Exam 13: Managing the Systems Development Life Cycle

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Project planning includes all of the following except

(Multiple Choice)
5.0/5
(47)

A disadvantage of surveying the current system is

(Multiple Choice)
4.9/5
(38)

The systems analysis report does not

(Multiple Choice)
4.9/5
(34)

What is competency analysis and why do managers do it.

(Essay)
4.8/5
(33)

When developing the conceptual design of a system,

(Multiple Choice)
4.8/5
(41)

When studying the detailed feasibility of a new project

(Multiple Choice)
4.8/5
(34)

Explain the role of accountants in the conceptual design stage.

(Essay)
5.0/5
(38)

The accountant's role in systems analysis includes all of the following except

(Multiple Choice)
4.7/5
(35)

Why is cost-benefit analysis more difficult for information systems than for many other types of investments organizations make?

(Essay)
4.9/5
(39)

The degree of compatibility between the firm's existing procedures and personnel skills and the requirements of the new system is called

(Multiple Choice)
4.8/5
(38)

Project initiation is the process by which systems proposals are assessed for consistency with the strategic systems plan and evaluated in terms of their feasibility and cost-benefit characteristics.

(True/False)
4.8/5
(41)

Define the feasibility measures that should be considered during project analysis and give an example of each.

(Essay)
4.8/5
(38)

Why is the payback method often more useful than the net present value method for evaluating systems projects?

(Essay)
4.8/5
(33)

The Systems Development Life Cycle (SDLC)concept applies to specific applications and not to strategic systems planning.

(True/False)
4.8/5
(26)

During the detailed feasibility study of the project,the systems professional who proposed the project should be involved in performing the study.

(True/False)
4.8/5
(35)

What is the learning and growth perspective?

(Essay)
4.9/5
(33)

Explain an advantage of surveying the current system when preparing a systems analysis for a new systems project.

(Essay)
4.9/5
(44)

Intangible benefits

(Multiple Choice)
4.9/5
(33)

Which of the following is not a tool of systems analysts?

(Multiple Choice)
4.8/5
(38)

What is industry analysis and why do managers do it?

(Essay)
4.9/5
(33)
Showing 21 - 40 of 93
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)