Deck 3: Managing the Information Systems Project

Full screen (f)
exit full mode
Question
A ________,which is conducted by the project manager,involves determining if the information system makes sense for the organization from an economic and operational standpoint.

A)Tool
B)Feasibility study
C)Data flow
D)Methodology
Use Space or
up arrow
down arrow
to flip the card.
Question
________ is NOT a skill pertaining to the team management activity of a project manager.

A)Self-management
B)Team-building
C)Peer-evaluation
D)Forecasting
Question
To successfully orchestrate the construction of a complex information system,a project manager must have ________,leadership,and technical skills.

A)Planning
B)Initiating
C)Executing
D)Interpersonal
Question
________ is NOT a skill pertaining to the management activity of a project manager.

A)Monitoring outcomes
B)Assigning resources to activities
C)Communicating expectations
D)Forecasting
Question
________ is NOT a common skill pertaining to the leadership activity of a project manager.

A)Communication
B)Working on assigned activities
C)Assigning activities
D)Monitoring progress
Question
________ is a controlled process of initiating,planning,executing,and closing down a project.

A)System design
B)System analysis
C)Project scheduling
D)Project management
Question
Identifying,assessing,and managing the risks and day-to-day changes that occur during a project is attributed to ________.

A)Forecasting
B)Team-building
C)Goal setting
D)Risk and change management
Question
The ________ is a systems analyst with a diverse set of skills-management,leadership,technical,conflict management,and customer relationship-who is responsible for initiating,planning,executing,and closing down a project.

A)Consultant
B)Project scheduler
C)Project manager
D)Project assistant
Question
Working closely with customers to ensure that project deliverables meet expectations is a ________ activity of a project manager.

A)Resource redeployment
B)Forecasting
C)Management
D)Customer relations
Question
Managing the project team for effective team performance represents a ________ activity of a project manager.

A)Leadership
B)Change management
C)Risk management
D)Team management
Question
Which of the following is NOT a part of the project management process?

A)Planning
B)Initiating
C)Executing
D)Adjoining
Question
Influencing the activities of others toward the attainment of a common goal through the use of intelligence,personality,and abilities refers to the ________ activity of a project manager.

A)Management
B)Leadership
C)Team management
D)Conflict management
Question
________ is NOT a skill pertaining to the technical problem solving activity of a project manager.

A)Contact point for payroll team
B)Defining activities and their sequence
C)Making trade-offs between alternative solutions
D)Interpreting system requests and specifications
Question
________ is NOT a skill pertaining to the customer relations activity of a project manager.

A)Interpreting system requests
B)Interpreting system specifications
C)Contact point for developers
D)User training
Question
________ is NOT a skill pertaining to the conflict management activity of a project manager.

A)Problem solving
B)Smoothing out personality differences
C)Monitoring
D)Compromising
Question
________ is NOT a skill pertaining to the risk and change management activity of a project manager.

A)Environmental scanning
B)Team-building
C)Risk and opportunity identification and assessment
D)Resource redeployment
Question
A ________ is a planned undertaking of a series of related activities to reach an objective that has a beginning and an end.

A)Project
B)Technique
C)Data flow
D)Methodology
Question
A ________ is an end product of an SDLC phase.

A)System tester
B)Requirement
C)Modeler
D)Deliverable
Question
Getting projects completed through the effective utilization of resources is a ________ activity of a project manager.

A)Management
B)Risk management
C)Change management
D)Team management
Question
Which of the following is NOT an activity found in the project initiation phase?

A)Establishing the project initiation team
B)Establishing a relationship with the developer
C)Establishing the project initiation plan
D)Establishing management procedures
Question
Which is the first activity in the project planning phase?

A)Setting a baseline project plan
B)Creating a preliminary budget
C)Identifying and assessing risk
D)Describing project scope,alternatives,and feasibility
Question
________ is the process of dividing the project into manageable tasks and logically ordering them to ensure a smooth evolution between tasks.

A)Work breakdown structure
B)Task breakdown structure
C)Project breakdown structure
D)Management breakdown structure
Question
Which of the following is FALSE in the context of the project workbook?

