule by filling in the projected ending inventory,master production schedule quantity,and available to promise rows  <div style=padding-top: 35px>
Question
________ is a tool that can be used to synchronize supply chain partners at the master production schedule level.
Question
What organizational disciplines are required in order for an organization to successfully run a material requirements planning system?
Question
For a given job,the amount of processing time remaining divided by the amount of time until the job is due is its ________.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/56
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 13: Managing Production Across the Supply Chain
1
Throughout every MRP record,ending inventory is equal to the ending inventory from the previous period,plus the master production schedule quantity,minus the orders booked for that period.
False
2
A unit that is not been sold or otherwise committed to any other customer should be considered available to promise.
True
3
From a revenue standpoint,a producer would rather have higher forecasted demand than booked orders.
False
4
Available to promise inventory is always zero for the first week in the master schedule record.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
5
Material requirements planning is used to manage independent demand inventory.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
6
Consider the product structure tree shown below: Consider the product structure tree shown below:   Company B has no inventory at any level.They will need 145 Es to make 12 units of end item X.
Company B has no inventory at any level.They will need 145 Es to make 12 units of end item X.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
7
MRP nervousness refers to the notion that a small change at the top of a bill of material can have drastic effects on items farther down the bill of material.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
8
If a job has a negative critical ratio then it must be early.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
9
MRP uses backward scheduling.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
10
Distribution requirements planning is identical to material requirements planning except instead of gross requirements,a DRP record shows forecasted demand.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
11
Since the booked orders figure represents actual customer demand in a master schedule,that value is always less than or equal to forecasted demand.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
12
Component J is ordered on February 1,is received,and is ready to use on February 8.Its planning lead time is seven days.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
13
Distribution requirements planning is used to synchronize supply chain partners at the production activity control level.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
14
The longer the production and supplier lead times,the longer the MRP record's planning horizon needs to be.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
15
In a bill of material,a parent may have many children but a child may have only one parent.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
16
Gross requirements in an MRP record can be met by inventory from previous weeks,scheduled receipts,or planned receipts.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
17
Which of the following statements regarding master production scheduling calculations is BEST?

A)Forecasted demand always exceeds booked orders.
B)Booked orders always exceed forecasted demand.
C)If booked orders are greater than forecasted orders,there must be a master production schedule for that period.
D)If ending inventory is greater than or equal to zero,there is no master production schedule quantity for that period.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
18
RFID tags can be used instead of a bar code system to trace the movement and location of materials.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
19
Which step comes first in sales and operations planning?

A)master scheduling
B)material requirements planning
C)production activity control
D)vendor order management
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
20
Material requirements planning is performed over a shorter time frame and greater level of detail than master scheduling.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
21
The planning technique that uses the master production schedule to monitor key resource requirements is:

A)rough-cut capacity planning.
B)horizon planning.
C)resource planning.
D)handfield planning.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
22
A time-phased planning approach that uses planned orders at the point of demand to determine forecasted demand at the source level is:

A)RFID.
B)EDD.
C)DRP.
D)MRP.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
23
Forecasts in a company using a distribution requirements planning system are typically based on:

A)historical data from upstream supply partners.
B)historical data from downstream supply partners.
C)upstream supply partners' requirements.
D)downstream supply partners' requirements.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
24
MRP is NOT capable of:

A)lowering inventory levels.
B)helping a firm meet their master schedule commitments.
C)telling a firm's suppliers what needs to be made and by when.
D)sequencing jobs at a machining center.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
25
Calculate the average lateness using the earliest due date criterion to determine the schedule for these five jobs. <strong>Calculate the average lateness using the earliest due date criterion to determine the schedule for these five jobs.  </strong> A)3 B)10 C)12.4 D)14

A)3
B)10
C)12.4
D)14
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
26
Using this MRP record and a lead time of 3 weeks,what should the planned orders be in week 1? <strong>Using this MRP record and a lead time of 3 weeks,what should the planned orders be in week 1?  </strong> A)200 B)300 C)400 D)500

