Deck 11: Managing Project Team

Full screen (f)
exit full mode
Question
Establishing a team identity is facilitated by

A)Team members working in a common space.
B)Creation of a project team name.
C)Effective use of meetings.
D)Team rituals.
E)All of these are facilitators of establishing a team identity.
Use Space or
up arrow
down arrow
to flip the card.
Question
Experience and research indicate that high-performance project teams are much more likely to develop under all the following conditions EXCEPT

A)Members are assigned to the project full time.
B)Members report solely to the project manager.
C)There are 10 or fewer members per team.
D)Team members are selected by their managers.
E)The project involves a compelling objective.
Question
During which stage of team development do close relationships develop and the group demonstrates cohesiveness?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
Question
When recruiting project team members, which of the following factors is NOT something a project manager might consider?

A)The political connections the potential team member may have
B)Their problem-solving ability
C)Their ambition, initiative, and energy
D)Their skillset as it compares to the project manager
E)Their availability
Question
There are two important factors that affect the recruitment of project members.Which of the following is one of those factors?

A)The budget available
B)The size of the project
C)The management structure being used to complete the project
D)The level of innovation and technical expertise needed
E)Organizational culture
Question
Researchers have found that high-performance teams have norms for team interaction.Which of the following is NOT one of those norms?

A)Hard work does not get in the way of having fun.
B)No information is shared outside the team unless all agree to it.
C)It is acceptable to be in trouble, but not to surprise others.
D)When a decision has to be made, everyone should agree before moving forward.
E)There is no tolerance for bulling a way through a problem or issue.
Question
Project managers play a key role in developing high-performance project teams.Which of the following is NOT a contributing factor to this role?

A)Conduct project meetings
B)Recruit team members
C)Manage a reward system
D)Manage conflict
E)Report progress to top management
Question
During which stage of team development do team members establish ground rules and try to find out what behaviors are acceptable and what performance expectations are?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
Question
All of the following have been found to be good for running effective project meetings EXCEPT

A)Start meetings on time regardless of whether everyone is present.
B)Allow a time period for socializing to support the development of a team identity.
C)Thoroughly document all decisions.
D)Prepare and distribute an agenda prior to the meeting.
E)Identify an adjournment time.
Question
Which of the following is commonly associated with high-performing project teams?

A)Risk taking is controlled and not allowed to jeopardize the overall project.
B)Roles and specific responsibilities are well-defined.
C)A degree of competition among team members is encouraged.
D)Mistakes are viewed as opportunities for learning.
E)Team members are selected with similar talents to enhance cohesion.
Question
During which stage of team development is high performance not a top priority and attention is devoted to wrapping up the project?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
Question
During which stage of team development is the team fully functional and accomplishing project goals?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
Question
Tom is managing a project team responsible for building a new office building that started this week.He notices that team members are trying out different behaviors to see what is acceptable to the project and personal relations.Which stage of development is the team in?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
Question
The essential qualities of an effective vision include all of the following EXCEPT

A)All team members have the same vision.
B)The vision should be communicated to all.
C)The vision has to make strategic sense.
D)There should be a passion for the vision.
E)The vision should be a source of inspiration to others.
Question
Roger is new-product project manager for a retail company.Recently the team has exhibited a high degree of conflict over who will control the group and how decisions will be made.Which stage of development is the team in?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
Question
The first project meeting is critical to the early functioning of the project team.Which of the following is NOT true regarding this meeting?

A)An overview of the project's scope and objectives should be addressed.
B)Interpersonal interaction concerns should be addressed.
C)The project manager must model how the team will work together.
D)The meeting will need to be as long as necessary to cover the main objectives of a first meeting.
E)The meeting should be productive, well-organized and realistic.
Question
The essence of positive synergy can be found in the phrase

A)Front of ship sink-back of ship sink.
B)There is no "I" in team.
C)Two heads are better than one.
D)The whole is greater than the sum of the parts.
E)If it doesn't kill you, it makes you stronger.
Question
During which stage of team development do members accept that they are part of a project group but resist the constraints that the project and the group put on their individuality?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
Question
The project manager must quickly establish operational ground rules for how the team will work together.These include planning, tracking, managing change, and relationship decisions.Which of the following is an example of a planning decision?

