Exam 11: Project Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Leaving work documentation until after the whole project is complete is typically the most effective strategy

Free
(True/False)
4.8/5
(34)
Correct Answer:
Verified

False

The technique where each task is represented by a box that contains a brief description of and duration for the task is known as:

Free
(Multiple Choice)
4.8/5
(35)
Correct Answer:
Verified

A

A GANTT chart is

Free
(Multiple Choice)
4.9/5
(38)
Correct Answer:
Verified

A

The first step in project planning is which of the following?

(Multiple Choice)
4.9/5
(36)

A Liaison within a team defines someone who is the project leader

(True/False)
4.8/5
(34)

The concept of critical path originates from which engineering discipline?

(Multiple Choice)
4.9/5
(37)

Milestones are typically assessed only after the entire project is completed

(True/False)
4.9/5
(29)

The technique where each tasks are plotted versus time is known as:

(Multiple Choice)
4.9/5
(33)

A PERT chart is

(Multiple Choice)
4.7/5
(40)

The team role involving Procurement needs to be knowledgeable about the purchasing system in the organization

(True/False)
4.9/5
(32)
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)