Deck 12: Information Systems Development

Full screen (f)
exit full mode
Question
The ________ is the traditional process used to develop information systems.

A)rapid application development (RAD)
B)object-oriented design (OOD)
C)systems development life cycle (SDLC)
D)extreme programming (XP)
Use Space or
up arrow
down arrow
to flip the card.
Question
Explain how diseconomies of scale can affect systems development.
Question
According to Brooks' Law, which of the following is a consequence of adding more people to late projects?

A)The work allocation per team member increases.
B)The costs of training new people can overwhelm the benefits of their contribution.
C)Beyond a workgroup of about 20 employees, economies of scale begin to take over.
D)It allows the managers to extend the timeline of the project.
Question
Which of the following is the first phase of the systems development life cycle?

A)requirements analysis
B)business planning process
C)implementation
D)system definition
Question
Information systems involve people and procedures, so they can never be off-the-shelf.
Question
Which of the following statements is true of systems development?

A)It has little need for human relations skills as tasks are performed by individuals and not by groups.
B)It is a technical task undertaken exclusively by programmers and hardware specialists.
C)It has lesser scope than computer program development.
D)It requires business knowledge and an understanding of group dynamics.
Question
What is systems development? How is it different from program development?
Question
One of the major challenges in systems development is changing technology.
Question
As development teams become larger, the average contribution per worker decreases.
Question
It is essential to estimate a system's cost to calculate its rate of return.
Question
Information systems cannot be tailor-made.
Question
Which of the following statements is true of systems development for bigger systems and longer projects?

A)The diseconomies of scale are reduced.
B)The changes in requirements are increased.
C)The average contribution per worker is increased.
D)The project budgeting and scheduling becomes easy.
Question
Why is systems development difficult and risky?
Question
In the ________ phase of the systems development life cycle, developers use management's statement of the system needs in order to develop a new information system.

A)system definition
B)requirements analysis
C)component design
D)implementation
Question
When compared to program development, systems development is ________.

A)narrower in focus
B)less comprehensive
C)broader in scope
D)more technical
Question
Brooks' Law holds true because a larger staff requires decreased coordination.
Question
Systems development is easy and risk-free.
Question
The process of creating and maintaining information systems is called ________.

A)systems development
B)systems acquisition
C)systems definition
D)systems configuration
Question
Which of the following statements is true of information systems?

A)They are off-the-shelf software without adaptation.
B)They can be adapted to fit business needs.
C)They can be purchased as off-the-shelf software.
D)They cannot be tailor-made.
Question
According to Brooks' Law, adding more people to a late project ________.

A)makes the project later
B)decreases the overall cost
C)requires decreased staff coordination
D)increases the project's timeline
Question
During design and implementation, a development team will be heavy with ________.

A)business analysts
B)business users
C)programmers
D)senior managers
Question
Explain the tasks performed during the system definition phase of the systems development life cycle.
Question
The goals and scope of a new information system are determined during the requirements analysis phase of the systems development life cycle.
Question
Which of the following is the first step in defining a new information system?

A)assess the feasibility of the project
B)explain the goals and scope of the project
C)determine the schedule and budget for the project
D)form the project team
Question
In which of the following phases of the systems development life cycle do developers identify the particular features and functions of a new system?

A)system definition
B)requirements analysis
C)component design
D)implementation
Question
If a new system involves a new database or substantial changes to an existing database, then the development team will have to create a(n)________.

A)data model
B)replica
C)archetype
D)test plan
Question
Business analysts integrate the work of the programmers, testers, and users.
Question
Define the terms cost feasibility, technical feasibility, and organizational feasibility.
Question
The cost feasibility of a systems development project depends on the scope of the project.
Question
Which of the following steps in the systems definition process aims to eliminate obviously nonsensible projects?

A)define the system goals and scope
B)form the project team
C)assess the project feasibility
D)plan the project requirements
Question
What are the five phases of the systems development life cycle (SDLC)?
Question
A development team's composition changes over time.
Question
Which of the following is the most important phase in the SDLC?