A)What departments will the team need to interact with during the project?
B)What are the specific roles and responsibilities of all the participants?
C)Who will generate and distribute reports?
D)How will changes be documented and evaluated?
E)How will progress be assessed?
Question
Sam is the coach of a high school soccer team and has noticed that some close relationships have formed as well as feelings of camaraderie and shared responsibilities for the team's success.Which stage of development is the team in?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
Question
When project teams get too used to not having to go through normal approvals to get things done, this is called

A)Going Native.
B)Bureaucratic Bypass Syndrome.
C)Team Infatuation.
D)Groupthink.
Question
When a team is able to use identified individual talents to meet a projects given needs is a common characteristic of

A)Resource Allocation.
B)Scheduling.
C)Synergy.
D)Budgeting.
Question
How can a project manager support and encourage functional conflict?

A)Conflict should not be encouraged or supported
B)By asking tough questions and by challenging the rationale behind recommendations
C)By imposing a solution to the conflict after listening to each party
D)By negotiating a resolution by reasoning and persuasion
E)As soon as emotions flare, he or she can intervene and attempt to control conflict because it has become dysfunctional
Question
The biggest challenge to managing a virtual project team is

A)Getting reports and technical information communicated.
B)Developing trust and establishing effective patterns of communication.
C)Enforcing deadlines.
D)Dealing with team members in different time zones.
E)Being able to contact team members immediately when there is a problem.
Question
During the delivery phase of a project's life cycle, the most significant source of conflict is

A)Schedules.
B)Priorities.
C)Technical.
D)Procedures.
E)Costs.
Question
Strategies to manage dysfunctional conflict do NOT include _____ the conflict.

A)Control
B)Arbitrate
C)Mediate
D)Accept
E)Encourage
Question
When reaching a decision during the group decision-making process, the project manager must build a consensus among the group and can do this by all of the following EXCEPT

A)If time becomes a factor, they must make an informed final decision after everyone's ideas have been heard.
B)Provide periodic summaries to help the group keep track of its progress.
C)Protect those members who represent the minority view.
D)Guarantee that everyone has the opportunity to share opinions.
E)Manage any conflict that may arise.
Question
Challenges to managing geographically distributed team are

A)Developing trust.
B)Keeping time-zones straight.
C)Effective communication.
D)Developing trust and effective communication.
Question
When project managers impose a solution to dysfunctional conflict after listening to each party, they are __________ the conflict.

A)Eliminating
B)Controlling
C)Mediating
D)Arbitrating
E)Encouraging
Question
Individual rewards for outstanding work would NOT include

A)Letters of commendation.
B)Public recognition.
C)Desirable job assignments.
D)Judiciously making exceptions to the rules.
E)All of these are examples of individual rewards for outstanding work.
Question
Which of the following is NOT one of the tips for alleviating communication problems of virtual teams?

A)Insist team members travel at least once during the project for a face-to-face meeting.
B)Keep team members informed on how well the overall project is going.
C)Share the pain when team members reside in different time zones.
D)Establish clear norms and protocols for surfacing assumptions and conflicts.
E)Establish a code of conduct to avoid delays.
Question
When project managers reduce the intensity of the conflict by smoothing over differences or interjecting humor when dysfunctional conflict arises, they are attempting to _________ the conflict.

A)Eliminate
B)Control
C)Mediate
D)Arbitrate
E)Encourage
Question
While some conflict can be beneficial, the absence of conflict can mask

A)Project mistakes.
B)Lowered customer expectations.
C)Useful information.
D)All of these choices are correct.
Question
When dysfunctional conflict is identified, one of the ways to deal with it is to

A)Impose an arbitrated solution.
B)Show understanding and support.
C)Escalate it up the management chain.
D)Encourage the conflict.
Question
High performing teams can

A)Create breakthrough products.
B)Exceed customer expectations.
C)Complete projects ahead of schedule and under budget.
D)All of these choices are correct.
Question
Which of the following would be an appropriate situation to require facilitating group decision making?

