Deck 2: The Organizational Context: Strategy, Structure, and Culture

Full screen (f)
exit full mode
Question
Most companies are well suited to allow for successful completion of projects in conjunction with other ongoing corporate activities.
Use Space or
up arrow
down arrow
to flip the card.
Question
The same project managed in the same fashion may succeed in one organization but fail in another.
Question
Which of the following is NOT an element of strategic management?

A)Formulating cross-functional decisions
B)Implementing cross-functional decisions
C)Evaluating cross-functional decisions
D)Eliminating cross-functional decisions
Question
Which of the following statements about clients is BEST?

A)Client refers to the entire customer organization.
B)Clients tend to be concerned with receiving the project as quickly as they can possibly get it.
C)Client groups tend to have similar agendas.
D)A single presentation is best when dealing with all client groups in an organization so that everyone hears exactly the same message.
Question
Strategy,goals,and projects support the organizational mission.
Question
What is strategic management and what role do projects play in it?
Question
Which of the following is descriptive of a vision statement?

A)Inspirational
B)Functional
C)Supportive
D)Critical
Question
The science of formulating,implementing,and evaluating cross-functional decisions that enable an organization to achieve its objectives is BEST described as:

A)Operations management.
B)Strategic management.
C)Project management.
D)Marketing management.
Question
The management department at the university decides to add a new program in restaurant,hotel,and institutional management.As part of the development process they hold focus groups consisting of area business leaders,current and former students,and restaurant and hotel owners.These groups can be described as:

A)Project leaders.
B)Project workers.
C)Stakeholders.
D)Clients.
Question
What is meant by the statement,"successful project management is contextual"?
Question
All of the following are considered as three of the most important contextual issues impacting project management EXCEPT:

A)Culture.
B)Strategy.
C)Organizational structure.
D)Information systems.
Question
Developing a strategy that capitalizes on both internal strengths and external opportunities identified in a TOWS matrix is an example of a:

A)Maxi-maxi strategy.
B)Maxi-mini strategy.
C)Mini-mini strategy.
D)Mini-maxi strategy.
Question
One element of strategic management is cross-functional decision making.
Question
One purpose of a mission statement is to:

A)Establish a sense of what the organization hopes to accomplish.
B)Explain the company's reason for existence.
C)Support the tactical plans of the organization.
D)Explicitly enumerate the projects in the company's portfolio.
Question
External stakeholders that are external to a project but possess the power to effectively disrupt the project's development are:

A)Intervenor groups.
B)Environmental groups.
C)Stressor groups.
D)Special-interest groups.
Question
Which statement about stakeholders is BEST?

A)Stakeholders wield considerable power.
B)Stakeholders can potentially impact project development.
C)Stakeholders are external to a company.
D)By definition,clients are not stakeholders,they are customers.
Question
Developing vision and mission statements is an important tactical step in project management.
Question
A strategic perspective on project management might ask all of the following questions pertaining to organizational setting prior to undertaking a project EXCEPT:

A)What is our corporate culture?
B)Does this project support the company vision?
C)Do we have established reporting relationships?
D)Can we complete the project on time?
Question
The TOWS matrix is used primarily to avoid external opportunities and minimize internal strengths.
Question
Develop a TOWS matrix for a Fortune 100 firm that has announced a new project within the past year.Demonstrate how the new project,which could be any revenue-generating new product or service,fits or doesn't fit the organization based on your TOWS analysis.
Question
The University of Puhonicks hires several professors that specialize in accounting,management,and economics and clusters each into one of three departments.The dean has obviously decided to group employees by:

A)Function.
B)Geography.
C)Project.
D)Product.
Question
Organizational structure identifies the grouping of individuals into:

A)Organizations.
B)Companies.
C)Silos.
D)Departments.
Question
Which of the following is an external stakeholder group?

A)Project team members
B)Top management
C)Internal accountants
D)Environmental groups
Question
Creating action plans to address the needs of various stakeholder groups is part of the ________ step of Block's framework for stakeholder management.

