Question
The risk management plan defines how risks associated with the project will be identified,analyzed,and managed.
Use Space or
up arrow
down arrow
to flip the card.
Question
The quality improvement plan includes any improvement methods that were learned from past projects.
Question
The communications management plan defines the communications requirements for a project throughout its lifespan.
Question
The requirements management plan identifies risks posed by all requirements including new technology and new process risks.
Question
The staffing management plan defines the project team,the roles and responsibilities of the team,tools for team development,and the approaches for managing team performance and group dynamics.
Question
Proper planning can guarantee project success.
Question
The WBS is created by decomposing a project into smaller pieces of manageable work.
Question
The purpose of the process improvement plan is to provide guidance on how to develop,manage,and control the schedule over the project's lifespan.
Question
A functional requirement is a detailed description of technology suitable for the actual design,development,and production processes of a project.
Question
Accomplishing schedules and status reporting is one of several WBS benefits.
Question
A requirement is a condition needed by a user to achieve a project goal.
Question
Planning helps project managers to clarify and focus a project's development and prospects.
Question
According to a study referenced in the textbook,there is a positive correlation between the quality of planning and the success of a project.
Question
The process improvement plan defines the acceptable level of quality in a project in accordance with the requirements of the customers and describes how the project will ensure an acceptable level of quality in its deliverables and processes.
Question
Level 2 of the WBS is used for project authority.
Question
The human resources plan is a document that explains the various human resource requirements of a project.
Question
The scope baseline is the end result of a method that decomposes a project into small manageable activities.
Question
The overall objective of the scope management plan is to document and inform project stakeholders about the project,what tools will be used,and how they will be applied by the project to ensure success.
Question
The configuration management plan documents how the project scope will be defined,managed,controlled,verified,and communicated to stakeholders.
Question
Decisions made at the beginning stage of a project life cycle have less influence than those made at later stages.
Question
X12 standards serve as a common business language allowing all EDI trading partners to communicate electronically with one another.
Question
Documents prepared during the project planning stages include

A)project plans and documents.
B)technical requirements.
C)functional requirements.
D)all of the above.
Question
Target profit is the negotiated profit in a contract assuming the target cost is met.
Question
Documents that are formal,approved documents used to guide both project execution and project control best describe

A)project templates.
B)project plans.
C)resource allocation documents.
D)project structure maps.
Question
Which of the following contains a brief summary and a rationale that help project stakeholders and outsourced contractors understand why the requirement is needed and track the requirement through the progress of the project?

A)technical requirement
B)functional requirement
C)project charter
D)project scope document
Question
A document that specifies a project's requirement in a complete,precise,verifiable manner and includes the procedures for determining whether the requirement is satisfied best defines

A)specifications.
B)request for proposal.
C)request for quotation.
D)project charter.
Question
When using a lifespan-based structure,the highest-level entries in the WBS correspond to the major phases of the lifespan.
Question
In the RACI matrix,the accountable individual (A),is the individual responsible for the activities in a project.
Question
The point of total assumption is the point where the contractor assumes all liability for additional costs once the target price reaches the ceiling price.
Question
Requirements that satisfy the needs of the customers and the end-users best defines

A)mandatory requirements.
B)desirable requirements.
C)customer requirements.
D)designated requirements.
Question
Organizational process assets include each of the following except

A)guidelines.
B)future implementation strategies.
C)prior project documents.
D)knowledge of prior projects.
Question
The sharing ratio is the negotiated fee in a contract assuming the target cost is met.
Question
Any process-related assets that can be used toward a project's success best defines

A)organizational assets.
B)organizational control.
C)environmental asset.
D)project tool.
Question
A detailed description of technology that is suitable for the actual design,development,and production processes of a project best defines

A)technical requirement.
B)functional requirement.
C)project charter.
D)project scope document.
Question
Project documents associated with the scope management knowledge area include

A)project charter.
B)project change requests.
C)duration estimates.
D)requirement traceability matrix.
Question
At a minimum,a milestone will have a duration of at least one day.
Question
Fixed-price contracts are preferred by both clients and contractors when the scope of the project is clear and well defined.
Question
Project documents associated with the integration management knowledge area include

