In …………….. contract the contractor will get cost plus stipulated profit
Free
(Multiple Choice)
4.8/5
(37)
Correct Answer:
B
In a contract costing payment of cash to the contract is made on the basis of …………………………. Work
Free
(Multiple Choice)
4.9/5
(33)
Correct Answer:
A
Contract costing is a basic method of …………….. costing
Free
(Multiple Choice)
4.9/5
(33)
Correct Answer:
A
When the competition stage of a contract is less than ¼ , the total expenditure on the contract is transferred to ………… account
(Multiple Choice)
4.9/5
(40)
A cost do not change with changes in the level of activity is ………….
(Multiple Choice)
4.9/5
(38)
……………….. process loss should be transferred to costing profit and loss account
(Multiple Choice)
4.9/5
(35)
………… is an important point to be determined in industries where batch costing is employed
(Multiple Choice)
4.8/5
(41)
……… is the difference b/w the sales and marginal cost of sale
(Multiple Choice)
4.8/5
(44)
The loss incurred on an incomplete contract is transferred to ……… account
(Multiple Choice)
4.8/5
(37)
The cost of ……….. process loss is absorbed in the cost of production of good units
(Multiple Choice)
4.8/5
(35)
When a contract is debited with the original cost of the plant , it should credited with ………… at the end of the year
(Multiple Choice)
4.8/5
(37)
In job costing the production is generally against customers …………………. but not for stock
(Multiple Choice)
4.7/5
(42)
The method of costing applied in biscuit industries is …………………….
(Multiple Choice)
4.7/5
(31)
Where raw material is to pass certain stages before it is converted into finished goods, the method of costing used is ……………………
(Multiple Choice)
4.9/5
(40)
Scope of specific order costing is very wide and includes ……. ,………, ………….
(Multiple Choice)
4.9/5
(37)
In a contract costing most of the items of cost are ……………..
(Multiple Choice)
4.8/5
(33)
Average unit cost for each process is calculated by dividing ……………..by …………….
(Multiple Choice)
4.9/5
(30)
When the completion stage of the contract is more than half, the profit to be credited to P/L a/c will be equal to ………………..
(Multiple Choice)
5.0/5