Two industrial loads are supplied by a source through a transmission line with an impedance of Z L = 0.1 + j 0.2 .
Load 1: 44 kW at 0.82 pf lagging
Load 2: 64 kW at 0.92 pf lagging
If the voltage at the loads is 240 0° Vrms. Determine the power factor of the source.
Load 1: 44 kW at 0.82 pf lagging
Load 2: 64 kW at 0.92 pf lagging
If the voltage at the loads is 240 0° Vrms. Determine the power factor of the source.
Explanation
The following is the arrangement of the ...