A)project schedule.
B)requirement document.
C)statement of work.
D)activity cost estimates.
Question
Designation is one of the five stages of the procurement cycle.
Question
With cost-plus percentage fee contracts,all the risks are on the contractor.
Question
The cost management plan includes

A)quality improvement methods.
B)quality control methods and expected results.
C)project funding requirements.
D)duration estimates.
Question
A part of the project management plan that is the baseline of the scope of a project and includes the project scope document,WBS,and WBS dictionary best defines

A)network diagram.
B)definitive schedule.
C)WBS.
D)scope baseline.
Question
Which of the following provides guidance on how to develop,manage,and control costs throughout the project lifespan?

A)quality management plan
B)cost management plan
C)process improvement plan
D)staffing management plan
Question
Project documents associated with the time management knowledge area include

A)milestone list.
B)project funding requirements.
C)scope document.
D)project closure reports.
Question
Which of the following documents how the project scope will be defined,managed,controlled,verified and communicated to stakeholders?

A)configuration management plan
B)scope direction report
C)scope statement
D)scope management plan
Question
Outputs of the WBS process include

A)statement of work.
B)a baseline of scope.
C)project closure report.
D)specifications.
Question
Which of the following focuses on establishing and maintaining the consistency of the performance of a system or product?

A)scope management
B)configuration management
C)change management
D)schedule management
Question
A document that determines the basic criteria for developing and maintaining the actual project schedule is the

A)requirements management plan.
B)scope management plan.
C)cost management plan.
D)schedule management plan.
Question
The change management plan includes

A)actual change reports.
B)procedures to evaluate and authorize change requests.
C)any reporting formats.
D)all of the above.
Question
Which of the following refers to a project management process where changes to a project are formally introduced and approved?

A)change management
B)resource management
C)scope management
D)direction management
Question
A requirements management plan includes

A)a description of how scope changes will be identified and classified.
B)procedures to evaluate and authorize change requests.
C)all the features required by customers and users.
D)a description of the audit process.
Question
Which of the following WBS levels describes work packages?

A)Level 1
B)Level 2
C)Level 3
D)Level 4
Question
The scope management plan includes

A)a description of how to break down the WBS into manageable work packages.
B)a representation of stakeholder problems.
C)a requirements document.
D)stakeholder requirements.
Question
The configuration management plan includes

A)the statement of work.
B)a change management process.
C)a description of audit process.
D)a description of how the scope will be planned,executed,and controlled.
Question
Project management plans include

A)project organizational structure.
B)project charter.
C)project closure reports.
D)all of the above.
Question
Which of the following WBS levels is used for project authority?

A)Level 1
B)Level 2
C)Level 3
D)Level 4
Question
The end result of a method that decomposes a project into small manageable activities best defines

A)WBS.
B)QFD.
C)BPR.
D)KAP.
Question
The schedule management plan includes

A)the schedule monitoring and control process.
B)the scope statement of the project.
C)a cost management strategy.
D)quality improvement methods.
Question
Benefits provided by the WBS to the project include

A)schedules and status reporting can be accomplished.
B)objectives can be linked to company resources.
C)costs and budget can be established.
D)all of the above.
Question
Which of the following establishes the requirements,requirement types,requirement attributes,and traceability of a project in order to manage project requirements?

A)requirements definition plan
B)requirements management plan
C)requirements statement
D)requirements proposal
Question
What is a contract? List six types of contracts.
Question
A contract where the contractor agrees to perform the work at a fixed price best defines

A)cost-plus fixed fee contract.
B)fixed-price incentive fee contract.
C)fixed-price contract.
D)cost-plus incentive fee contract.
Question
What are the five stages in a procurement cycle?
Question
Stages in the procurement cycle include each of the following except

A)implementation.
B)transaction.
C)improvement.
D)selection.
Question
When creating a WBS,you should keep in mind that

A)a good understanding of the project is needed.
B)a good scope document must be developed.
C)good requirements documentation with good input from all stakeholders is needed.
D)all of the above are needed.
Question
A formal agreement between two parties,a contractor and a client,wherein the contractor agrees to perform a service and the client is obligated to pay for the service best defines

A)request for quotation.
B)request for proposal.
C)system service request.
D)contract.
Question
Major events occurring during a project that do not have duration best describes

A)deliverables.
B)milestones.
C)sections.
D)resources.
Question
Which of the following summarizes the tasks to be accomplished and delineates who is responsible for the project?