A)define the problem
B)test and refine the solutions
C)develop solutions
D)identify the goals of the principal actors
Question
Which of the following is an internal project stakeholder group?

A)Clients
B)Suppliers
C)Functional managers
D)Competitors
Question
Which statement about organization for project management is BEST?

A)The overall structure of the organization specifies how project team members should communicate with the project manager.
B)The internal project team structure specifies the arrangement of all units or interest groups participating in the development of the project.
C)Two distinct organizational structures operate simultaneously within the project management context: the organizational structure and the project team structure.
D)All of these statements are correct.
Question
Individuals are commonly organized into departments for all of the following reasons EXCEPT:

A)Seniority.
B)Function.
C)Product.
D)Geography.
Question
What are Block's six steps to stakeholder management and what should be accomplished in each step?
Question
An important step in stakeholder management is the assessment of your own capabilities.
Question
The assistant to the manager did not report to the assistant manager,only to the manager.This reporting relationship was clearly delineated in the:

A)Company culture.
B)Organizational structure.
C)Stakeholder analysis.
D)Company mission statement.
Question
Probably the most common type of organizational structure today is:

A)Project.
B)Functional.
C)Matrix.
D)Organic.
Question
The first step in Block's framework of the political process as applied to stakeholder management is to:

A)Assess your own capabilities.
B)Assess the environment.
C)Identify the goals of the principal actors.
D)Define the problem.
Question
Suppliers and competitors are possible intervenor groups in a project.
Question
Span of control refers to:

A)The number of departments involved in a project.
B)The number of days that the project manager is allowed to complete the project.
C)The number of employees one person supervises.
D)The number of levels from top to bottom in an organization.
Question
The group that provides raw materials or resources that the project team needs to complete the project is:

A)Suppliers.
B)Intervenor groups.
C)Top management.
D)Functional managers.
Question
Internal stakeholder analysis looks at a project's customers and determines whether their needs are being met.
Question
Which of the following is NOT an element of organizational structure?

A)Well-articulated mission,vision,and value statements
B)Formal reporting relationships
C)Grouping together of individuals into departments
D)Systems designed to ensure effective communication
Question
Consider your current major and the courses that comprise it.From the perspective of your university,and more specifically,from the department that "owns" this major,identify the stakeholders of this major.List the stakeholders in two categories,internal and external and assess the environment and the goals of each of these stakeholders.
Question
One thing that organizational structure must include is:

A)The design of systems for effective communication.
B)The standards of performance for all employees.
C)The expected outcomes for all projects in the company portfolio.
D)The mission and vision statements.
Question
Define the term stakeholder and discuss the major groups of stakeholders.
Question
The belief that organizations can sometimes gain tremendous benefit from creating a fully dedicated project organization is captured by the term:

A)Heavyweight project organization.
B)Matrix organization.
C)Benevolent society.
D)Leveraged benefits.
Question
The tendency of employees in a functionally organized company to become fixated on their own concerns and work assignments to the exclusion of the needs of other departments is known as:

A)Layering.
B)Myopia.
C)Nepotism.
D)Siloing.
Question
Policies and procedures are examples of an organization's external environment.
Question
A matrix organization for project management has a distinct advantage because:

A)Dual hierarchies mean two bosses.
B)A significant amount of time is spent negotiating the sharing of critical resources.
C)Workers must reconcile competing project and functional demands.
D)Project importance is enhanced by setting authority equal to that of functional departments.
Question
The Larson and Gobeli study that compared projects that had been managed in a variety of structural types revealed that both new product development and construction projects tended to be LEAST effectively executed when the organizational structure was a:

A)Project matrix.
B)Project organization.
C)Balanced matrix.
D)Functional organization.
Question
Companies that are structured by grouping people performing similar activities into departments are:

A)Project organizations.
B)Functional organizations.
C)Matrix organizations.
D)Departmental organizations.
Question
John Drone toils endlessly at Hurts Corporation on his routine assignment and also on a number of project teams.His annual evaluation features input from his line manager and each of the project managers,all of whom have equal say in how his 12-hour work day is partitioned.John Drone is employed by a:

A)Functional organization.
B)Project organization.
C)Cross-functional organization.
D)Matrix organization.
Question
Staffing fluctuations associated with project completion and initiation are most likely to occur in organizations that are:

A)Functionally structured.
B)Project structured.
C)Matrix structured.
D)Process structured.
Question
A major player in the software industry stumbles from one new edition of its operating system and office automation package to another.As soon as one package is released,the programmers and developers have two weeks to latch onto a different team that is updating a different package.Failure to find another team to work for means an end to their employment.This organizational structure is BEST classified as a:

A)Functional organization.
B)Matrix organization
C)Project organization.
D)Flexible organization.
Question
The manager of the Super Burrito Project is in the midst of an important project team meeting but Fred Fromage,the representative from the Cheese department,is nowhere to be found.After a brief investigation it is determined that Fred's manager in the Cheese department has other plans for Fred's time and efforts over the next several days and he simply won't be available for Super Burrito Project work.The organizational structure being used here is unquestionably a:

A)Strong matrix.
B)Weak matrix.
C)Project organization.
D)Chevre organization.
Question
The Larson and Gobeli study that compared projects that had been managed in a variety of structural types revealed that new product development projects tended to be MOST effectively executed when the organizational structure was a:

A)Project matrix.
B)Project organization.
C)Balanced matrix.
D)Functional matrix.
Question
A project structure for an organization is a peach when you consider how well it:

A)Creates legions of project management experts.
B)Maintains a pooled supply of intellectual capital.
C)Assuages the fear of unemployment by project team members once the project has ended.
D)Fosters loyalty to the overall organization by project team members.
Question
A functional organization structure is a weakness for project management because:

A)In-depth knowledge and intellectual capital development are enabled.
B)No disruption or changes to a firm's design are necessitated by projects developed within this structure.
C)Priorities among functional departments may be different and competing.
D)Standard career paths are enabled so team members only perform their duties as needed.
Question
A dual hierarchy is the salient feature of a:

A)Project structure.
B)Matrix structure.
C)Functional structure.
D)Bi-modal structure.
Question
The functional structure is well-suited when:

A)There are low levels of external uncertainty.
B)There is high instability in the environment.
C)Project coordination is assigned to the lowest levels in an organization.
D)There must be rapid response to external opportunities and threats.
Question
The project manager controls most of the project activities and functions,including the assignment and control of project resources in the:

A)Strong matrix.
B)Weak matrix.
C)Dual matrix.
D)Primal matrix.
Question
All major decisions and authority are under the control of the project manager in a:

A)Matrix structure.
B)Functional structure.
C)Project structure.
D)Process structure.
Question
The Larson and Gobeli study that compared projects that had been managed in a variety of structural types revealed that construction projects tended to be MOST effectively executed when the organizational structure was a:

A)Project organization.
B)Balanced matrix.
C)Project matrix.
D)Functional matrix.
Question
In general,the poorest organizational structure when it comes to managing projects is probably the:

A)Matrix structure.
B)Functional structure.
C)Project structure.
D)Process structure.
Question
A major weakness of a matrix organizational structure for project management occurs when:

A)The environment is dynamic.
B)Resources are scarce and shared between functional responsibilities and the competing project.
C)The number of human resource coordination meetings is considered.
D)One considers the dual importance of project management and functional efficiency.
Question
Describe the two forms of a matrix organization and indicate the advantages of each for project management.
Question
A project organization does not have functional departments.
Question
The goal of a matrix structure is to create a simultaneous focus on the need to be quickly responsive to both external opportunities and internal operating efficiencies.
Question
Consider your weekly routine and how it might be managed as a pure project structure.What changes would be required for you to convert from a process mentality to a project mentality?
Question
What is a pure project structure for an organization? What are the advantages of using this structure?
Question
The PMO is used as a tracking and monitoring device under the:

A)Control tower model.
B)Resource pool model.
C)Weather station model.
D)Radar model.
Question
Centralized units within an organization or department that oversee or improve the management of projects are called:

A)Project management offices.
B)PERT units.
C)Tiger teams.
D)Central clearinghouses.
Question
The heavyweight project organization concept is based on the notion that successful project organizations happen by chance or luck,while focusing on functional maintenance and autonomous teams.
Question
What are the advantages and disadvantages of using a functional structure to manage a project?
Question
The greatest advantage of a PMO is that:

A)It is essentially another layer of oversight within the organization.
B)It helps an organization develop project management skills.
C)It serves as a bottleneck for communication across the organization.
D)All project management skills are located at one point in an organization.
Question
A typical PMO could supply a company's project manager with assistance in:

A)Activity scheduling.
B)Establishing organizational structure.
C)Crafting a mission statement.
D)Day-to-day process improvement.
Question
Describe the ways that individuals are grouped within an organization.
Question
The PMO is used to maintain and provide a cadre of skilled and trained project professionals as needed under the:

A)Control tower model.
B)Cadre model.
C)Weather station model.
D)Resource pool model.
Question
What are the three types of organizations presented by the author and how are they different?
Question
The weather station model performs the invaluable function of:

A)Keeping an eye on project status without influencing the project.
B)Establishing standards for managing projects.
C)Enforcing the adherence to accepted protocols for project management.
D)Improving the current state of project management procedures.
Question
What are the elements of organizational structure?
Question
A PMO is NOT used:

A)As a resource center.
B)To act as a central repository for project documentation.
C)To replace the project manager as being responsible for the project.
D)As the place where project management improvements are identified and then disseminated to the rest of the organization.
Question
A project management office requiring compliance with standards and procedures that have been adopted is best described as a ________ form of PMO.

A)Directive
B)Controlling
C)Supportive
D)Authoritative
Question
A typical PMO could supply a company's project manager with assistance in:

A)Composing a project culture document.
B)Establishing organizational structure.
C)Crafting a mission statement.
D)Resource allocation.
Question
The PMO is used to protect and support the skill of project management under the:

A)Resource pool model.
B)Weather station model.
C)Control tower model.
D)Project model.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/105
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 2: The Organizational Context: Strategy, Structure, and Culture
1
Most companies are well suited to allow for successful completion of projects in conjunction with other ongoing corporate activities.
False
2
The same project managed in the same fashion may succeed in one organization but fail in another.
True
3
Which of the following is NOT an element of strategic management?

A)Formulating cross-functional decisions
B)Implementing cross-functional decisions
C)Evaluating cross-functional decisions
D)Eliminating cross-functional decisions
D
4
Which of the following statements about clients is BEST?

A)Client refers to the entire customer organization.
B)Clients tend to be concerned with receiving the project as quickly as they can possibly get it.
C)Client groups tend to have similar agendas.
D)A single presentation is best when dealing with all client groups in an organization so that everyone hears exactly the same message.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
5
Strategy,goals,and projects support the organizational mission.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
6
What is strategic management and what role do projects play in it?
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
7
Which of the following is descriptive of a vision statement?

A)Inspirational
B)Functional
C)Supportive
D)Critical
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
8
The science of formulating,implementing,and evaluating cross-functional decisions that enable an organization to achieve its objectives is BEST described as:

A)Operations management.
B)Strategic management.
C)Project management.
D)Marketing management.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
9
The management department at the university decides to add a new program in restaurant,hotel,and institutional management.As part of the development process they hold focus groups consisting of area business leaders,current and former students,and restaurant and hotel owners.These groups can be described as:

A)Project leaders.
B)Project workers.
C)Stakeholders.
D)Clients.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
10
What is meant by the statement,"successful project management is contextual"?
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
11
All of the following are considered as three of the most important contextual issues impacting project management EXCEPT:

A)Culture.
B)Strategy.
C)Organizational structure.
D)Information systems.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
12
Developing a strategy that capitalizes on both internal strengths and external opportunities identified in a TOWS matrix is an example of a:

A)Maxi-maxi strategy.
B)Maxi-mini strategy.
C)Mini-mini strategy.
D)Mini-maxi strategy.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
13
One element of strategic management is cross-functional decision making.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
14
One purpose of a mission statement is to:

A)Establish a sense of what the organization hopes to accomplish.
B)Explain the company's reason for existence.
C)Support the tactical plans of the organization.
D)Explicitly enumerate the projects in the company's portfolio.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
15
External stakeholders that are external to a project but possess the power to effectively disrupt the project's development are:

A)Intervenor groups.
B)Environmental groups.
C)Stressor groups.
D)Special-interest groups.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
16
Which statement about stakeholders is BEST?