A)200
B)300
C)400
D)500
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
27
There are 200 units in inventory at the start of week 1.What are the net requirements in week 4 if there is a scheduled receipt of 100 units every other week and a two week production lead time? <strong>There are 200 units in inventory at the start of week 1.What are the net requirements in week 4 if there is a scheduled receipt of 100 units every other week and a two week production lead time?  </strong> A)250 B)300 C)350 D)400

A)250
B)300
C)350
D)400
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
28
Given the forecast and booked orders shown in the table,and a beginning inventory of 25,what is the master production schedule quantity for period 4? <strong>Given the forecast and booked orders shown in the table,and a beginning inventory of 25,what is the master production schedule quantity for period 4?  </strong> A)35 B)40 C)55 D)70

A)35
B)40
C)55
D)70
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
29
________ translates the master schedule for final products into detailed requirements.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
30
Confirmed demand for products is called ________ in master scheduling.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
31
Consider the product structure tree shown below: <strong>Consider the product structure tree shown below:   With a beginning inventory of zero for all components and finished items,how many assembly As are needed to produce 25 product Xs?</strong> A)125 B)250 C)325 D)400
With a beginning inventory of zero for all components and finished items,how many assembly As are needed to produce 25 product Xs?

A)125
B)250
C)325
D)400
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
32
With an inventory as shown in the table,how many assembly Es should be produced or purchased to produce 15 product Xs? <strong>With an inventory as shown in the table,how many assembly Es should be produced or purchased to produce 15 product Xs?  </strong> A)91 B)147 C)193 D)225

A)91
B)147
C)193
D)225
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
33
An MRP system cannot answer the question:

A)"how much?"
B)"when?"
C)"what?"
D)"why?"
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
34
Using the information in the table,determine a schedule for these five jobs using the critical ratio sequence. <strong>Using the information in the table,determine a schedule for these five jobs using the critical ratio sequence.  </strong> A)C-D-B-E-A B)A-C-E-B-D C)C-A-E-B-D D)A-D-B-E-C

A)C-D-B-E-A
B)A-C-E-B-D
C)C-A-E-B-D
D)A-D-B-E-C
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
35
Given the forecast and booked orders shown in the table,and a beginning inventory of 0,what is the available to promise inventory for the period 3? There are no LOT quantity constraints. <strong>Given the forecast and booked orders shown in the table,and a beginning inventory of 0,what is the available to promise inventory for the period 3? There are no LOT quantity constraints.  </strong> A)0 B)12 C)24 D)36

A)0
B)12
C)24
D)36
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
36
Consider the product structure tree shown below: <strong>Consider the product structure tree shown below:   With a beginning inventory of zero for all components and finished items,how many assembly Es are needed to produce 20 product Xs?</strong> A)180 B)220 C)260 D)300
With a beginning inventory of zero for all components and finished items,how many assembly Es are needed to produce 20 product Xs?

A)180
B)220
C)260
D)300
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
37
Which of these actions would tend to make an MRP system less nervous?

A)using the same component,such as a fastener,at multiple levels throughout the product structure tree
B)eliminating lot size requirements wherever possible
C)increasing the number of levels in a product structure tree
D)increasing the minimum order quantities only at the highest level of a bill or materials
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
38
If a manufacturer had no inventory of any kind but had orders for 10 finished units of their sole product,their buyer would know what parts to order if they were supplied with a:

A)backward schedule.
B)bill of material.
C)rough-cut capacity plan.
D)planning horizon order sheet.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
39
Given the forecast and booked orders shown in the table,and a beginning inventory of 20,what is the available to promise inventory for the first period? There are no LOT quantity constraints. <strong>Given the forecast and booked orders shown in the table,and a beginning inventory of 20,what is the available to promise inventory for the first period? There are no LOT quantity constraints.  </strong> A)0 B)10 C)20 D)40

