Exam 7: The Conversion Cycle

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

How does automation help achieve manufacturing flexibility?

(Essay)
4.8/5
(32)

A company's value stream includes all steps in a process,both essential and non-essential,for which the customer is willing to pay.

(True/False)
5.0/5
(35)

Computer Integrated Manufacturing focuses on reducing the complexity of the physical manufacturing layout of the shop floor.

(True/False)
4.9/5
(37)

What document signals the completion of the production process?

(Essay)
5.0/5
(34)

Characteristics of lean manufacturing include all of the following except

(Multiple Choice)
4.8/5
(34)

Which of the following statements about the EOQ inventory model assumptions is incorrect?

(Multiple Choice)
4.8/5
(41)

Which statement is not correct?

(Multiple Choice)
5.0/5
(36)

Typically the only allocated cost in the value stream is a charge per square foot for the value stream production facility.

(True/False)
5.0/5
(41)

The purpose of the cost accounting system is to

(Multiple Choice)
4.8/5
(43)

Explain why traditional cost allocation methods fail in a CIM environment.

(Essay)
4.9/5
(35)

A flexible manufacturing system

(Multiple Choice)
4.7/5
(38)

The internal control significance of the excess materials requisition is that it

(Multiple Choice)
4.8/5
(37)

The philosophy of customer satisfaction permeates the world-class firm.

(True/False)
4.9/5
(39)

A purchase requisition authorizes the storekeeper to release materials to individuals or work centers in the production process.

(True/False)
4.9/5
(38)

What are the key segregation of duties issues in the conversion cycle?

(Essay)
4.9/5
(42)

Accounting in a world-class manufacturing environment emphasizes standard cost and variance analysis.

(True/False)
4.9/5
(33)

Itemize the disadvantages of ABC that have caused some firms to abandon this technique.

(Essay)
4.9/5
(43)

Which process creates a homogeneous product through a continuous series of standard procedures?

(Multiple Choice)
4.8/5
(37)

Automation is at the heart of the lean manufacturing philosophy.Discuss its stages and its distinguishing features.

(Essay)
4.7/5
(40)

The two subsystems of a traditional conversion cycle are the production system and the delivery system.

(True/False)
4.8/5
(34)
Showing 41 - 60 of 102
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)