A)define the goals and scope of the new information system
B)implement the information system
C)determine the system's requirements
D)adapt systems to changes in requirements
Question
________ feasibility concerns whether a new information system fits within a company's customs, culture, charter, or legal requirements.

A)Technical
B)Cost
C)Schedule
D)Organizational
Question
Who are the members of a systems project team? Explain the roles of business analysts and systems analysts.
Question
Which of the following statements is true of the composition of a development team over the different phases of the systems development life cycle?

A)During conversion, the team will be heavy with database designers.
B)During requirements definition, the team will be heavy with testers and database designers.
C)During integrated testing and conversion, the team will be augmented with business users.
D)During design and implementation, the team will be augmented with business users.
Question
The description of fixes and new requirements is the input to a system maintenance phase of a systems development life cycle.
Question
Organizational feasibility refers to estimating the time it will take to complete a project.
Question
During requirements definition, a development team's composition will be typically heavy with ________.

A)systems analysts
B)programmers
C)business users
D)beta testers
Question
The project plan resulting from system definition is the input for requirement analysis.
Question
Mock-ups of forms and reports can generate similar benefits as a working prototype.
Question
During the ________ phase of the systems development life cycle process, developers construct, install, and test the components of the information system.

A)requirements analysis
B)database design
C)feasibility assessment
D)implementation
Question
The security needs of an information system are determined during the component design phase of the systems development life cycle.
Question
Which of the following is the most expensive style of system conversion?

A)pilot installation
B)phased installation
C)parallel installation
D)plunge installation
Question
Interviews are conducted with system users in the requirements analysis phase of the systems development life cycle.
Question
System ________ refers to the process of changing business activity from an old information system to a new system.

A)definition
B)testing
C)analysis
D)conversion
Question
In a ________ installation, a new system runs alongside the old one until the new one has been tested and is fully operational.

A)pilot
B)parallel
C)phased
D)plunge
Question
While designing ________, a development team must produce design documentation for writing program code.

A)off-the-shelf with alteration software
B)custom-developed programs
C)off-the-shelf software
D)cloud-based programs
Question
In a ________ installation, an organization implements an entire system on a limited portion of the business.

A)phased
B)parallel
C)pilot
D)plunge
Question
Olive Inc., a chain of retail outlets, is converting its existing billing systems to a more robust online tool.In this process, the organization runs both the old and the new systems to compare their performances.In this case, the company is implementing the new system using ________ installation.

A)parallel
B)pilot
C)plunge
D)phased
Question
A comprehensive test plan should ________.

A)not include incorrect actions that users take
B)cause every line of program code to be executed
C)cause only critical error messages to be displayed
D)be constructed by only product quality assurance (PQA)personnel
Question
The easiest and cheapest time to alter an information system is in the ________ phase of the systems development life cycle.

A)requirements analysis
B)system definition
C)component design
D)implementation
Question
Which of the following personnel in a development team has the final say on whether a system is ready for use?

A)managers
B)systems analysts
C)users
D)PQA personnel
Question
Procedures for a business information system are designed usually by ________.

A)testers
B)programmers
C)systems analysts
D)business analysts
Question
________ testing is the process of allowing future system users to try out a new system on their own.

A)Unit
B)Alpha
C)Integration
D)Beta
Question
Which of the following is a typical concern for developers while using prototypes?

A)comparing a system's features with requirements
B)understanding a system's complete requirements
C)assessing a system's technical feasibility
D)developing a uniform funding solution for the system
Question
In terms of software design for custom-developed programs, a development team identifies off-the-shelf products and then determines the alterations required.
Question
Explain the importance of the requirements analysis phase of the systems development life cycle (SDLC).
Question
Explain how the software component of an information system is designed.
Question
Normal processing procedures for operations personnel involve procedures for ________.

A)continuing operations when the system fails
B)backing up data and other resources
C)using the system to accomplish business tasks
D)starting, stopping, and operating the system
Question
Testing is often called product quality assurance (PQA).
Question
In pilot installation, a new system is installed in phases across an organization.
Question
Which of the following styles of system conversion shuts off the old system and starts a new system?

