Exam 16: Economic Analysis in the Service Sector

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

A local government is considering promoting tourism in the city. It will cost $5,000 to develop the plan. The anticipated annual benefits and costs are as follows: · Annual benefits: Increased local income and tax collections $117,400 · Annual support service: parking lot expansion, rest room, patrol car, and street repair $48,830 If the city government uses a discount rate of 6% and a study period of 5 years, is this tourism project justifiable according to the benefit-cost analysis?

Free
(Essay)
4.9/5
(42)
Correct Answer:
Verified

The U.S. Department of Interior is planning to build a dam and construct a hydroelectric power plant. In addition to producing electric power, this project will provide flood control, irrigation, and recreational benefits. The estimated benefits and costs expected to be derived from the three alternatives under consideration are listed as follows: The U.S. Department of Interior is planning to build a dam and construct a hydroelectric power plant. In addition to producing electric power, this project will provide flood control, irrigation, and recreational benefits. The estimated benefits and costs expected to be derived from the three alternatives under consideration are listed as follows:   The interest rate is 5%, and the life of each project is estimated to be 40 years. (a) Find the benefit-cost ratio for each alternative. (b) Select the best alternative, according to BC(i). The interest rate is 5%, and the life of each project is estimated to be 40 years. (a) Find the benefit-cost ratio for each alternative. (b) Select the best alternative, according to BC(i).

Free
(Essay)
4.9/5
(33)
Correct Answer:
Verified

A city government is considering increasing the capacity of the current wastewater treatment plant. The estimated financial data for the project are as follows: A city government is considering increasing the capacity of the current wastewater treatment plant. The estimated financial data for the project are as follows:   Calculate the benefit-cost ratio for this capacity expansion project. Calculate the benefit-cost ratio for this capacity expansion project.

Free
(Essay)
4.8/5
(35)
Correct Answer:
Verified