A)A mechanical engineer is stuck trying to meet performance criteria for a prototype.
B)When strong group commitment is needed to decide methods to reduce project scope.
C)Expectations are unclear regarding a specific task.
D)Materials needed to finish a custom kitchen have not been determined.
E)Dysfunctional conflict between two project team members needs to be resolved.
Question
Symptoms of groupthink include

A)Encouraged functional conflict.
B)Negative stereotypes of outsiders.
C)Optimized critical thinking.
D)Failed projects.
E)Positive synergy.
Question
When not going through normal protocols of the parent organization becomes habit and results in rejection of policies and procedures, this is known as which of the following project pitfalls?

A)Groupthink
B)Going native
C)Bureaucratic bypass syndrome
D)Projectitis
E)The privileged parameter
Question
Which of the following would be considered the MOST effective project reward?

A)Desirable job assignments
B)Lump-sum cash award
C)All-expenses-paid trip for team members and their families
D)Using negative reinforcement to motivate adequate performance
E)Public recognition
Question
The first step in facilitating group decision making is to

A)Call a meeting to discuss the problem.
B)Identify the problem.
C)Agree that there is a problem.
D)Quantify the problem.
E)Generate alternatives.
Question
During the ________ stage of group development, the team prepares for its own disbandment.High performance is no longer a top priority.Instead attention is devoted to wrapping up the project.
Question
Experienced project managers understand the value of having team members ________ for the project as opposed to appointing team members.
Question
Research indicates that high-performance project teams are much more likely to develop under certain conditions.One of these conditions is that members report solely to the __________.
Question
The use of 6:30
A.M.The meetings continued for about two weeks until the project got back on schedule.At that time the project manager announced that the next meeting was canceled, and no further sunrise meetings were ever scheduled.
A.M.meetings to get a project back on schedule is an example of ______ reinforcement to motivate project performance.
Project managers do not have direct authority over many key people, especially the contractors from the other companies.They do, however, have the freedom to convene meetings at their convenience.A project manager instituted daily "coordination meetings," which were required of all the principals involved, at 6:30
Question
During the ________ stage of group development, the team is fully functional and working together to accomplish the project goals.
Question
During the ________ stage of group development, the members establish ground rules and try to find out what behaviors are acceptable to the team and individual team members.
Question
During the ________ stage of group development, close relationships develop and the group demonstrates cohesiveness.
Question
________ decision making should be used when strong commitment to a decision is needed and there is a low probability of acceptance if the decision were to be made by one person.
Question
When a project team will only consider a couple of solutions and ignore alternatives, this is ___________ which is a symptom of Groupthink.

