Exam 19: How to Use Distance Calculations and Cost Distance in Arcgis Pro
Exam 1: How to Use Geospatial Data With Arcgis Pro20 Questions
Exam 2: How to Use Tables, Attributes, and Queries in Arcgis Pro18 Questions
Exam 3: How to Create a Layout With Arcgis Pro18 Questions
Exam 4: How to Publish Layers From Arcgis Pro and Build Web Apps With Arcgis Online12 Questions
Exam 5: How to Obtain Online Gis Data and Use Them in Arcgis Pro17 Questions
Exam 6: How to Create Geospatial Data With Arcgis Pro21 Questions
Exam 7: How to Edit Data With Arcgis Pro17 Questions
Exam 8: How to Perform Spatial Analysis in Arcgis Pro17 Questions
Exam 9: How to Perform Geoprocessing in Arcgis Pro10 Questions
Exam 10: How to Perform Geocoding in Arcgis Pro8 Questions
Exam 11: How to Perform Network Analysis in Arcgis Pro15 Questions
Exam 12: How to Use Raster Data in Arcgis Pro16 Questions
Exam 13: How to Use Remotely Sensed Imagery in Arcgis Pro21 Questions
Exam 14: How to Perform Spatial Interpolation With Arcgis Pro15 Questions
Exam 15: How to Work With Digital Elevation Models in Arcgis Pro16 Questions
Exam 16: How to Work With Contours, Tins, and 3D Imagery in Arcgis Pro17 Questions
Exam 17: How to Work With Lidar Data in Arcgis Pro12 Questions
Exam 18: How to Represent Geospatial Data in 3d With Arcgis Pro10 Questions
Exam 19: How to Use Distance Calculations and Cost Distance in Arcgis Pro12 Questions
Exam 20: How to Perform Map Algebra in Arcgis Pro15 Questions
Exam 21: How to Build a Model in Arcgis Pro10 Questions
Exam 22: How to Use Hydrologic Modeling Tools in Arcgis Pro18 Questions
Select questions type
The total cost of traveling from a source to a grid cell is:
Free
(Multiple Choice)
4.8/5
(25)
Correct Answer:
A
Which of the following procedures allows you to create a new grid by assigning new grid- cell values to an existing raster?
Free
(Multiple Choice)
4.8/5
(29)
Correct Answer:
D
A lateral link between two grid cells (where one cell has a value of 7 and the other cell has a value of 10) has a cost of:
Free
(Multiple Choice)
4.9/5
(32)
Correct Answer:
B
Which of the following procedures will group several grid-cell values together according to a classification scheme?
(Multiple Choice)
4.8/5
(35)
In ArcGIS, which of the following tools will determine the least-cost path?
(Multiple Choice)
4.8/5
(43)
Which of the following operations assigns grid cells to their closest source grid cell?
(Multiple Choice)
4.8/5
(36)
The set of grid cells that represents the lowest value for accumulated cost to move from a source to a destination is:
(Multiple Choice)
4.7/5
(42)
A diagonal link between two grid cells (assuming both the grid cells have a value of 1) has a cost of:
(Multiple Choice)
5.0/5
(39)
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)