Exam 11: Conversion Processes and Controls

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

For which of the following computerized conversion systems is Wal-Mart well known?

(Multiple Choice)
4.9/5
(34)

Ethical issues of manufacturing include all except:

(Multiple Choice)
4.8/5
(34)

Physical controls include all but:

(Multiple Choice)
5.0/5
(38)

The form that authorizes production activities for a particular sales order or forecasted needs is referred to as the:

(Multiple Choice)
4.9/5
(42)

Engineering is responsible for:

(Multiple Choice)
4.8/5
(41)

The issuance and movement of materials into the various production phases is referred to as:

(Multiple Choice)
4.8/5
(27)

The department responsible for training production personnel is the:

(Multiple Choice)
4.9/5
(28)

The activity in the conversion process that does NOT require express authorization is the:

(Multiple Choice)
4.8/5
(38)

Within the logistics function, segregation of duties means:

(Multiple Choice)
4.8/5
(37)

Physical inventory counts should only include:

(Multiple Choice)
5.0/5
(31)

The form that specifies the components of a product, including descriptions and quantities of materials and parts needed is the:

(Multiple Choice)
4.9/5
(38)

The responsibility to conduct make/buy decisions is usually given to:

(Multiple Choice)
4.8/5
(39)

_____________ integrates all of the conversion processes to allow for minimal disruptions due to reporting requirements or inventory movement issues.

(Multiple Choice)
4.9/5
(39)

According to the textbook, which of the following are the two specific ways in which a company may recognize the need to conduct operations?

(Multiple Choice)
4.8/5
(40)

Which of the following is not considered a benefit of using computerized conversion systems?

(Multiple Choice)
4.7/5
(32)

When additional procedures are necessary to bring a defective product up to its required specifications, this is referred to as

(Multiple Choice)
4.8/5
(47)

Standard costs are the:

(Multiple Choice)
4.8/5
(43)

Which of the following correctly lists activities within the conversion process in chronological order?

(Multiple Choice)
4.7/5
(29)

Routing is the:

(Multiple Choice)
4.7/5
(40)

The final hub in the logistics function is:

(Multiple Choice)
4.8/5
(28)
Showing 21 - 40 of 105
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)