A)Direct Pressure
B)Illusion of Invulnerability
C)Negative Stereotypes of Outsiders
D)Whitewash of Critical Thinking
Question
________ rewards typically should be used only when everyone on the team recognizes that a member is deserving of special recognition.
Question
An image a project team holds in common about how the project will look upon completion, how they will work together, and/or how customers will accept the project is known as a __________.It is a less tangible aspect of project performance.
Question
The first _________ is critical to the early functioning of the project team.It sets the tone for how the team will work together.
Question
When a project manager imposes a solution to the conflict after listening to each party, he or she is __________ the conflict.
Question
Because most project work is a collaborative effort, most project managers advocate the use of _______ rewards.
Question
During the ________ stage of group development, there is conflict over who will control the group and how decisions will be made.
Question
When a project manager intervenes and tries to negotiate a resolution by using reasoning and persuasion and suggesting alternatives, he or she is ___________ the conflict.
Question
Research indicates that high-performance project teams are much more likely to develop under certain conditions.One of these conditions is that members are assigned to the project _______ time.
Question
Team meetings, co-location of team members, team names, and team rituals are common vehicles when establishing a team _________.
Question
________ occurs when the whole is less than the sum of its parts.
Question
Symbolic actions at the project level that can contribute to a unique team subculture are called team ________.
Question
The main source of conflict in the delivering stage of the project life cycle is __________.
Question
One important factor that a project manager must acknowledge when recruiting project members is the management structure being used to complete the project.
Question
A project team gets things done without having to go through normal protocols of the parent organization.This is an example of _____________.
Question
A project manager should be wary of people who know too much about a specific technology.
Question
Co-location of team members, team names, and team rituals are common vehicles for establishing a team identity.
Question
Members who are geographically situated so that they may never be able to meet face-to-face would be a characteristic of a ________ project team.
Question
The first team meeting sets the tone for how the team will work together.
Question
Synergy can be both negative as well as positive.
Question
A project vision is an image a project team holds about how the project will look upon completion, how they will work together, and how customers will accept the project.It is important that everyone have the same vision.
Question
The norming stage of team development is one in which close relationships develop and the group demonstrates cohesiveness.
Question
Project managers should manage ___________ conflict.
Question
Research indicates that high-performance teams are much more likely to develop when the manager hand-selects team members.
Question
The performing stage of team development is characterized by the development of close relationships and group cohesiveness.
Question
There is a high degree of internal conflict in the forming stage of team development.
Question
When a project manager attempts to reduce the intensity of the conflict by smoothing over differences or interjecting humor, he or she is ___________ the conflict.
Question
Project managers and team members have to recognize the _________________ they are operating under in order to do the best that they can.
Question
The storming stage of team development is complete when conflicts are resolved and leadership roles are accepted.
Question
Every project has the same potential to evolve into a high-performance team.
Question
Project managers should encourage ___________ conflict.
Question
Most project managers advocate the use of group rewards rather than individual rewards.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/106
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 11: Managing Project Team
1
Establishing a team identity is facilitated by

A)Team members working in a common space.
B)Creation of a project team name.
C)Effective use of meetings.
D)Team rituals.
E)All of these are facilitators of establishing a team identity.
E
Explanation: Effective team meetings, co-location of team members, creation of a project team name, getting the team to work together early on, and team rituals are all vehicles to help establish a team identity.
2
Experience and research indicate that high-performance project teams are much more likely to develop under all the following conditions EXCEPT

A)Members are assigned to the project full time.
B)Members report solely to the project manager.
C)There are 10 or fewer members per team.
D)Team members are selected by their managers.
E)The project involves a compelling objective.
D
Explanation: Instead of managers selecting team members, high performance is more likely to develop when members volunteer to serve on the project team.
3
During which stage of team development do close relationships develop and the group demonstrates cohesiveness?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
A
Explanation: The norming stage is one in which close relationships develop and the group demonstrates cohesiveness.Feelings of camaraderie and shared responsibility for the project are heightened.
4
When recruiting project team members, which of the following factors is NOT something a project manager might consider?

A)The political connections the potential team member may have
B)Their problem-solving ability
C)Their ambition, initiative, and energy
D)Their skillset as it compares to the project manager
E)Their availability
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
5
There are two important factors that affect the recruitment of project members.Which of the following is one of those factors?

A)The budget available
B)The size of the project
C)The management structure being used to complete the project
D)The level of innovation and technical expertise needed
E)Organizational culture
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
6
Researchers have found that high-performance teams have norms for team interaction.Which of the following is NOT one of those norms?

A)Hard work does not get in the way of having fun.
B)No information is shared outside the team unless all agree to it.
C)It is acceptable to be in trouble, but not to surprise others.
D)When a decision has to be made, everyone should agree before moving forward.
E)There is no tolerance for bulling a way through a problem or issue.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
7
Project managers play a key role in developing high-performance project teams.Which of the following is NOT a contributing factor to this role?

