The ____ contains details of metal connectors and miscellaneous materials.
Free
(Multiple Choice)
4.9/5
(34)
Correct Answer:
B
Selecting a baseplate connection is the ____ responsibility.
Free
(Multiple Choice)
4.9/5
(32)
Correct Answer:
D
In counting material quantities, the drafter should be careful to count according to ____ and not according to the picture presented by the fabrication detail.
Free
(Multiple Choice)
4.8/5
(36)
Correct Answer:
B
Standard forms used for a bill of materials vary from company to company; however, all forms include standard information. List four common entries found on these forms.
(Essay)
4.8/5
(43)
The six basic ____ connections used in precast concrete construction each use the same connection procedure: a long threaded rod is cast into the top of the column that protrudes a distance equal to the thickness of the beam it will support.
(Multiple Choice)
4.8/5
(33)
When each ____ finishes the bill of materials in his area of responsibility, the resultant bills may be stapled together and used as one complete bill for the entire job.
(Multiple Choice)
4.8/5
(41)
One of two basic types of drawings cutting through an entire building or structure, ____ cut across the entire width of a building.
(Multiple Choice)
4.9/5
(35)
All stranding information required on floor/roof fabrication details is taken from the ____.
(Multiple Choice)
4.9/5
(38)
Given the dimension statement 14 SP @ 1'-0" = 14'-0" for 401 bars designated in a flat slab illustration, what is the quantity of 401 bars?
(Multiple Choice)
4.8/5
(34)
The ____ job is to draw orthographic fabrication details based on the engineer's design.
(Multiple Choice)
4.8/5
(40)
Bills of materials for precast concrete jobs are prepared from the ____.
(Multiple Choice)
4.8/5
(30)
____ are often used in precast concrete drafting to clarify isolated portions of a structure.
(Multiple Choice)
4.9/5
(35)
The ____ is a form showing a number of bar diagrams with letters substituted for dimensions.
(Multiple Choice)
4.9/5
(37)
____ are comprehensive, precisely detailed drawings prepared for use by shop workers in fabricating precast concrete products and the metal connectors they contain.
(Multiple Choice)
4.8/5
(35)
One of the two sources used by precast concrete CAD technicians in preparing sectional drawings is the ____ from which the framing plans were prepared.
(Multiple Choice)
4.8/5
(30)
____ are drawings that show the materials used in a job and how they fit together to form a completed structure.
(Multiple Choice)
4.8/5
(41)
The most common method used in the preparation of a bill of materials is to prepare ____.
(Multiple Choice)
4.9/5
(37)
Which of the following is an example of an entry for "Type of Product" on the bill of materials?
(Multiple Choice)
5.0/5
(32)
____ are orthographic drawings of precast concrete beams, columns, wall panels, roof/floor members, and metal connectors.
(Multiple Choice)
4.8/5
(33)
A ____ is a bearing surface that is cast onto a column or wall panel as a secondary pour that supports beams or roof members after erection.