A)It can be stored as an online electronic document.
B)It can be stored in a large three-ring binder.
C)The project workbook is used by all team members.
D)It is not useful for project audits.
Question
Defining tasks in too much detail will make the management of the project ________.

A)Unnecessarily complex
B)Simple
C)Extremely streamlined
D)Constructive
Question
Tasks that are ________ in scope will provide a clear sense of the status of the project or of the interdependencies between tasks.

A)Short
B)Medium
C)Long
D)Optimal
Question
Most project management software tools support a broad range of task durations,including minutes,hours,days,weeks,and ________.

A)Months
B)Years
C)Centuries
D)Decades
Question
How many activities are involved in the project initiation phase?

A)Four
B)Five
C)Six
D)Three
Question
What is the next step taken after project initiation?

A)Project bidding
B)Project planning
C)Project execution
D)Project development
Question
Which of the following is FALSE with respect to a task in a project plan?

A)It can be done by one person only.
B)It has a single and identifiable deliverable.
C)It has a known method or technique.
D)It has well-accepted predecessor and successor steps.
Question
A Gantt chart is the graphical representation of a project that shows each task as a ________ bar whose length is proportional to its time for completion.

A)vertical
B)linear
C)curve
D)horizontal
Question
Which of the following is NOT true with respect to determining project standards and procedures?

A)Specifies how various deliverables are produced and tested
B)Specifies how the standard SDLC might be modified
C)Specifies which SDLC methods will be used
D)Specifies the budget and resource allocation
Question
Which of the following is FALSE with respect to resource estimation activity?

A)This information is used to create a project resource plan.
B)Project managers use a variety of tools to assist in making estimates of project size and costs.The most widely used method is called COCOMO.
C)Resource estimates may need not be revised based upon the skills of the actual person (or people)assigned to a particular activity.
D)People are the most important,and expensive,part of project resource planning.
Question
Resource estimates may need to be revised based upon the skills of the actual person (or people)assigned to a particular ________.

A)Activity
B)Group
C)Person
D)Team
Question
The distinguishing feature of a network diagram is that the ordering of tasks is shown by connecting tasks-depicted as ________ or ovals-with their predecessor and successor tasks.

A)Circles
B)Diamonds
C)Ellipticals
D)Rectangles
Question
Which of the following is NOT true of a project communication plan?

A)It outlines the communication procedures among management,project team members,and the customer.
B)It includes when and how written and oral reports will be provided by the team.
C)It does not define communication with vendors and external contractors.
D)It includes how team members will coordinate work.
Question
During ________,the project manager performs several activities to assess the size,scope,and complexity of the project and to establish procedures to support subsequent activities.

A)Project bidding
B)Project development
C)Project initiation
D)Project delivery
Question
Which of the following is a FALSE statement regarding the Project Scope Statement?

A)It occurs near the end of the project planning phase.
B)It is developed primarily for the customer.
C)It clearly describes what the project will deliver.
D)It is a description of the alternative solution.
Question
The project charter will never include which of the following?

A)Project objectives and description
B)Project budget
C)Projected start and completion dates
D)Key stakeholders,project role,and responsibilities
Question
Which of the following is FALSE in the context of the project charter?

A)It will not have the project manager's name and contact information.
B)It includes the project title and date of authorization.
C)It outlines many of the key elements of the project.
D)It is a high-level document prepared for the customer.
Question
COCOMO stands for ________.

A)Constructive Coordination Model
B)Constructive Cost Model
C)Collective Cost Model
D)Constructive Correction Model
Question
Which of the following is NOT a stakeholder involved in the project communication matrix?

A)Team members
B)Facilities team
C)User group
D)Contract programmers
Question
Closing down a project is not an activity performed in the project management process.
Question
Systems development projects are undertaken for two primary reasons: to take advantage of business opportunities and to solve business problems.
Question
In project initiation,the developer performs several activities to assess the size,scope,and complexity of the project and to establish procedures to support subsequent activities.
Question
Designing and sequencing activities to attain project goals describes the technical problem solving activity.
Question
An example of a project manager leadership activity is helping the team work towards a common goal.
Question
At the end of the project planning phase,________ of the Baseline Project Plan is conducted to double-check all information in the plan.