A)Conduct project meetings
B)Recruit team members
C)Manage a reward system
D)Manage conflict
E)Report progress to top management
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
8
During which stage of team development do team members establish ground rules and try to find out what behaviors are acceptable and what performance expectations are?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
9
All of the following have been found to be good for running effective project meetings EXCEPT

A)Start meetings on time regardless of whether everyone is present.
B)Allow a time period for socializing to support the development of a team identity.
C)Thoroughly document all decisions.
D)Prepare and distribute an agenda prior to the meeting.
E)Identify an adjournment time.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
10
Which of the following is commonly associated with high-performing project teams?

A)Risk taking is controlled and not allowed to jeopardize the overall project.
B)Roles and specific responsibilities are well-defined.
C)A degree of competition among team members is encouraged.
D)Mistakes are viewed as opportunities for learning.
E)Team members are selected with similar talents to enhance cohesion.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
11
During which stage of team development is high performance not a top priority and attention is devoted to wrapping up the project?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
12
During which stage of team development is the team fully functional and accomplishing project goals?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
13
Tom is managing a project team responsible for building a new office building that started this week.He notices that team members are trying out different behaviors to see what is acceptable to the project and personal relations.Which stage of development is the team in?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
14
The essential qualities of an effective vision include all of the following EXCEPT

A)All team members have the same vision.
B)The vision should be communicated to all.
C)The vision has to make strategic sense.
D)There should be a passion for the vision.
E)The vision should be a source of inspiration to others.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
15
Roger is new-product project manager for a retail company.Recently the team has exhibited a high degree of conflict over who will control the group and how decisions will be made.Which stage of development is the team in?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
16
The first project meeting is critical to the early functioning of the project team.Which of the following is NOT true regarding this meeting?

A)An overview of the project's scope and objectives should be addressed.
B)Interpersonal interaction concerns should be addressed.
C)The project manager must model how the team will work together.
D)The meeting will need to be as long as necessary to cover the main objectives of a first meeting.
E)The meeting should be productive, well-organized and realistic.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
17
The essence of positive synergy can be found in the phrase

A)Front of ship sink-back of ship sink.
B)There is no "I" in team.
C)Two heads are better than one.
D)The whole is greater than the sum of the parts.
E)If it doesn't kill you, it makes you stronger.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
18
During which stage of team development do members accept that they are part of a project group but resist the constraints that the project and the group put on their individuality?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
19
The project manager must quickly establish operational ground rules for how the team will work together.These include planning, tracking, managing change, and relationship decisions.Which of the following is an example of a planning decision?

A)What departments will the team need to interact with during the project?
B)What are the specific roles and responsibilities of all the participants?
C)Who will generate and distribute reports?
D)How will changes be documented and evaluated?
E)How will progress be assessed?
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
20
Sam is the coach of a high school soccer team and has noticed that some close relationships have formed as well as feelings of camaraderie and shared responsibilities for the team's success.Which stage of development is the team in?

A)Norming
B)Storming
C)Performing
D)Adjourning
E)Forming
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
21
When project teams get too used to not having to go through normal approvals to get things done, this is called

A)Going Native.
B)Bureaucratic Bypass Syndrome.
C)Team Infatuation.
D)Groupthink.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
22
When a team is able to use identified individual talents to meet a projects given needs is a common characteristic of

A)Resource Allocation.
B)Scheduling.
C)Synergy.
D)Budgeting.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
23
How can a project manager support and encourage functional conflict?

A)Conflict should not be encouraged or supported
B)By asking tough questions and by challenging the rationale behind recommendations
C)By imposing a solution to the conflict after listening to each party
D)By negotiating a resolution by reasoning and persuasion
E)As soon as emotions flare, he or she can intervene and attempt to control conflict because it has become dysfunctional
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
24
The biggest challenge to managing a virtual project team is

A)Getting reports and technical information communicated.
B)Developing trust and establishing effective patterns of communication.
C)Enforcing deadlines.
D)Dealing with team members in different time zones.
E)Being able to contact team members immediately when there is a problem.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
25
During the delivery phase of a project's life cycle, the most significant source of conflict is

A)Schedules.
B)Priorities.
C)Technical.
D)Procedures.
E)Costs.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
26
Strategies to manage dysfunctional conflict do NOT include _____ the conflict.

