Exam 12: Ensuring Quality in Picture Archiving and Communication Systems
Exam 1: Introduction to Digital Radiography and Picture Archiving and Communication Systems39 Questions
Exam 2: Digital Imaging Characteristics24 Questions
Exam 3: Digital Radiographic Image Processing and Manipulation45 Questions
Exam 4: Photostimulable Phosphor Image Capture44 Questions
Exam 5: Thin-Film Transistor Flat-Panel Array Image Acquisition25 Questions
Exam 6: Charge-Coupled Devicecomplementary Metal Oxide Semiconductor Image Capture25 Questions
Exam 7: Basic Computer Principles40 Questions
Exam 8: Networking and Communication Basics39 Questions
Exam 9: Picture Archiving and Communication System Fundamentals30 Questions
Exam 10: Picture Archiving and Communication System Archiving and Peripherals31 Questions
Exam 11: Medical Informatics24 Questions
Exam 12: Ensuring Quality in Picture Archiving and Communication Systems34 Questions
Exam 13: Quality Acceptance Testing Within Digital Projection Imaging30 Questions
Select questions type
Annual testing and acceptance testing should be performed by a
(Multiple Choice)
4.8/5
(39)
The transfer speed from the modalities is checked monthly until
(Multiple Choice)
4.8/5
(36)
Image transfer is monitored from the modality to PACS and from the archive to
(Multiple Choice)
4.8/5
(32)
After you perform a test function for workstation processing speed,the next step is to measure and
(Multiple Choice)
4.8/5
(34)
Testing that can catch problems before they may become radiographically apparent is called ______ maintenance.
(Multiple Choice)
4.8/5
(29)
Which of the following is not a QC activity that should be monitored in a PACS environment?
(Multiple Choice)
4.8/5
(27)
What is most often the weakest link in the digital imaging chain?
(Multiple Choice)
4.8/5
(28)
"A comprehensive set of activities designed to monitor and maintain systems that produce a product" is the definition of
(Multiple Choice)
4.9/5
(36)
Whereas QA/QC programs focus on ______ quality,CQI focuses on ______ the process.
(Multiple Choice)
4.9/5
(34)
Testing performed before newly installed or majorly repaired equipment can be accepted by the department is called ______ testing.
(Multiple Choice)
4.8/5
(42)
Showing 21 - 34 of 34
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)