A)Stakeholders wield considerable power.
B)Stakeholders can potentially impact project development.
C)Stakeholders are external to a company.
D)By definition,clients are not stakeholders,they are customers.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
17
Developing vision and mission statements is an important tactical step in project management.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
18
A strategic perspective on project management might ask all of the following questions pertaining to organizational setting prior to undertaking a project EXCEPT:

A)What is our corporate culture?
B)Does this project support the company vision?
C)Do we have established reporting relationships?
D)Can we complete the project on time?
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
19
The TOWS matrix is used primarily to avoid external opportunities and minimize internal strengths.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
20
Develop a TOWS matrix for a Fortune 100 firm that has announced a new project within the past year.Demonstrate how the new project,which could be any revenue-generating new product or service,fits or doesn't fit the organization based on your TOWS analysis.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
21
The University of Puhonicks hires several professors that specialize in accounting,management,and economics and clusters each into one of three departments.The dean has obviously decided to group employees by:

A)Function.
B)Geography.
C)Project.
D)Product.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
22
Organizational structure identifies the grouping of individuals into:

A)Organizations.
B)Companies.
C)Silos.
D)Departments.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
23
Which of the following is an external stakeholder group?

A)Project team members
B)Top management
C)Internal accountants
D)Environmental groups
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
24
Creating action plans to address the needs of various stakeholder groups is part of the ________ step of Block's framework for stakeholder management.

A)define the problem
B)test and refine the solutions
C)develop solutions
D)identify the goals of the principal actors
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following is an internal project stakeholder group?

A)Clients
B)Suppliers
C)Functional managers
D)Competitors
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
26
Which statement about organization for project management is BEST?

A)The overall structure of the organization specifies how project team members should communicate with the project manager.
B)The internal project team structure specifies the arrangement of all units or interest groups participating in the development of the project.
C)Two distinct organizational structures operate simultaneously within the project management context: the organizational structure and the project team structure.
D)All of these statements are correct.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
27
Individuals are commonly organized into departments for all of the following reasons EXCEPT:

A)Seniority.
B)Function.
C)Product.
D)Geography.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
28
What are Block's six steps to stakeholder management and what should be accomplished in each step?
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
29
An important step in stakeholder management is the assessment of your own capabilities.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
30
The assistant to the manager did not report to the assistant manager,only to the manager.This reporting relationship was clearly delineated in the:

A)Company culture.
B)Organizational structure.
C)Stakeholder analysis.
D)Company mission statement.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
31
Probably the most common type of organizational structure today is:

A)Project.
B)Functional.
C)Matrix.
D)Organic.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
32
The first step in Block's framework of the political process as applied to stakeholder management is to:

A)Assess your own capabilities.
B)Assess the environment.
C)Identify the goals of the principal actors.
D)Define the problem.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
33
Suppliers and competitors are possible intervenor groups in a project.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
34
Span of control refers to:

A)The number of departments involved in a project.
B)The number of days that the project manager is allowed to complete the project.
C)The number of employees one person supervises.
D)The number of levels from top to bottom in an organization.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
35
The group that provides raw materials or resources that the project team needs to complete the project is:

A)Suppliers.
B)Intervenor groups.
C)Top management.
D)Functional managers.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
36
Internal stakeholder analysis looks at a project's customers and determines whether their needs are being met.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
37
Which of the following is NOT an element of organizational structure?