A)0
B)10
C)20
D)40
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
40
There is no beginning inventory.What are the net requirements in week 4 if there is a scheduled receipt of 100 units each week and a two week production lead time? <strong>There is no beginning inventory.What are the net requirements in week 4 if there is a scheduled receipt of 100 units each week and a two week production lead time?  </strong> A)250 B)300 C)350 D)400

A)250
B)300
C)350
D)400
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
41
What are three advantages of using an MRP system?
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
42
Consider the product structure tree shown below: Consider the product structure tree shown below:   Assume that the company using this product structure tree has 5 items each at the 0 level,10 items each at the 1 level and 20 items each at the 2 level.How many units of A,B,and E will the company need to acquire in order to ship an order of 20 X's?
Assume that the company using this product structure tree has 5 items each at the 0 level,10 items each at the 1 level and 20 items each at the 2 level.How many units of A,B,and E will the company need to acquire in order to ship an order of 20 X's?
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
43
The estimated level of an end item at the end of each planning period,whether the period is a week or a month is the ________.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
44
The table shows a master schedule for end item Z that is produced according to the product structure tree shown below.Beginning inventories and lead times for components of Z are given in the table.The lot sizes for A,B,and C are 100 units.Complete a materials requirement plan for components A,B,and C.
The table shows a master schedule for end item Z that is produced according to the product structure tree shown below.Beginning inventories and lead times for components of Z are given in the table.The lot sizes for A,B,and C are 100 units.Complete a materials requirement plan for components A,B,and C.      The table shows a master schedule for end item Z that is produced according to the product structure tree shown below.Beginning inventories and lead times for components of Z are given in the table.The lot sizes for A,B,and C are 100 units.Complete a materials requirement plan for components A,B,and C.      The table shows a master schedule for end item Z that is produced according to the product structure tree shown below.Beginning inventories and lead times for components of Z are given in the table.The lot sizes for A,B,and C are 100 units.Complete a materials requirement plan for components A,B,and C.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
45
In material requirements planning,units already on order are referred to as ________ receipts and new orders are termed ________ receipts.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
46
Describe the scope,inputs,and outputs of sales and operations planning,master scheduling,and MRP.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
47
The process of ________ occurs when a planner works backwards from the master production schedule and the product structure tree to determine when all parts and subassemblies must be ordered and assembled in order to meet MPS due dates.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
48
The longer the production and supplier lead times,the ________ the MRP record's ________ should be.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
49
Cow Company used the master schedule to determine how many workers and the number of machine hours would be needed for each production period.This approach is known as ________.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
50
There are six jobs that are awaiting processing at a machining center.The jobs are shown in the table with their processing time and scheduled completion time.Schedule the jobs by earliest due date,shortest processing time and the critical ratio rule and calculate average lateness for all the jobs.Which scheduling technique performs BEST?
There are six jobs that are awaiting processing at a machining center.The jobs are shown in the table with their processing time and scheduled completion time.Schedule the jobs by earliest due date,shortest processing time and the critical ratio rule and calculate average lateness for all the jobs.Which scheduling technique performs BEST?
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
51
Explain in layman's terms all of the information that is provided by a master schedule.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
52
A(n)________ is a record or graphical rendering that shows how all the subassemblies,intermediates,parts and raw materials are put together to make the Level 0 item.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
53
A manufacturing concern enters the new year with a forecast and customer orders as shown in the table.They have a beginning inventory of 25 units and a batch size of 25 units (all MPS quantities must be in multiples of 25).Complete the rest of the master production schedule by filling in the projected ending inventory,master production schedule quantity,and available to promise rows
A manufacturing concern enters the new year with a forecast and customer orders as shown in the table.They have a beginning inventory of 25 units and a batch size of 25 units (all MPS quantities must be in multiples of 25).Complete the rest of the master production schedule by filling in the projected ending inventory,master production schedule quantity,and available to promise rows
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
54
________ is a tool that can be used to synchronize supply chain partners at the master production schedule level.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
55
What organizational disciplines are required in order for an organization to successfully run a material requirements planning system?
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
56
For a given job,the amount of processing time remaining divided by the amount of time until the job is due is its ________.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 56 flashcards in this deck.