A)plunge installation
B)parallel installation
C)pilot installation
D)phased installation
Question
What are the tasks of system maintenance?
Question
Software developers group the fixes for high-priority failures into a group that can be applied to all copies of a given product called a ________.

A)service pack
B)bug
C)patch
D)product key
Question
Estimates of labor hours and completion dates are accurate for large, multiyear projects.
Question
Plunge installation is sometimes called direct installation.
Question
Which of the following statements is true of system maintenance?

A)Software developers usually bundle fixes for low-priority problems into a patch.
B)Information systems (IS)personnel prioritize system problems on a first-come-first-served basis.
C)All commercial software products are shipped with known failures.
D)Service packs are developed to fix a single problem at a time.
Question
Which of the following is a major concern for developers in a systems development life cycle process?

A)having to work with a team of specialists
B)moving through the unstructured phases of the cycle
C)agreeing on the basic tasks to be performed to build a system
D)performing repetitive tasks of a completed phase
Question
Explain the problems caused due to the waterfall nature of the systems development life cycle.
Question
Projects are said to be in analysis paralysis if so much time is spent ________.

A)in the system definition phase of the systems development life cycle (SDLC)
B)on project scheduling
C)documenting the requirements
D)designing the system components
Question
Software vendors usually bundle fixes of low-priority problems into larger groups called ________.

A)patches
B)service packs
C)bugs
D)product keys
Question
What are the four ways in which organizations can implement a system conversion?
Question
What is beta testing?
Question
What are patches and service packs?
Question
Beta testing is the last phase of a testing process.
Question
What is a test plan?
Question
Actual systems development generally works in accordance with the waterfall nature of the systems development life cycle.
Question
The systems development life cycle process is supposed to operate in a sequence of nonrepetitive phases.
Question
The maintenance phase can start another cycle of the systems development life cycle (SLDC).
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/80
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 12: Information Systems Development
1
The ________ is the traditional process used to develop information systems.

A)rapid application development (RAD)
B)object-oriented design (OOD)
C)systems development life cycle (SDLC)
D)extreme programming (XP)
C
2
Explain how diseconomies of scale can affect systems development.
Unfortunately, as development teams become larger, the average contribution per worker decreases.This is True because, as staff size increases, more meetings and other coordinating activities are required to keep everyone in sync.There are economies of scale up to a point, but beyond a workgroup of, say, 20 employees, diseconomies of scale begin to take over.Brooks' Law points out a related problem: The addition of more people to a late project makes the project later.Brooks' Law is True not only because a larger staff requires increased coordination, but also because new people need training.The only people who can train the new employees are the existing team members, who are thus taken off productive tasks.The costs of training new people can overwhelm the benefit of their contribution.
3
According to Brooks' Law, which of the following is a consequence of adding more people to late projects?

A)The work allocation per team member increases.
B)The costs of training new people can overwhelm the benefits of their contribution.
C)Beyond a workgroup of about 20 employees, economies of scale begin to take over.
D)It allows the managers to extend the timeline of the project.
B
4
Which of the following is the first phase of the systems development life cycle?

A)requirements analysis
B)business planning process
C)implementation
D)system definition
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
5
Information systems involve people and procedures, so they can never be off-the-shelf.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
6
Which of the following statements is true of systems development?

A)It has little need for human relations skills as tasks are performed by individuals and not by groups.
B)It is a technical task undertaken exclusively by programmers and hardware specialists.
C)It has lesser scope than computer program development.
D)It requires business knowledge and an understanding of group dynamics.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
7
What is systems development? How is it different from program development?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
8
One of the major challenges in systems development is changing technology.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
9
As development teams become larger, the average contribution per worker decreases.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
10
It is essential to estimate a system's cost to calculate its rate of return.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
11
Information systems cannot be tailor-made.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
12
Which of the following statements is true of systems development for bigger systems and longer projects?

A)The diseconomies of scale are reduced.
B)The changes in requirements are increased.
C)The average contribution per worker is increased.
D)The project budgeting and scheduling becomes easy.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
13
Why is systems development difficult and risky?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
14
In the ________ phase of the systems development life cycle, developers use management's statement of the system needs in order to develop a new information system.