A)Rating
B)Testing
C)Review
D)Planning
Question
In some organizations,the project manager is a very experienced systems analyst,whereas in others,both junior and senior analysts are expected to take on this role,managing parts of a project or actively supporting a more senior colleague who assumes the project manager role.
Question
Interpreting system requests and specifications is not a skill required as part of the customer relations activity for a project manager.
Question
A project is an unplanned undertaking of a series of related activities to reach an objective that has a beginning and an end.
Question
A study that determines if the proposed information system makes sense for the organization from an economic and operational standpoint is called non-feasibility study.
Question
________ are used by project managers to depict resource utilization by task.

A)Textual reports
B)Bar graphs
C)Pie charts
D)Flow charts
Question
The last deliverable,or end product,produced by Chris and Juanita was a System Service Request (SSR),a standard form PVF uses for requesting systems development work.
Question
Which of the following is FALSE with respect to the Gantt chart and network diagram?

A)Gantt charts visually show the duration of tasks,whereas a network diagram visually shows the sequence dependencies between tasks.
B)Gantt charts visually show the time overlap of tasks,whereas a network diagram does not show time overlap but does show which tasks could be done in parallel.
C)Gantt charts visually show the time overlap of tasks,whereas a network diagram shows time overlap but does show which tasks could be done in parallel.
D)Some forms of Gantt charts can visually show slack time available within an earliest start and latest finish duration.
Question
Problem solving is a skill required in the conflict management activity for a project manager.
Question
________ is the third phase of the project management process in which the plans created in the prior phases (project initiation and planning)are put into action.

A)Project execution
B)Project closure
C)Project development
D)Project planning
Question
The project manager is a systems analyst with a diverse set of skills-management,leadership,technical,conflict management,and customer relationship-who is responsible for initiating,planning,executing,and closing down a project.
Question
Which of the following is the first activity in the project execution phase?

A)Communicating the project status
B)Managing changes to the Baseline Project Plan
C)Maintaining the project workbook
D)Executing the Baseline Project Plan
Question
Which of the following is NOT true about project closedown?

A)It brings the project to an end.
B)Projects can conclude with a natural or unnatural termination.
C)Unnatural termination of a project can never happen.
D)An unnatural termination occurs when the project is stopped before completion.
Question
Executing the project is the third phase in the project management process.
Question
Successful projects require the development of effective management procedures.
Question
The project charter is a short (typically one page),high-level document prepared for the customer that describes what the project will deliver and outlines many of the key elements of the project.
Question
There are 10 activities in total which are involved in the project planning phase.
Question
In order,what are the four steps in the project management process?
Question
What is a project manager? What types of skills should a project manager possess?
Question
What does project planning involve?
Question
The most widely used method for cost estimation is COCOMO.
Question
What is a project charter? Describe elements that may be a part of the project charter.
Question
Why are systems development projects initiated? Provide an example.
Question
A network diagram depicts a Gantt chart.
Question
Defining a task with too little detail will make the project complex.
Question
Establishing a relationship with the customer is the first step in project initiation.
Question
What is COCOMO and how is it used?
Question
List the six project initiation activities.
Question
What are the ways a project can close? Provide an example of each.
Question
List at least 3 activities of a project manager and the skill associated with that activity.
Question
Name four ways a project team can communicate.Indicate the type of formality,i.e.,high,medium to low,etc.
Question
What does a project manager do during the project execution phase? List the steps in the project execution phase.
Question
The Project Workbook is an offline or hard-copy repository for all project correspondence,inputs,outputs,deliverables,procedures,and standards that is used for performing project audits,orienting new team members,communicating with management and customers,identifying future projects,and performing post-project reviews.
Question
The project charter often includes a signature section for key stakeholders and key assumptions.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/97
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 3: Managing the Information Systems Project
1
A ________,which is conducted by the project manager,involves determining if the information system makes sense for the organization from an economic and operational standpoint.