A)Control
B)Arbitrate
C)Mediate
D)Accept
E)Encourage
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
27
When reaching a decision during the group decision-making process, the project manager must build a consensus among the group and can do this by all of the following EXCEPT

A)If time becomes a factor, they must make an informed final decision after everyone's ideas have been heard.
B)Provide periodic summaries to help the group keep track of its progress.
C)Protect those members who represent the minority view.
D)Guarantee that everyone has the opportunity to share opinions.
E)Manage any conflict that may arise.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
28
Challenges to managing geographically distributed team are

A)Developing trust.
B)Keeping time-zones straight.
C)Effective communication.
D)Developing trust and effective communication.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
29
When project managers impose a solution to dysfunctional conflict after listening to each party, they are __________ the conflict.

A)Eliminating
B)Controlling
C)Mediating
D)Arbitrating
E)Encouraging
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
30
Individual rewards for outstanding work would NOT include

A)Letters of commendation.
B)Public recognition.
C)Desirable job assignments.
D)Judiciously making exceptions to the rules.
E)All of these are examples of individual rewards for outstanding work.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
31
Which of the following is NOT one of the tips for alleviating communication problems of virtual teams?

A)Insist team members travel at least once during the project for a face-to-face meeting.
B)Keep team members informed on how well the overall project is going.
C)Share the pain when team members reside in different time zones.
D)Establish clear norms and protocols for surfacing assumptions and conflicts.
E)Establish a code of conduct to avoid delays.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
32
When project managers reduce the intensity of the conflict by smoothing over differences or interjecting humor when dysfunctional conflict arises, they are attempting to _________ the conflict.

A)Eliminate
B)Control
C)Mediate
D)Arbitrate
E)Encourage
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
33
While some conflict can be beneficial, the absence of conflict can mask

A)Project mistakes.
B)Lowered customer expectations.
C)Useful information.
D)All of these choices are correct.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
34
When dysfunctional conflict is identified, one of the ways to deal with it is to

A)Impose an arbitrated solution.
B)Show understanding and support.
C)Escalate it up the management chain.
D)Encourage the conflict.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
35
High performing teams can

A)Create breakthrough products.
B)Exceed customer expectations.
C)Complete projects ahead of schedule and under budget.
D)All of these choices are correct.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
36
Which of the following would be an appropriate situation to require facilitating group decision making?

A)A mechanical engineer is stuck trying to meet performance criteria for a prototype.
B)When strong group commitment is needed to decide methods to reduce project scope.
C)Expectations are unclear regarding a specific task.
D)Materials needed to finish a custom kitchen have not been determined.
E)Dysfunctional conflict between two project team members needs to be resolved.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
37
Symptoms of groupthink include

A)Encouraged functional conflict.
B)Negative stereotypes of outsiders.
C)Optimized critical thinking.
D)Failed projects.
E)Positive synergy.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
38
When not going through normal protocols of the parent organization becomes habit and results in rejection of policies and procedures, this is known as which of the following project pitfalls?

A)Groupthink
B)Going native
C)Bureaucratic bypass syndrome
D)Projectitis
E)The privileged parameter
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
39
Which of the following would be considered the MOST effective project reward?

A)Desirable job assignments
B)Lump-sum cash award
C)All-expenses-paid trip for team members and their families
D)Using negative reinforcement to motivate adequate performance
E)Public recognition
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
40
The first step in facilitating group decision making is to