A)system definition
B)requirements analysis
C)component design
D)implementation
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
15
When compared to program development, systems development is ________.

A)narrower in focus
B)less comprehensive
C)broader in scope
D)more technical
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
16
Brooks' Law holds true because a larger staff requires decreased coordination.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
17
Systems development is easy and risk-free.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
18
The process of creating and maintaining information systems is called ________.

A)systems development
B)systems acquisition
C)systems definition
D)systems configuration
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
19
Which of the following statements is true of information systems?

A)They are off-the-shelf software without adaptation.
B)They can be adapted to fit business needs.
C)They can be purchased as off-the-shelf software.
D)They cannot be tailor-made.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
20
According to Brooks' Law, adding more people to a late project ________.

A)makes the project later
B)decreases the overall cost
C)requires decreased staff coordination
D)increases the project's timeline
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
21
During design and implementation, a development team will be heavy with ________.

A)business analysts
B)business users
C)programmers
D)senior managers
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
22
Explain the tasks performed during the system definition phase of the systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
23
The goals and scope of a new information system are determined during the requirements analysis phase of the systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
24
Which of the following is the first step in defining a new information system?

A)assess the feasibility of the project
B)explain the goals and scope of the project
C)determine the schedule and budget for the project
D)form the project team
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
25
In which of the following phases of the systems development life cycle do developers identify the particular features and functions of a new system?

A)system definition
B)requirements analysis
C)component design
D)implementation
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
26
If a new system involves a new database or substantial changes to an existing database, then the development team will have to create a(n)________.

A)data model
B)replica
C)archetype
D)test plan
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
27
Business analysts integrate the work of the programmers, testers, and users.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
28
Define the terms cost feasibility, technical feasibility, and organizational feasibility.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
29
The cost feasibility of a systems development project depends on the scope of the project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
30
Which of the following steps in the systems definition process aims to eliminate obviously nonsensible projects?

A)define the system goals and scope
B)form the project team
C)assess the project feasibility
D)plan the project requirements
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
31
What are the five phases of the systems development life cycle (SDLC)?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
32
A development team's composition changes over time.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
33
Which of the following is the most important phase in the SDLC?

A)define the goals and scope of the new information system
B)implement the information system
C)determine the system's requirements
D)adapt systems to changes in requirements
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
34
________ feasibility concerns whether a new information system fits within a company's customs, culture, charter, or legal requirements.

A)Technical
B)Cost
C)Schedule
D)Organizational
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
35
Who are the members of a systems project team? Explain the roles of business analysts and systems analysts.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
36
Which of the following statements is true of the composition of a development team over the different phases of the systems development life cycle?

A)During conversion, the team will be heavy with database designers.
B)During requirements definition, the team will be heavy with testers and database designers.
C)During integrated testing and conversion, the team will be augmented with business users.
D)During design and implementation, the team will be augmented with business users.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
37
The description of fixes and new requirements is the input to a system maintenance phase of a systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
38
Organizational feasibility refers to estimating the time it will take to complete a project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
39
During requirements definition, a development team's composition will be typically heavy with ________.

A)systems analysts
B)programmers
C)business users
D)beta testers
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
40
The project plan resulting from system definition is the input for requirement analysis.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
41
Mock-ups of forms and reports can generate similar benefits as a working prototype.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
42
During the ________ phase of the systems development life cycle process, developers construct, install, and test the components of the information system.

A)requirements analysis
B)database design
C)feasibility assessment
D)implementation
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
43
The security needs of an information system are determined during the component design phase of the systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
44
Which of the following is the most expensive style of system conversion?

A)pilot installation
B)phased installation
C)parallel installation
D)plunge installation
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
45
Interviews are conducted with system users in the requirements analysis phase of the systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
46
System ________ refers to the process of changing business activity from an old information system to a new system.

A)definition
B)testing
C)analysis
D)conversion
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
47
In a ________ installation, a new system runs alongside the old one until the new one has been tested and is fully operational.

A)pilot
B)parallel
C)phased
D)plunge
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
48
While designing ________, a development team must produce design documentation for writing program code.

