Exam 6: Surveying: Instruments, Techniques, and Terminology
Exam 1: Stones, Sand, and Lime25 Questions
Exam 2: Cement and Brick Earth - Properties and Testing25 Questions
Exam 3: Bricks, Trees, and Aggregates25 Questions
Exam 4: Building Materials and Masonry Techniques25 Questions
Exam 5: Building Materials and Construction Techniques25 Questions
Exam 6: Surveying: Instruments, Techniques, and Terminology25 Questions
Exam 7: Surveying and Levelling Techniques and Contouring Methods25 Questions
Exam 8: Surveying and Construction19 Questions
Select questions type
Plane and geodetic surveying are classifications of surveying based on:
Free
(Multiple Choice)
4.9/5
(28)
Correct Answer:
B
The process of a location of intermediate points on a survey line is:
Free
(Multiple Choice)
4.8/5
(36)
Correct Answer:
C
Which of the below is not an instrument used to set right angles?
(Multiple Choice)
4.7/5
(40)
The bearing of line AB as shown below is represented in reduced bearing as:
(Multiple Choice)
4.9/5
(35)
___________ bearing is measured in the direction of survey.
(Multiple Choice)
4.8/5
(35)
________ is a term used that prevents the needle from pointing to the magnetic North in a given locality.
(Multiple Choice)
4.7/5
(35)
Which of the below is not a means of linear surveying methods?
(Multiple Choice)
4.7/5
(32)
An offset is a _________ distance of an object measured from the survey line.
(Multiple Choice)
4.7/5
(46)
Showing 1 - 20 of 25
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)