A)Tool
B)Feasibility study
C)Data flow
D)Methodology
B
2
________ is NOT a skill pertaining to the team management activity of a project manager.

A)Self-management
B)Team-building
C)Peer-evaluation
D)Forecasting
D
3
To successfully orchestrate the construction of a complex information system,a project manager must have ________,leadership,and technical skills.

A)Planning
B)Initiating
C)Executing
D)Interpersonal
D
4
________ is NOT a skill pertaining to the management activity of a project manager.

A)Monitoring outcomes
B)Assigning resources to activities
C)Communicating expectations
D)Forecasting
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
5
________ is NOT a common skill pertaining to the leadership activity of a project manager.

A)Communication
B)Working on assigned activities
C)Assigning activities
D)Monitoring progress
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
6
________ is a controlled process of initiating,planning,executing,and closing down a project.

A)System design
B)System analysis
C)Project scheduling
D)Project management
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
7
Identifying,assessing,and managing the risks and day-to-day changes that occur during a project is attributed to ________.

A)Forecasting
B)Team-building
C)Goal setting
D)Risk and change management
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
8
The ________ is a systems analyst with a diverse set of skills-management,leadership,technical,conflict management,and customer relationship-who is responsible for initiating,planning,executing,and closing down a project.

A)Consultant
B)Project scheduler
C)Project manager
D)Project assistant
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
9
Working closely with customers to ensure that project deliverables meet expectations is a ________ activity of a project manager.

A)Resource redeployment
B)Forecasting
C)Management
D)Customer relations
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
10
Managing the project team for effective team performance represents a ________ activity of a project manager.

A)Leadership
B)Change management
C)Risk management
D)Team management
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
11
Which of the following is NOT a part of the project management process?

A)Planning
B)Initiating
C)Executing
D)Adjoining
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
12
Influencing the activities of others toward the attainment of a common goal through the use of intelligence,personality,and abilities refers to the ________ activity of a project manager.

A)Management
B)Leadership
C)Team management
D)Conflict management
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
13
________ is NOT a skill pertaining to the technical problem solving activity of a project manager.

A)Contact point for payroll team
B)Defining activities and their sequence
C)Making trade-offs between alternative solutions
D)Interpreting system requests and specifications
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
14
________ is NOT a skill pertaining to the customer relations activity of a project manager.

A)Interpreting system requests
B)Interpreting system specifications
C)Contact point for developers
D)User training
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
15
________ is NOT a skill pertaining to the conflict management activity of a project manager.

A)Problem solving
B)Smoothing out personality differences
C)Monitoring
D)Compromising
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
16
________ is NOT a skill pertaining to the risk and change management activity of a project manager.

A)Environmental scanning
B)Team-building
C)Risk and opportunity identification and assessment
D)Resource redeployment
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
17
A ________ is a planned undertaking of a series of related activities to reach an objective that has a beginning and an end.

A)Project
B)Technique
C)Data flow
D)Methodology
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
18
A ________ is an end product of an SDLC phase.

A)System tester
B)Requirement
C)Modeler
D)Deliverable
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
19
Getting projects completed through the effective utilization of resources is a ________ activity of a project manager.

A)Management
B)Risk management
C)Change management
D)Team management
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
20
Which of the following is NOT an activity found in the project initiation phase?

A)Establishing the project initiation team
B)Establishing a relationship with the developer
C)Establishing the project initiation plan
D)Establishing management procedures
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
21
Which is the first activity in the project planning phase?

A)Setting a baseline project plan
B)Creating a preliminary budget
C)Identifying and assessing risk
D)Describing project scope,alternatives,and feasibility
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
22
________ is the process of dividing the project into manageable tasks and logically ordering them to ensure a smooth evolution between tasks.

A)Work breakdown structure
B)Task breakdown structure
C)Project breakdown structure
D)Management breakdown structure
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
23
Which of the following is FALSE in the context of the project workbook?