A)off-the-shelf with alteration software
B)custom-developed programs
C)off-the-shelf software
D)cloud-based programs
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
49
In a ________ installation, an organization implements an entire system on a limited portion of the business.

A)phased
B)parallel
C)pilot
D)plunge
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
50
Olive Inc., a chain of retail outlets, is converting its existing billing systems to a more robust online tool.In this process, the organization runs both the old and the new systems to compare their performances.In this case, the company is implementing the new system using ________ installation.

A)parallel
B)pilot
C)plunge
D)phased
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
51
A comprehensive test plan should ________.

A)not include incorrect actions that users take
B)cause every line of program code to be executed
C)cause only critical error messages to be displayed
D)be constructed by only product quality assurance (PQA)personnel
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
52
The easiest and cheapest time to alter an information system is in the ________ phase of the systems development life cycle.

A)requirements analysis
B)system definition
C)component design
D)implementation
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
53
Which of the following personnel in a development team has the final say on whether a system is ready for use?

A)managers
B)systems analysts
C)users
D)PQA personnel
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
54
Procedures for a business information system are designed usually by ________.

A)testers
B)programmers
C)systems analysts
D)business analysts
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
55
________ testing is the process of allowing future system users to try out a new system on their own.

A)Unit
B)Alpha
C)Integration
D)Beta
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
56
Which of the following is a typical concern for developers while using prototypes?

A)comparing a system's features with requirements
B)understanding a system's complete requirements
C)assessing a system's technical feasibility
D)developing a uniform funding solution for the system
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
57
In terms of software design for custom-developed programs, a development team identifies off-the-shelf products and then determines the alterations required.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
58
Explain the importance of the requirements analysis phase of the systems development life cycle (SDLC).
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
59
Explain how the software component of an information system is designed.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
60
Normal processing procedures for operations personnel involve procedures for ________.

A)continuing operations when the system fails
B)backing up data and other resources
C)using the system to accomplish business tasks
D)starting, stopping, and operating the system
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
61
Testing is often called product quality assurance (PQA).
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
62
In pilot installation, a new system is installed in phases across an organization.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
63
Which of the following styles of system conversion shuts off the old system and starts a new system?

A)plunge installation
B)parallel installation
C)pilot installation
D)phased installation
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
64
What are the tasks of system maintenance?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
65
Software developers group the fixes for high-priority failures into a group that can be applied to all copies of a given product called a ________.

A)service pack
B)bug
C)patch
D)product key
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
66
Estimates of labor hours and completion dates are accurate for large, multiyear projects.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
67
Plunge installation is sometimes called direct installation.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
68
Which of the following statements is true of system maintenance?

A)Software developers usually bundle fixes for low-priority problems into a patch.
B)Information systems (IS)personnel prioritize system problems on a first-come-first-served basis.
C)All commercial software products are shipped with known failures.
D)Service packs are developed to fix a single problem at a time.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
69
Which of the following is a major concern for developers in a systems development life cycle process?

A)having to work with a team of specialists
B)moving through the unstructured phases of the cycle
C)agreeing on the basic tasks to be performed to build a system
D)performing repetitive tasks of a completed phase
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
70
Explain the problems caused due to the waterfall nature of the systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
71
Projects are said to be in analysis paralysis if so much time is spent ________.

A)in the system definition phase of the systems development life cycle (SDLC)
B)on project scheduling
C)documenting the requirements
D)designing the system components
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
72
Software vendors usually bundle fixes of low-priority problems into larger groups called ________.

A)patches
B)service packs
C)bugs
D)product keys
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
73
What are the four ways in which organizations can implement a system conversion?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
74
What is beta testing?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
75
What are patches and service packs?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
76
Beta testing is the last phase of a testing process.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
77
What is a test plan?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
78
Actual systems development generally works in accordance with the waterfall nature of the systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
79
The systems development life cycle process is supposed to operate in a sequence of nonrepetitive phases.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
80
The maintenance phase can start another cycle of the systems development life cycle (SLDC).
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 80 flashcards in this deck.