A)scorecard
B)SWOT analysis
C)responsibility matrix
D)configuration management plan
Question
Which of the following provides the descriptions of activities that can be easily understood by the team members who are scheduled to carry out those activities?

A)WBS dictionary
B)WBS scope
C)WBS communication plan
D)WBS resource plan
Question
What is a quality management plan? What might it include?
Question
When selecting contractors or suppliers,information gathering documents include

A)RFIs.
B)RFQs.
C)RFPs.
D)all of the above.
Question
What is the WBS dictionary? What does it contain?
Question
Small project activities possibly with very short durations with definable results best defines

A)primary activities.
B)work packages.
C)secondary activities.
D)Level 1 projects.
Question
List the basic steps to create a delivery-based WBS structure.
Question
Factors that can be used to evaluate scorecards include each of the following except

A)resources.
B)results.
C)value.
D)schedule.
Question
Which of the following WBS levels is used for scheduling?

A)Level 1
B)Level 2
C)Level 3
D)Level 4
Question
The structure of the WBS should consider and reflect

A)project scope.
B)quality and other performance criteria.
C)reporting and other communication methods.
D)all of the above.
Question
Which of the following types of contracts pays the contractor allowable performance costs along with a predetermined percentage based on actual total costs?

A)cost-plus incentive fee contract
B)guaranteed maximum-shared savings contract
C)cost-plus fixed fee contract
D)cost-plus percentage fee contract
Question
The expense that has been agreed upon by a contractor and a client best defines

A)target cost.
B)ceiling price.
C)target fee.
D)target price.
Question
The maximum price the client expects to pay a contractor regardless of cost overruns in a project best defines

A)target price.
B)celling price.
C)maximum price.
D)nonnegotiable price.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/80
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 5: Project Planning
1
The risk management plan defines how risks associated with the project will be identified,analyzed,and managed.
True
2
The quality improvement plan includes any improvement methods that were learned from past projects.
False
3
The communications management plan defines the communications requirements for a project throughout its lifespan.
True
4
The requirements management plan identifies risks posed by all requirements including new technology and new process risks.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
5
The staffing management plan defines the project team,the roles and responsibilities of the team,tools for team development,and the approaches for managing team performance and group dynamics.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
6
Proper planning can guarantee project success.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
7
The WBS is created by decomposing a project into smaller pieces of manageable work.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
8
The purpose of the process improvement plan is to provide guidance on how to develop,manage,and control the schedule over the project's lifespan.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
9
A functional requirement is a detailed description of technology suitable for the actual design,development,and production processes of a project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
10
Accomplishing schedules and status reporting is one of several WBS benefits.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
11
A requirement is a condition needed by a user to achieve a project goal.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
12
Planning helps project managers to clarify and focus a project's development and prospects.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
13
According to a study referenced in the textbook,there is a positive correlation between the quality of planning and the success of a project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
14
The process improvement plan defines the acceptable level of quality in a project in accordance with the requirements of the customers and describes how the project will ensure an acceptable level of quality in its deliverables and processes.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
15
Level 2 of the WBS is used for project authority.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
16
The human resources plan is a document that explains the various human resource requirements of a project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
17
The scope baseline is the end result of a method that decomposes a project into small manageable activities.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
18
The overall objective of the scope management plan is to document and inform project stakeholders about the project,what tools will be used,and how they will be applied by the project to ensure success.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
19
The configuration management plan documents how the project scope will be defined,managed,controlled,verified,and communicated to stakeholders.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
20
Decisions made at the beginning stage of a project life cycle have less influence than those made at later stages.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
21
X12 standards serve as a common business language allowing all EDI trading partners to communicate electronically with one another.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
22
Documents prepared during the project planning stages include

A)project plans and documents.
B)technical requirements.
C)functional requirements.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
23
Target profit is the negotiated profit in a contract assuming the target cost is met.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
24
Documents that are formal,approved documents used to guide both project execution and project control best describe

A)project templates.
B)project plans.
C)resource allocation documents.
D)project structure maps.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following contains a brief summary and a rationale that help project stakeholders and outsourced contractors understand why the requirement is needed and track the requirement through the progress of the project?