A)Call a meeting to discuss the problem.
B)Identify the problem.
C)Agree that there is a problem.
D)Quantify the problem.
E)Generate alternatives.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
41
During the ________ stage of group development, the team prepares for its own disbandment.High performance is no longer a top priority.Instead attention is devoted to wrapping up the project.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
42
Experienced project managers understand the value of having team members ________ for the project as opposed to appointing team members.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
43
Research indicates that high-performance project teams are much more likely to develop under certain conditions.One of these conditions is that members report solely to the __________.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
44
The use of 6:30
A.M.The meetings continued for about two weeks until the project got back on schedule.At that time the project manager announced that the next meeting was canceled, and no further sunrise meetings were ever scheduled.
A.M.meetings to get a project back on schedule is an example of ______ reinforcement to motivate project performance.
Project managers do not have direct authority over many key people, especially the contractors from the other companies.They do, however, have the freedom to convene meetings at their convenience.A project manager instituted daily "coordination meetings," which were required of all the principals involved, at 6:30
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
45
During the ________ stage of group development, the team is fully functional and working together to accomplish the project goals.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
46
During the ________ stage of group development, the members establish ground rules and try to find out what behaviors are acceptable to the team and individual team members.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
47
During the ________ stage of group development, close relationships develop and the group demonstrates cohesiveness.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
48
________ decision making should be used when strong commitment to a decision is needed and there is a low probability of acceptance if the decision were to be made by one person.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
49
When a project team will only consider a couple of solutions and ignore alternatives, this is ___________ which is a symptom of Groupthink.

A)Direct Pressure
B)Illusion of Invulnerability
C)Negative Stereotypes of Outsiders
D)Whitewash of Critical Thinking
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
50
________ rewards typically should be used only when everyone on the team recognizes that a member is deserving of special recognition.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
51
An image a project team holds in common about how the project will look upon completion, how they will work together, and/or how customers will accept the project is known as a __________.It is a less tangible aspect of project performance.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
52
The first _________ is critical to the early functioning of the project team.It sets the tone for how the team will work together.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
53
When a project manager imposes a solution to the conflict after listening to each party, he or she is __________ the conflict.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
54
Because most project work is a collaborative effort, most project managers advocate the use of _______ rewards.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
55
During the ________ stage of group development, there is conflict over who will control the group and how decisions will be made.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
56
When a project manager intervenes and tries to negotiate a resolution by using reasoning and persuasion and suggesting alternatives, he or she is ___________ the conflict.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
57
Research indicates that high-performance project teams are much more likely to develop under certain conditions.One of these conditions is that members are assigned to the project _______ time.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
58
Team meetings, co-location of team members, team names, and team rituals are common vehicles when establishing a team _________.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
59
________ occurs when the whole is less than the sum of its parts.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
60
Symbolic actions at the project level that can contribute to a unique team subculture are called team ________.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
61
The main source of conflict in the delivering stage of the project life cycle is __________.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
62
One important factor that a project manager must acknowledge when recruiting project members is the management structure being used to complete the project.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
63
A project team gets things done without having to go through normal protocols of the parent organization.This is an example of _____________.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
64
A project manager should be wary of people who know too much about a specific technology.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
65
Co-location of team members, team names, and team rituals are common vehicles for establishing a team identity.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
66
Members who are geographically situated so that they may never be able to meet face-to-face would be a characteristic of a ________ project team.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
67
The first team meeting sets the tone for how the team will work together.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
68
Synergy can be both negative as well as positive.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
69
A project vision is an image a project team holds about how the project will look upon completion, how they will work together, and how customers will accept the project.It is important that everyone have the same vision.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
70
The norming stage of team development is one in which close relationships develop and the group demonstrates cohesiveness.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
71
Project managers should manage ___________ conflict.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
72
Research indicates that high-performance teams are much more likely to develop when the manager hand-selects team members.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
73
The performing stage of team development is characterized by the development of close relationships and group cohesiveness.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
74
There is a high degree of internal conflict in the forming stage of team development.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
75
When a project manager attempts to reduce the intensity of the conflict by smoothing over differences or interjecting humor, he or she is ___________ the conflict.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
76
Project managers and team members have to recognize the _________________ they are operating under in order to do the best that they can.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
77
The storming stage of team development is complete when conflicts are resolved and leadership roles are accepted.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
78
Every project has the same potential to evolve into a high-performance team.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
79
Project managers should encourage ___________ conflict.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
80
Most project managers advocate the use of group rewards rather than individual rewards.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 106 flashcards in this deck.