A)It can be stored as an online electronic document.
B)It can be stored in a large three-ring binder.
C)The project workbook is used by all team members.
D)It is not useful for project audits.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
24
Defining tasks in too much detail will make the management of the project ________.

A)Unnecessarily complex
B)Simple
C)Extremely streamlined
D)Constructive
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
25
Tasks that are ________ in scope will provide a clear sense of the status of the project or of the interdependencies between tasks.

A)Short
B)Medium
C)Long
D)Optimal
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
26
Most project management software tools support a broad range of task durations,including minutes,hours,days,weeks,and ________.

A)Months
B)Years
C)Centuries
D)Decades
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
27
How many activities are involved in the project initiation phase?

A)Four
B)Five
C)Six
D)Three
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
28
What is the next step taken after project initiation?

A)Project bidding
B)Project planning
C)Project execution
D)Project development
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
29
Which of the following is FALSE with respect to a task in a project plan?

A)It can be done by one person only.
B)It has a single and identifiable deliverable.
C)It has a known method or technique.
D)It has well-accepted predecessor and successor steps.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
30
A Gantt chart is the graphical representation of a project that shows each task as a ________ bar whose length is proportional to its time for completion.

A)vertical
B)linear
C)curve
D)horizontal
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
31
Which of the following is NOT true with respect to determining project standards and procedures?

A)Specifies how various deliverables are produced and tested
B)Specifies how the standard SDLC might be modified
C)Specifies which SDLC methods will be used
D)Specifies the budget and resource allocation
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
32
Which of the following is FALSE with respect to resource estimation activity?

A)This information is used to create a project resource plan.
B)Project managers use a variety of tools to assist in making estimates of project size and costs.The most widely used method is called COCOMO.
C)Resource estimates may need not be revised based upon the skills of the actual person (or people)assigned to a particular activity.
D)People are the most important,and expensive,part of project resource planning.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
33
Resource estimates may need to be revised based upon the skills of the actual person (or people)assigned to a particular ________.

A)Activity
B)Group
C)Person
D)Team
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
34
The distinguishing feature of a network diagram is that the ordering of tasks is shown by connecting tasks-depicted as ________ or ovals-with their predecessor and successor tasks.

A)Circles
B)Diamonds
C)Ellipticals
D)Rectangles
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
35
Which of the following is NOT true of a project communication plan?

A)It outlines the communication procedures among management,project team members,and the customer.
B)It includes when and how written and oral reports will be provided by the team.
C)It does not define communication with vendors and external contractors.
D)It includes how team members will coordinate work.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
36
During ________,the project manager performs several activities to assess the size,scope,and complexity of the project and to establish procedures to support subsequent activities.

A)Project bidding
B)Project development
C)Project initiation
D)Project delivery
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
37
Which of the following is a FALSE statement regarding the Project Scope Statement?

A)It occurs near the end of the project planning phase.
B)It is developed primarily for the customer.
C)It clearly describes what the project will deliver.
D)It is a description of the alternative solution.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
38
The project charter will never include which of the following?

A)Project objectives and description
B)Project budget
C)Projected start and completion dates
D)Key stakeholders,project role,and responsibilities
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
39
Which of the following is FALSE in the context of the project charter?

A)It will not have the project manager's name and contact information.
B)It includes the project title and date of authorization.
C)It outlines many of the key elements of the project.
D)It is a high-level document prepared for the customer.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
40
COCOMO stands for ________.

A)Constructive Coordination Model
B)Constructive Cost Model
C)Collective Cost Model
D)Constructive Correction Model
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
41
Which of the following is NOT a stakeholder involved in the project communication matrix?

A)Team members
B)Facilities team
C)User group
D)Contract programmers
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
42
Closing down a project is not an activity performed in the project management process.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
43
Systems development projects are undertaken for two primary reasons: to take advantage of business opportunities and to solve business problems.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
44
In project initiation,the developer performs several activities to assess the size,scope,and complexity of the project and to establish procedures to support subsequent activities.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
45
Designing and sequencing activities to attain project goals describes the technical problem solving activity.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
46
An example of a project manager leadership activity is helping the team work towards a common goal.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
47
At the end of the project planning phase,________ of the Baseline Project Plan is conducted to double-check all information in the plan.