A)technical requirement
B)functional requirement
C)project charter
D)project scope document
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
26
A document that specifies a project's requirement in a complete,precise,verifiable manner and includes the procedures for determining whether the requirement is satisfied best defines

A)specifications.
B)request for proposal.
C)request for quotation.
D)project charter.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
27
When using a lifespan-based structure,the highest-level entries in the WBS correspond to the major phases of the lifespan.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
28
In the RACI matrix,the accountable individual (A),is the individual responsible for the activities in a project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
29
The point of total assumption is the point where the contractor assumes all liability for additional costs once the target price reaches the ceiling price.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
30
Requirements that satisfy the needs of the customers and the end-users best defines

A)mandatory requirements.
B)desirable requirements.
C)customer requirements.
D)designated requirements.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
31
Organizational process assets include each of the following except

A)guidelines.
B)future implementation strategies.
C)prior project documents.
D)knowledge of prior projects.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
32
The sharing ratio is the negotiated fee in a contract assuming the target cost is met.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
33
Any process-related assets that can be used toward a project's success best defines

A)organizational assets.
B)organizational control.
C)environmental asset.
D)project tool.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
34
A detailed description of technology that is suitable for the actual design,development,and production processes of a project best defines

A)technical requirement.
B)functional requirement.
C)project charter.
D)project scope document.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
35
Project documents associated with the scope management knowledge area include

A)project charter.
B)project change requests.
C)duration estimates.
D)requirement traceability matrix.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
36
At a minimum,a milestone will have a duration of at least one day.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
37
Fixed-price contracts are preferred by both clients and contractors when the scope of the project is clear and well defined.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
38
Project documents associated with the integration management knowledge area include

A)project schedule.
B)requirement document.
C)statement of work.
D)activity cost estimates.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
39
Designation is one of the five stages of the procurement cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
40
With cost-plus percentage fee contracts,all the risks are on the contractor.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
41
The cost management plan includes

A)quality improvement methods.
B)quality control methods and expected results.
C)project funding requirements.
D)duration estimates.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
42
A part of the project management plan that is the baseline of the scope of a project and includes the project scope document,WBS,and WBS dictionary best defines

A)network diagram.
B)definitive schedule.
C)WBS.
D)scope baseline.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
43
Which of the following provides guidance on how to develop,manage,and control costs throughout the project lifespan?

A)quality management plan
B)cost management plan
C)process improvement plan
D)staffing management plan
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
44
Project documents associated with the time management knowledge area include

A)milestone list.
B)project funding requirements.
C)scope document.
D)project closure reports.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
45
Which of the following documents how the project scope will be defined,managed,controlled,verified and communicated to stakeholders?

A)configuration management plan
B)scope direction report
C)scope statement
D)scope management plan
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
46
Outputs of the WBS process include

A)statement of work.
B)a baseline of scope.
C)project closure report.
D)specifications.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
47
Which of the following focuses on establishing and maintaining the consistency of the performance of a system or product?

A)scope management
B)configuration management
C)change management
D)schedule management
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
48
A document that determines the basic criteria for developing and maintaining the actual project schedule is the

A)requirements management plan.
B)scope management plan.
C)cost management plan.
D)schedule management plan.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
49
The change management plan includes

A)actual change reports.
B)procedures to evaluate and authorize change requests.
C)any reporting formats.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
50
Which of the following refers to a project management process where changes to a project are formally introduced and approved?

A)change management
B)resource management
C)scope management
D)direction management
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
51
A requirements management plan includes

A)a description of how scope changes will be identified and classified.
B)procedures to evaluate and authorize change requests.
C)all the features required by customers and users.
D)a description of the audit process.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
52
Which of the following WBS levels describes work packages?

