Exam 6: Construction and Building Foundations

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

For D.P.C. at plinth level, the commonly adopted material is

(Multiple Choice)
4.9/5
(27)

A tomparary structure constructed in a river for excluding water from a given site to enable the building operation to be performed on dry surface, is called

(Multiple Choice)
4.9/5
(35)

For ordinary Portland cement, the initial setting time should not be more than

(Multiple Choice)
4.9/5
(46)

The depth of arch is the

(Multiple Choice)
4.8/5
(38)

The pitch of stair should never exceed

(Multiple Choice)
4.8/5
(26)
Showing 21 - 25 of 25
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)