A)Well-articulated mission,vision,and value statements
B)Formal reporting relationships
C)Grouping together of individuals into departments
D)Systems designed to ensure effective communication
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
38
Consider your current major and the courses that comprise it.From the perspective of your university,and more specifically,from the department that "owns" this major,identify the stakeholders of this major.List the stakeholders in two categories,internal and external and assess the environment and the goals of each of these stakeholders.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
39
One thing that organizational structure must include is:

A)The design of systems for effective communication.
B)The standards of performance for all employees.
C)The expected outcomes for all projects in the company portfolio.
D)The mission and vision statements.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
40
Define the term stakeholder and discuss the major groups of stakeholders.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
41
The belief that organizations can sometimes gain tremendous benefit from creating a fully dedicated project organization is captured by the term:

A)Heavyweight project organization.
B)Matrix organization.
C)Benevolent society.
D)Leveraged benefits.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
42
The tendency of employees in a functionally organized company to become fixated on their own concerns and work assignments to the exclusion of the needs of other departments is known as:

A)Layering.
B)Myopia.
C)Nepotism.
D)Siloing.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
43
Policies and procedures are examples of an organization's external environment.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
44
A matrix organization for project management has a distinct advantage because:

A)Dual hierarchies mean two bosses.
B)A significant amount of time is spent negotiating the sharing of critical resources.
C)Workers must reconcile competing project and functional demands.
D)Project importance is enhanced by setting authority equal to that of functional departments.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
45
The Larson and Gobeli study that compared projects that had been managed in a variety of structural types revealed that both new product development and construction projects tended to be LEAST effectively executed when the organizational structure was a:

A)Project matrix.
B)Project organization.
C)Balanced matrix.
D)Functional organization.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
46
Companies that are structured by grouping people performing similar activities into departments are:

A)Project organizations.
B)Functional organizations.
C)Matrix organizations.
D)Departmental organizations.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
47
John Drone toils endlessly at Hurts Corporation on his routine assignment and also on a number of project teams.His annual evaluation features input from his line manager and each of the project managers,all of whom have equal say in how his 12-hour work day is partitioned.John Drone is employed by a:

A)Functional organization.
B)Project organization.
C)Cross-functional organization.
D)Matrix organization.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
48
Staffing fluctuations associated with project completion and initiation are most likely to occur in organizations that are:

A)Functionally structured.
B)Project structured.
C)Matrix structured.
D)Process structured.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
49
A major player in the software industry stumbles from one new edition of its operating system and office automation package to another.As soon as one package is released,the programmers and developers have two weeks to latch onto a different team that is updating a different package.Failure to find another team to work for means an end to their employment.This organizational structure is BEST classified as a:

A)Functional organization.
B)Matrix organization
C)Project organization.
D)Flexible organization.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
50
The manager of the Super Burrito Project is in the midst of an important project team meeting but Fred Fromage,the representative from the Cheese department,is nowhere to be found.After a brief investigation it is determined that Fred's manager in the Cheese department has other plans for Fred's time and efforts over the next several days and he simply won't be available for Super Burrito Project work.The organizational structure being used here is unquestionably a:

A)Strong matrix.
B)Weak matrix.
C)Project organization.
D)Chevre organization.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
51
The Larson and Gobeli study that compared projects that had been managed in a variety of structural types revealed that new product development projects tended to be MOST effectively executed when the organizational structure was a:

A)Project matrix.
B)Project organization.
C)Balanced matrix.
D)Functional matrix.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
52
A project structure for an organization is a peach when you consider how well it:

A)Creates legions of project management experts.
B)Maintains a pooled supply of intellectual capital.
C)Assuages the fear of unemployment by project team members once the project has ended.
D)Fosters loyalty to the overall organization by project team members.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
53
A functional organization structure is a weakness for project management because:

A)In-depth knowledge and intellectual capital development are enabled.
B)No disruption or changes to a firm's design are necessitated by projects developed within this structure.
C)Priorities among functional departments may be different and competing.
D)Standard career paths are enabled so team members only perform their duties as needed.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
54
A dual hierarchy is the salient feature of a:

A)Project structure.
B)Matrix structure.
C)Functional structure.
D)Bi-modal structure.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
55
The functional structure is well-suited when:

A)There are low levels of external uncertainty.
B)There is high instability in the environment.
C)Project coordination is assigned to the lowest levels in an organization.
D)There must be rapid response to external opportunities and threats.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
56
The project manager controls most of the project activities and functions,including the assignment and control of project resources in the:

A)Strong matrix.
B)Weak matrix.
C)Dual matrix.
D)Primal matrix.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
57
All major decisions and authority are under the control of the project manager in a:

A)Matrix structure.
B)Functional structure.
C)Project structure.
D)Process structure.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
58
The Larson and Gobeli study that compared projects that had been managed in a variety of structural types revealed that construction projects tended to be MOST effectively executed when the organizational structure was a:

A)Project organization.
B)Balanced matrix.
C)Project matrix.
D)Functional matrix.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
59
In general,the poorest organizational structure when it comes to managing projects is probably the:

A)Matrix structure.
B)Functional structure.
C)Project structure.
D)Process structure.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
60
A major weakness of a matrix organizational structure for project management occurs when:

A)The environment is dynamic.
B)Resources are scarce and shared between functional responsibilities and the competing project.
C)The number of human resource coordination meetings is considered.
D)One considers the dual importance of project management and functional efficiency.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
61
Describe the two forms of a matrix organization and indicate the advantages of each for project management.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
62
A project organization does not have functional departments.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
63
The goal of a matrix structure is to create a simultaneous focus on the need to be quickly responsive to both external opportunities and internal operating efficiencies.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
64
Consider your weekly routine and how it might be managed as a pure project structure.What changes would be required for you to convert from a process mentality to a project mentality?
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
65
What is a pure project structure for an organization? What are the advantages of using this structure?
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
66
The PMO is used as a tracking and monitoring device under the:

A)Control tower model.
B)Resource pool model.
C)Weather station model.
D)Radar model.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
67
Centralized units within an organization or department that oversee or improve the management of projects are called:

A)Project management offices.
B)PERT units.
C)Tiger teams.
D)Central clearinghouses.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
68
The heavyweight project organization concept is based on the notion that successful project organizations happen by chance or luck,while focusing on functional maintenance and autonomous teams.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
69
What are the advantages and disadvantages of using a functional structure to manage a project?
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
70
The greatest advantage of a PMO is that:

A)It is essentially another layer of oversight within the organization.
B)It helps an organization develop project management skills.
C)It serves as a bottleneck for communication across the organization.
D)All project management skills are located at one point in an organization.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
71
A typical PMO could supply a company's project manager with assistance in:

A)Activity scheduling.
B)Establishing organizational structure.
C)Crafting a mission statement.
D)Day-to-day process improvement.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
72
Describe the ways that individuals are grouped within an organization.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
73
The PMO is used to maintain and provide a cadre of skilled and trained project professionals as needed under the:

A)Control tower model.
B)Cadre model.
C)Weather station model.
D)Resource pool model.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
74
What are the three types of organizations presented by the author and how are they different?
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
75
The weather station model performs the invaluable function of:

A)Keeping an eye on project status without influencing the project.
B)Establishing standards for managing projects.
C)Enforcing the adherence to accepted protocols for project management.
D)Improving the current state of project management procedures.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
76
What are the elements of organizational structure?
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
77
A PMO is NOT used:

A)As a resource center.
B)To act as a central repository for project documentation.
C)To replace the project manager as being responsible for the project.
D)As the place where project management improvements are identified and then disseminated to the rest of the organization.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
78
A project management office requiring compliance with standards and procedures that have been adopted is best described as a ________ form of PMO.

A)Directive
B)Controlling
C)Supportive
D)Authoritative
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
79
A typical PMO could supply a company's project manager with assistance in:

A)Composing a project culture document.
B)Establishing organizational structure.
C)Crafting a mission statement.
D)Resource allocation.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
80
The PMO is used to protect and support the skill of project management under the:

A)Resource pool model.
B)Weather station model.
C)Control tower model.
D)Project model.
Unlock Deck
Unlock for access to all 105 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 105 flashcards in this deck.