A)Level 1
B)Level 2
C)Level 3
D)Level 4
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
53
The scope management plan includes

A)a description of how to break down the WBS into manageable work packages.
B)a representation of stakeholder problems.
C)a requirements document.
D)stakeholder requirements.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
54
The configuration management plan includes

A)the statement of work.
B)a change management process.
C)a description of audit process.
D)a description of how the scope will be planned,executed,and controlled.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
55
Project management plans include

A)project organizational structure.
B)project charter.
C)project closure reports.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
56
Which of the following WBS levels is used for project authority?

A)Level 1
B)Level 2
C)Level 3
D)Level 4
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
57
The end result of a method that decomposes a project into small manageable activities best defines

A)WBS.
B)QFD.
C)BPR.
D)KAP.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
58
The schedule management plan includes

A)the schedule monitoring and control process.
B)the scope statement of the project.
C)a cost management strategy.
D)quality improvement methods.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
59
Benefits provided by the WBS to the project include

A)schedules and status reporting can be accomplished.
B)objectives can be linked to company resources.
C)costs and budget can be established.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
60
Which of the following establishes the requirements,requirement types,requirement attributes,and traceability of a project in order to manage project requirements?

A)requirements definition plan
B)requirements management plan
C)requirements statement
D)requirements proposal
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
61
What is a contract? List six types of contracts.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
62
A contract where the contractor agrees to perform the work at a fixed price best defines

A)cost-plus fixed fee contract.
B)fixed-price incentive fee contract.
C)fixed-price contract.
D)cost-plus incentive fee contract.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
63
What are the five stages in a procurement cycle?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
64
Stages in the procurement cycle include each of the following except

A)implementation.
B)transaction.
C)improvement.
D)selection.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
65
When creating a WBS,you should keep in mind that

A)a good understanding of the project is needed.
B)a good scope document must be developed.
C)good requirements documentation with good input from all stakeholders is needed.
D)all of the above are needed.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
66
A formal agreement between two parties,a contractor and a client,wherein the contractor agrees to perform a service and the client is obligated to pay for the service best defines

A)request for quotation.
B)request for proposal.
C)system service request.
D)contract.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
67
Major events occurring during a project that do not have duration best describes

A)deliverables.
B)milestones.
C)sections.
D)resources.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
68
Which of the following summarizes the tasks to be accomplished and delineates who is responsible for the project?

A)scorecard
B)SWOT analysis
C)responsibility matrix
D)configuration management plan
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
69
Which of the following provides the descriptions of activities that can be easily understood by the team members who are scheduled to carry out those activities?

A)WBS dictionary
B)WBS scope
C)WBS communication plan
D)WBS resource plan
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
70
What is a quality management plan? What might it include?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
71
When selecting contractors or suppliers,information gathering documents include

A)RFIs.
B)RFQs.
C)RFPs.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
72
What is the WBS dictionary? What does it contain?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
73
Small project activities possibly with very short durations with definable results best defines

A)primary activities.
B)work packages.
C)secondary activities.
D)Level 1 projects.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
74
List the basic steps to create a delivery-based WBS structure.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
75
Factors that can be used to evaluate scorecards include each of the following except

A)resources.
B)results.
C)value.
D)schedule.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
76
Which of the following WBS levels is used for scheduling?

A)Level 1
B)Level 2
C)Level 3
D)Level 4
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
77
The structure of the WBS should consider and reflect

A)project scope.
B)quality and other performance criteria.
C)reporting and other communication methods.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
78
Which of the following types of contracts pays the contractor allowable performance costs along with a predetermined percentage based on actual total costs?

A)cost-plus incentive fee contract
B)guaranteed maximum-shared savings contract
C)cost-plus fixed fee contract
D)cost-plus percentage fee contract
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
79
The expense that has been agreed upon by a contractor and a client best defines

A)target cost.
B)ceiling price.
C)target fee.
D)target price.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
80
The maximum price the client expects to pay a contractor regardless of cost overruns in a project best defines

A)target price.
B)celling price.
C)maximum price.
D)nonnegotiable price.