A)Rating
B)Testing
C)Review
D)Planning
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
48
In some organizations,the project manager is a very experienced systems analyst,whereas in others,both junior and senior analysts are expected to take on this role,managing parts of a project or actively supporting a more senior colleague who assumes the project manager role.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
49
Interpreting system requests and specifications is not a skill required as part of the customer relations activity for a project manager.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
50
A project is an unplanned undertaking of a series of related activities to reach an objective that has a beginning and an end.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
51
A study that determines if the proposed information system makes sense for the organization from an economic and operational standpoint is called non-feasibility study.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
52
________ are used by project managers to depict resource utilization by task.

A)Textual reports
B)Bar graphs
C)Pie charts
D)Flow charts
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
53
The last deliverable,or end product,produced by Chris and Juanita was a System Service Request (SSR),a standard form PVF uses for requesting systems development work.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
54
Which of the following is FALSE with respect to the Gantt chart and network diagram?

A)Gantt charts visually show the duration of tasks,whereas a network diagram visually shows the sequence dependencies between tasks.
B)Gantt charts visually show the time overlap of tasks,whereas a network diagram does not show time overlap but does show which tasks could be done in parallel.
C)Gantt charts visually show the time overlap of tasks,whereas a network diagram shows time overlap but does show which tasks could be done in parallel.
D)Some forms of Gantt charts can visually show slack time available within an earliest start and latest finish duration.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
55
Problem solving is a skill required in the conflict management activity for a project manager.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
56
________ is the third phase of the project management process in which the plans created in the prior phases (project initiation and planning)are put into action.

A)Project execution
B)Project closure
C)Project development
D)Project planning
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
57
The project manager is a systems analyst with a diverse set of skills-management,leadership,technical,conflict management,and customer relationship-who is responsible for initiating,planning,executing,and closing down a project.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
58
Which of the following is the first activity in the project execution phase?

A)Communicating the project status
B)Managing changes to the Baseline Project Plan
C)Maintaining the project workbook
D)Executing the Baseline Project Plan
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
59
Which of the following is NOT true about project closedown?

A)It brings the project to an end.
B)Projects can conclude with a natural or unnatural termination.
C)Unnatural termination of a project can never happen.
D)An unnatural termination occurs when the project is stopped before completion.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
60
Executing the project is the third phase in the project management process.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
61
Successful projects require the development of effective management procedures.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
62
The project charter is a short (typically one page),high-level document prepared for the customer that describes what the project will deliver and outlines many of the key elements of the project.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
63
There are 10 activities in total which are involved in the project planning phase.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
64
In order,what are the four steps in the project management process?
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
65
What is a project manager? What types of skills should a project manager possess?
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
66
What does project planning involve?
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
67
The most widely used method for cost estimation is COCOMO.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
68
What is a project charter? Describe elements that may be a part of the project charter.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
69
Why are systems development projects initiated? Provide an example.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
70
A network diagram depicts a Gantt chart.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
71
Defining a task with too little detail will make the project complex.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
72
Establishing a relationship with the customer is the first step in project initiation.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
73
What is COCOMO and how is it used?
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
74
List the six project initiation activities.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
75
What are the ways a project can close? Provide an example of each.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
76
List at least 3 activities of a project manager and the skill associated with that activity.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
77
Name four ways a project team can communicate.Indicate the type of formality,i.e.,high,medium to low,etc.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
78
What does a project manager do during the project execution phase? List the steps in the project execution phase.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
79
The Project Workbook is an offline or hard-copy repository for all project correspondence,inputs,outputs,deliverables,procedures,and standards that is used for performing project audits,orienting new team members,communicating with management and customers,identifying future projects,and performing post-project reviews.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
80
The project charter often includes a signature section for key stakeholders and key assumptions.
Unlock Deck
Unlock for access to all 97 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 97 flashcards in this deck.